NOOSA Checklist - Applications Involving Land
S| Development & Land Use Sections

 

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

 

4. APPLICATION FORMS” 7 OS™. mit ey
1.1. Form 1 PartA
1.1.1 Ensure that the form is fully completed. |

 

 

 

1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2 Form Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached.

1.1.2.1 Ensure that each of Forms B-O which are attached are fully completed. oe
2... REFERRAL INFORMATION, “" TT TT ee
2.1. Ensure that items 1-23 have been checked and/or completed with regard to referrals. oa se

3. ENVIRONMENTALLY RELEVANT ACTIVITIES ~~ wes
3.1. Ensure that Part G is completed if EPA referral is required.

 

 

3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

 

“ : “ e + a4 ‘ ’

4. ' FORM 2’- REQUEST. TO CHANGE APPROVAL: ° - ey es Las So: . i

4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

 

 

 

 

 

 

 

 

5. PLANS : Foyt EUS ite ake gk Cowes no GP aes
5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operationa! &
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is wv
unbound.
6. ‘SUPPORTING INFORMATION oT a a tia

 

6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction.
In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.

AWS eTocs acme: ree cease scones oe chat

71 Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.

7.2 Ensure that the fee which has been paid is recorded on the application form.

Receiving Officer ........ (> ve DN: Date ...

Having compieted this form and accepted the spptefion, please deliver both to the following IDAS Application Receiving

trays:-

¢ Ifthe application is for a Material Change of Use exclusively -AOP1’s desk in the Land Use Section.

« Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

« Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

» Inall other circumstances ~ AOP1’s desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

he

 

 

 

   

   

wha

 

 

 

 

 

 

 

 

   

 

 

 

SEP g.\ant\orms\application checklist.doc D re) Rag
Creer gery
Full text of the other 99 pages

Page 2

Our Reference: 00475 L01 NG

martoo
consultinga
pty Itd

town planners +
urban designers

31" January 2008

Chief Executive Officer
Noosa Shire Council
P.O. Box 141
Tewantin Qld 4565

ATTENTION: ENVIRONMENT AND PLANNING DEPARTMENT

Dear Sir/Madam

RE: APPLICATION FOR DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE FORA
MULTIPLE DWELLING (22 UNITS) AT SERENITY CLOSE, NOOSA HEADS, DESCRIBED

AS PART OF LOT 603 ON SP188270 (PROPOSED LOT9) PARISH OF WEYBA, CBD
SETTLERS COVE PTY LTD

Please find enclosed a development application for the above proposal which has been prepared in
accordance with the /ntegrated Planning Act 1997 and lodged with your Council as the Assessment
Manager of this application.

The attached development application includes:

* — six (6) copies of the Proposal Report and associated proposal plans;

* acompleted IDAS application Form 1 Parts A, D, Attachment 1 and Checklist; and

*® a cheque for $14775.00 which is understood to be Council’s application fee as the
Assessment Manager.

Please contact our Noosa office if you require any further information and/or clarification.

Yours faithfully

£L cto.

Nadine Gorton

Senior Planner

martoo consulting pty Itd

Enc :(12)
SUNSHINE COAST OFFICE GYMPIE OFFICE
1/199 GYMPIE TERRACE NOOSAVILLE - PO BOX 1684 NOOSAHEADS Q 4567 1/28 REEF STREET GYMPIE - PO BOX 391 GYMPIE Q 4570
TELEPHONE 07 54555425 - FACSIMILE 07 54555725 TELEPHONE 07 54827440 - FACSIMILE 07 54824952

[email protected] [email protected]

Page 3

INTEGRATED PLANNING ACT 1997

   

Form 1 Development Application

Part A

Common details

‘Identification of the premises the subject of the application

1. Can any part of the premises be identified by a street address or lot on plan description?

(2) No - Answer Q1(a)

Yes - Complete Table B and answer Q1(b) and Q1(c)

Part A, Version 3.0, 3 September 2007

 

 

 

Table B
| Lot on plan description — |
nun ber ae Street name fowaty nome Post pee ae . pee Local government area
number {e.g. RP, SP) number
Serenity Close Noosa Heads 603 sP 188270 Noosa

 

 

 

 

 

 

 

 

 

 

 

1(b). Can the address be further described by shop/tenancy number or storey/level?

