Council archive · source document
Noosa Council- Melda Investments - 13 Jun 2017 - 10-59 am · 132003.221156.4
Attached to the e-mail Request to change an existing approval - Melda Investments - 33-37 Douglas St, Sunshine Beach.
ae
wm
NOOSA COUNCII%
Request to Change Existing Approval and/or
Extension to Relevant Period
Sustainable Planning Act 2009
| ALL questions MUST be completed unless the form indicates otherwise. 1 eee
| This form must be submitted to Council accompanied by the applicable fee. i
| Attach extra pages if there is insufficient space on the form. |
lt Council was the Assessment Manager for the existing approval, and the approval was issued by the Court, then: -
-@) @ request to change the development approval and/or conditions is made to the Court: and
| ©) @ request to extend the relevant period for the approval is made to Council.
All terms used on the form have the meaning given in the Sustainable Planning Act 2009 or: the Sustainable Planning Heguiation |
| 2009. |
OMe sel iemel meme Ce mM:
Full name — individual or company MIELDA Tveserieens eI CTD
Contact Name — for company <TAnetT CAPFIN
Postal address DB _Locurzace Sr A .
Suburb DUTTON Pree ___|State Op (Postcode 44 0D.
Business phone O40§ 98. 422 24 AH phone OA. 5 Mobile ceo Bafetin.
Email address } *ainehn cafe optusnet.com+ au Fax
POM OST RET) RN Fe i setae?
‘Type of approval (please tick ALL applicable catagorles) Which entity issued approval?
sf Development Permit Council
O Preliminary Approval O Other entity — please specify
0 Compliance Permit
wy Material Change of Use
O Reconfiguring a Lot
O Operational Works |
O Building Works | |
O Plumbing or Drainage Works
Compliance Certificate
OG craves Relevant Activity 32 5 5% 3 33) 53 2 3 bAg. ae 4 sear wats Goal
‘Application r number/council reference 13200 3. 22N563/ 2 36 ar pA ee ees
Is the e approval for a mobile and temporary ERA?
—— ile and —— ERA is proposed to operate/operating i
Privacy | information provided for the intended purpose only and for remaining in contact with you. Council is authorised to collect
e any personal in
formation is only accessed b)
Council will us in accordance with the Local Government Act 2009 and other Local Government Acts. Your personal informal ly y
n
olic\
ive In rareed to do so. Your personal information is dealt with in accordance with council's privacy policy.
persons
T 07 5329 6500
i 0sa.gl 2a
.noosa.qid. gov. mat ABN 97 969 214 121
i 5
PO Box 141 Tewantin Qld 456! Page 1 of 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 3 pages
Page 2
QO To change the develo;
pment 'O To change the developm
ent i
approval i conditions ° | Eero relevant period
Please attach documentation outli
ain ining the detail of and the reasons and justification for the requested change or | |
|
|
| Street No 33-3 3 Street
SUNSIt INE hEATH
ot Re Yeul
Lot 322 AL $111
let 2ay RP 4¢F il
Besar Plan (Fg Sai)
0 Yes-provide details below
ired to give a copy of this request to all |
Note — Under s372 of the Sustainable Planning Act 2009 the person making the request is requil
concurrence agencies.
oketrtei lec itseat sa f
6. Pre-request response notice @
request response | been given bya relevant entity fe. g.a concurrence agency) for this request? ee
Hgs a pre-r
Ae 0 Yes
If yes, please attach a copy of the notice.
‘ONo
_[Sres- complete either Table A OF Table B below
gy
i i
| Owner's name/s C eo '
fo The owner's written consent is attached.
i
| Owner's name/s KE
‘Sole Du
rie, 5, the 5 above-mentioned owner/s BD the land,
\to the making of this request. |
consent '
Signature/s
Page 2 of 4
Page 3
| Under section 371 of the Sustainable Planni i i i | le Planning Act 2009, if the person making the requ i | approval relates, the request must be accompanied by the outers consent. 3 en te a eee Mam However, owner's consent is not required if the approval: | - relates to land the was acquisition land to which section 263 i i i upphiaien toc hie apteccias ese (2)(d) of the Sustainabie Planning Act 2009 applied when the i | | NOTES: For question 7 | | - : pce or operational work for the supply of community infrastructure on land designated for the community a ae eae Cinee under section 263(1) of the Sustainable Planning Act 2009 if a development | Also, owner's consent is not required if the Assessment Manager is satisfied that: | the number of owners of the land make it impractical to obtain owners’ consent, and the requested change does not materially affect the owners’ land; or having regard to the nature of the proposed change, the owner has unreasonably withheld consent and the requested change does not materially affect the owner's land. a oes po i he i 8. Does the request involve a State resource prescribed under the SustainablePlanning Regulation 2009, Syeda re lO Mg 'MNo _. | Nature of State owned resource: ee ae Nature of Evidence required: D1 Evidence of allocation of / entitlement to, the resource |) Evidence the chief executive has agreed to the request Attach a copy of the evidence required above _ _ . NOTES: For question 8 Section 370(3) and (4) of the Sustainable Planning Act 2009 requires that if an application for the development approval were made at, the time of making this request and evidence under section 264(1) of the Sustainable Planning Act 2009 would be required to support ; the application, this request must be accompanied by the written agreement of the chief executive from whom evidence would be. | required under section 264(1). Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a State resource, a regulation may require | the application to be supported by certain evidence prescribed under regulation. Schedule 14 of the Sustainable Planning Regulation | 2009 prescribes the State resources for which evidence is required to be given, and the evidence required, to support the application. | 9. Declaration of applicant aseeam Re ee ee : : We, the applicant, declare that the above information is correct in all respects, at the time of lodgement of this application with Council. Should any of the details given in relation to this application be changed in the future, the applicant shall advise Council in writing prior to any such change being implemented. | Signature/s eee a / Sok. Di rectoe, MeCdo Tavertmenls Py Ut [Date 6 [é [2012
Page 4
Noosa Council RE Request Extension to Relevant Period | request an extension of 4 years to the relevant period in order to best allocate capital to the building of the Middap Ditchfield house designs at an opportune time. Similar architect designed homes next to the sites in Douglas St and behind the site in Ferguson St have been slow to sell and prices have been variable. It is anticipated that each house would cost over $1M to build. Returns should improve as the value of Sunshine Beach real estate increases. It is intended that the existing concrete block house, which is in fair condition, will be demolished. The large native Melaleuca trees have been maintained as per the existing approval and new native plantings have improved the streetscape. Sole Dirfctor Melda Investments Pty Ltd
Used in these records
Noosa Council- Melda Investments - 13 Jun 2017 - 10-59 am.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file