Original source · versioned page text
2014-01-13 Item 6.3 Appendices 1-5
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
The DCS must include details of all approved de-amalgamation costs paid. The
DCS must be certified by both the CCEO and transfer manager and provided to the
Director-General no later than seven days after the end of each calendar month.
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.