No

(1 Yes - Complete Table C

1(c). _ Is any part of the premises strategic port land under the Transport Infrastructure Act 1994?

No

(Yes - Complete Table D

2. Can the premises best be identified by coordinates (e.g. for development proposed in waters, or on @ site within a large rural lot)?

[X] No

(J Yes - Complete Table E

3. Are the premises within or adjacent to a water body or watercourse?

LJ No

Yes - Complete Table F and answer Q3(a)

Table F

 

Name of water body or watercourse

 

 

 

1 Noosa Inlet

 

 

3(a). _ Is any part of the development proposed in tidal waters (i.e. below high water mark)?
No
CI Yes

Page 4

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

4.

What is the total area of land that makes up the premises (Le. the area covered by the application)?

 

Area of land above high water mark/outside watercourse Area in a water body or watercourse

 

5,330.00 (Klm? [hectares (Tick applicable unit) (Om? [hectares (Tick applicable unit)

 

 

 

 

 

 

 

Existing use ofthe premises ce

5, Are the premises currently used for any purpose?

LJ No

Yes - Ensure details of any existing use of the premises are provided in plans and documentation submitted with this application, e.g. location
and nature of existing uses, buildings, structures and services

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

6. Are there any existing easements on the premises (e.g. for vehicular accass, electricity, overland flow)?
(1 No
Yes - Complete Table H and ensure the location and dimensions of each easement are included in plans, submitted with the application
Table H
i ~ Purpose of each easement Entity favoured by the easement
1 Sewerage and access Noosa Council
Proposal details _ 4
7. Are new uses proposed on the premises?
(J No
Yes - Provide details in Table |
Table |
Each proposed new use
1 Multiple Dwelling
8. Are new buildings or structures proposed to be erected on the premises?
(1 No
Yes - Ensure the nature, location and dimensions of the proposed new buildings, structures or services are included in plans, submitted with the
application
‘Applicant details , ]
9. Whois the applicant for the application?

 

 

Company/organisation name

(if applicable) CBD Settlers Cove Pty Ltd

 

 

\Individual/ contact person details |

Title Ms Firstname Nadine j| Lest name Gorton i

Postal address Ici Martoo Consulting Po Box 1684 Noosa Heads Q 4567

 

 

 

 

 

 

 

Contact telephone number {5455 $425

 

 

Mobile phone number

 

 

Facsimile number |5455 9725

 

 

 

 

e-mail address [email protected]

 

Page 5

INTEGRATED PLANNING ACT 1997

‘Owner's consent and resource entitlement _

Part A, Version 3.0, 3 September 2007

J

10. Does the application involve a State-owned resource prescribed by schedule 10 of the integrated Planning Regulation 1998 (IP Reg) or
any other regulation?

{] No

O Yes - Complete a new Table J for each State-owned resource and submit, with the application evidence of resource allocation or entitlement

11. Does the application involve land other than State-owned land (ie. privately owned land) and require owner's consent?

[Xx] No

(2 Yes - Complete Table K and submit, with the application, written documentation of all owner's consent

 

(Mandatory attachments and supporting information

12. What are the other parts of IDAS Application Form 1 submitted with this application, and the other mandatory attachments and
supporting information accompanying this application, not identified in those other form parts?

_j

 

Description of attachment or information
(e.g. Part C of Form 1, owner's consent, evidence of

Title (if applicable)

(e.g. General Authority, James Street Trafic Date

Method of delivery to

 

 

 

 

 

 

 

 

 

 

 

resource allocation/entitfement, plans, drawings, reports) Report) assessment manager q
{ Part D MCU 31-Jan-2008 over the counter
2 Referral checklist 31-Jan-2008 | over the counter
3 Proposal report Proposal Report 00475 Lot 9 V1 January 08 | over the counter
4 Attachment 1 Superseded 31-Jan-2008 | over the counter
§ DBi Development Application Booklet DBI over the counter
6 Plans A1 OBI over the counter

 

 

 

‘Portable Long Service Leave (PLSL) levy for building and construction work _

13. Is payment of a Portable Long Service Leave (PLSL) levy required for building and construction work before a development permit for
the application can be given?

