Original source · versioned page text
Approved Plans - MCU21/0221
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn e) avoiding causing ingress of saline water into
freshwater aquifers of wetlands; and
f) avoiding contaminants entering groundwater (e.g.
from runoff, effluent disposal).
Rehabilitation of ecologically important areas
PO10 AO10.1 AO10.1 - Site landscaping and ecological
Development provides for ecologically Landscaping and rehabilitation complements and supports rehabilitation are proposed to comply with AO10.1
important areas to be restored and ecologically important areas by: and can be conditioned by Council.
enhanced through: a) utilising local native species;
a) designing landscaped areas to b) utilising suitable plant species identified in PSP2
complement and enhance existing Landscaping;
vegetation and ecological linkages; c) restoring degraded ecosystems to achieve a
b) removing species likely to displace functional ecosystem state that requires minimal
native flora species or degrade human intervention;
fauna habitat; d) replicating adjacent remnant habitats of the same
c) replanting and rehabilitating type, including the understorey vegetation;
degraded habitat; e) creating or enhancing linkages between existing
d) replacing any vegetation removed habitats;
with suitable local native species; f) avoiding the use of pest plant species listed in
e) providing for fauna habitat; and PSP2 - Landscaping;
f) avoiding the planting of pest plant g) planting riparian zones to filter stormwater run-off, AO10.2 – Insufficient cleared and unencumbered
species. stabilise soil and provide for wildlife habitat; and land is available within the site to enable any
h) providing ground and arboreal structures for fauna, replacement planting to be accommodated.
which may include ground depressions, rocks, Therefore, a weed management program is
hollows, nesting boxes and in-stream habitat. proposed to enhance the ecological value of the
vegetation to be retained. The weed program is
AO10.2 anticipated to predominantly comprise removal of
Vegetation cleared is replaced with: Lantana camara (Lantana).
a) plantings of equivalent area that replicate the
floristic structure of the vegetation removed; or
b) where this is not possible due to the characteristics
of the site and the development, plantings twice
the number of the removed trees and plants.
Editor’s Note — Revegetation and rehabilitation works are
to be carried out in accordance with an approved
Revegetation and Rehabilitation Management Plan, as
referred to in PSP3 Ecological assessment guidelines.
Koala habitat protection and enhancement
October 2021 ECOLOGICAL ASSESSMENT REPORT Page: 24
797 Ringtail Creek Road, Pomona
Document Set ID: 21731676
Version: 1, Version Date: 14/12/2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.