Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Bushfire management

of 44

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (109 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                               FIRE MANAGEMENT REPORT FM 5601




      PERFORMANCE                  ACCEPTABLE OUTCOMES                    COMMENTS
      OUTCOMES
      PO1                          AO1.1
      Development maintains        Development which will materially      The proposed development is
      the safety of people         increase the number of people          not located within a medium or
                                   living or congregating on              high bushfire hazard area.
                                   premises, including reconfiguring
                                   a lot, is not located within a
                                   medium or high bushfire hazard
                                   area.

                                   AO1.2
                                   Development maximises setbacks
                                   from hazardous vegetation to           Setbacks from hazardous
                                   achieve an acceptable risk             vegetation is maximised to
                                                                          achieve an acceptable risk,
                                                                          demonstrated that only one
                                                                          building will be within 100m of
                                                                          threat vegetation
      PO2
      Bushfire mitigation          No acceptable outcome provided         The proposed development is
      measures do not                                                     situated within a cleared portion
      adversely impact on:                                                of the site and rehabilitation
           (a) Biodiversity                                               based on Low Threat
                values,                                                   vegetation is required within the
                connectivity,                                             water way corridor.
                and ecosystem
                functioning; and
           (b) The long-term
                physical
                integrity of
                waterways,
                wetland, and
                areas of native
                vegetation
      PO3                          AO3.1
      Development provides         Premises are connected to the          The premises will be served by
      an adequate water            reticulated water supply               reticulated water
      supply for firefighting
      purpose which is reliable,   OR
      safely located and freely
      accessible.                  AO3.2
                                   Where there is no available
                                   reticulated water supply, the
                                   premises has:
                                        (a) An accessible dam,
                                             swimming pool or water
                                             tank available for
                                             firefighting purposes with
                                             an onsite water volume
                                             of not less than 5,000
                                             litres; and
                                        (b) A water supply outlet
                                             pipe of 50 mm in
                                             diameter fitted with a
                                             standard fire brigade
                                             fitting connected to the
                                             water supply (other than
                                             where the water supply
                                             is in a swimming pool or
                                             dam)




ELDON BOTTCHER ARCHITECT PTY LTD                    ©             27/01/22                              40
Log in to download the original file

Bushfire management.pdf · 109 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.