No
CI Yes

43(a).

Indicate the reason PLSL is not applicable

[] The application is not for building and construction work under the Building and Construction Industry (Portable Long
Service Leave) Act 1991, section 3AA (e.g. the application is only for e change of use or for the following types of work carried
out solely for farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching
vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests); or

(1  Allcosts, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or

O

The work is being carried out under an owner-builder permit issued under the Queens/and Building Services Authority
Act 1991- Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number
stated). The receipted form must be sighted by the assessment manager before a development permit can be given

a

 

OFFICE USE ONLY

 

 

Date Received 4 h \e q Reference Numbers

 

 

 

28] ats

 

|

FOR COMPLETION BY ASSESSMENT MANAGER

Is a QLeave Notification and Payment Form required for this application?

(J No

(1 Yes - Complete Table M

Page 6

 

 

 

 

 

 

 

 

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007
ee nae ee oe ey
[ NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER
To Council
| have been engaged as the private certifier for the building work referred to in this application
Date of Accreditation number Name BSA Certification number Building classification

engagement

 

 

 

 

 

 

 

 

Page 7

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

Advice for completing Part A

 

General advice

Under IPA, section 3.2.1(7) mandatory requirements must be correctly completed for a development application to be a ‘properly made application’.
The assessment manger may refuse to receive an application that is not properly made.

Completion of Part A of Form 1 is required for all development applications. Other mandatory requirements, applicable to certain types of applications,
are stated in other Parts of Form 1.

The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building
Act 1975 only.

For further information about completing this form go to [DAS Guide 1 (Making and IDAS application)

 

Qi

The premises, the subject of the application, may be identified in a number of ways. Street address and lot on plan are most common.
Lot on plan details can be obtained from title documents or through the local government.

. The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or
other structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.

. A description of the land is not required if the application relates to a mobile and temporary Environmentally Relevant Activity (ERA)
only. Instead complete Q1(a).

. StrategicPortLand is within a local government area but a local government's planning scheme does not apply on Strategic Port Land.
StrategicPortLandis declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development
on strategic port and) and the Queensland Transport (Ports) website.

 

Coordinates often provide the best means of accurately identifying the location of development proposed in waters, or on a relatively
small development site distant from property boundaries. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application.

. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum may be provided.

 

Q3

‘ A single development application may involve land both within and outside waters.

* A ‘watercourse’ is defined by the Water Act 2000, schedule 4 and generally means a river, creek or stream upstream of the point to
which high spring tide ordinarily flows and reflows (unless a regulation has declared a limit for the watercourse). Generally, a
watercourse is in the jurisdiction of the Department of Natural Resources and Water.

. “Tidal water’ is defined in the Coastal Protection Act 1995 (Schedule) and ‘tidal area’ for a !ocal government and for strategic port land
is defined in the IPA (schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Protection Act in relation to
high water mark at spring tides) establishes the boundary of a tidal area.

. Land below high water mark is not within a local government's area unless provided for under the Local Goverment Act 1993.

Unless otherwise provided for by legislation, a local government has no jurisdiction below high water mark. A tidal area for strategic
port land is within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for
a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and deciding applications for
prescribed tidal works within the tidal area for a local government, and the planning scheme may be applied to that assessment (to the
extent provided for in the code for prescribed tidal work).

 

The applicant need not be the owner of the land. However, the applicant is responsible for ensuring the information provided on the
Form 1 Application Form (including this Part and any other relevant Part) is correct.

. If the applicant is a company or organisation, a contact person must be nominated.

. Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment
Manager, during the processes of the application or in the event of an appeal about the outcome of the application.

 

Q10

 

Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications involving a prescribed State resource.
Schedule 10 of the Integrated Planning Regulation 1998 (IPR) prescribes the State resources, including State-owned land, where
evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning Regulation

. Section 3.2.1(10)(a)(ii) states an application cannot be taken to be properly made without the required evidence..

. Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental
Protection Agency for quarry material below high water mark, and the Department of Natural Resources and Water in relation to the
State-owned land above high water mark.

. In the case of applications involving the taking or Interfering with water under the Water Act, the development application may be
made at the same time as the request for resource entitlement.
. In the case of State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or

encroachment (identified by gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to
the Department of Main Roads.

 

 

Page 8

INTEGRATED PLANNING ACT 1997 Part A, Version 3.0, 3 September 2007

 

Qi . Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if
the application involves any of the following:
(i a material change of use;
{ii) reconfiguration of a lot;
(iii) work on land below high-water mark and not within a canal as defined under the Coastal Protection and Management
Act 1995; or
(iv) work on rail corridor land defined under the Transport Infrastructure Act 1994.
° “Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the
application, entitled to receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
° Owner's consent is not required for a mobile and temporary ERA.

 

Q12 Only information not identified in other Parts of Form 1 needs to be listed in this section of Part A.

 

Q13 . The Building and Construction Industry Portable Long Service Leave Scheme provides long service leave entitlements to workers in
the building and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service
leave. To fund the scheme, a levy is collected on all building and construction work carried out in Queens!and where the total cost of
the work, whether direct or indirect, is $80,000 or more inclusive of GST. This amount and other prescribed percentages and rates for
calculating the levy are stated in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002. Included in
the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and Construction IndustryTrainingLevy.
The Building and Construction Industry (Portable Long Service Leave) Act 1991 {PLSL Act) defines the building and construction
industry for the purposes of the levy and includes, for example, renovating, relocating, constructing, altering, demolishing, maintaining
of repairing buildings, pools, roads, jetties, pipelines, fences or earthworks, and works for subdividing, irrigating or draining land.

The PLSL Act requires the portable long service leave levy (PLSL levy) be paid before the assessment manager may give a
development permit for certain building or operational work. The assessment manager must sight an approved form issued by
QLeave advising of the status of the payment of the levy.

Building and Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on
request from QLeave, or can be completed on the QLeave website at www.dleave.qid.gov.au

For further information contact QLeave (Tel: 1800 803 481 Web: www.gleave.qid.gov.au )

 

 

Privacy Statement
The information collected on Form 1 will be used by the Department of Local Government, Planning, Sport and Recreation in
accordance with the processing and assessment of your Application. Your personal details will not be disclosed for a purpose outside
of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as required
by Parliament. This information may be stored in a Department of Local Goverment, Planning, Sport and Recreation database. The
information collected will be retained as required by the Public Records Act 2002. For further information on your privacy, contact the
Privacy Contact Officer for the Department of Local Government, Planning, Sport and Recreation at (07) 3237 1860.

 

 

 

 

 

 

 

Proposal ID

 

 

 

 

Page 9

Chief Executive Officer
Noosa Council

P.O Box 141
TEWANTIN QLD 4565

Attention: Planning and Development Section
Dear Sir,

RE: APPLICANTS AND LANDOWNERS CONSENT FOR A DEVELOPMENT
APPLICATION SEEKING A DEVELOPMENT PERMIT FOR MULTIPLE
DWELLINGS AT CNR OF BANKSIA AVENUE AND SERENITY CLOSE NOOSA
HEADS DESCRIBED AS (PROPOSED LOT 9) EXISTING LOT 603 ON SP

[email protected] the applicant and on behalf of the landowner of Lot 603 on SP 188270, | the undersigned consent
to the making of the above development application which seeks a development permit for a Material
Change of Use for Multiple Dwellings at the corner of Banksia Avenue and Serenity Close, Noosa
Heads.

| also confirm that Martoo Consulting Pty. Ltd. is our contact for this development application. Please
address any correspondence relating to this application to Martoo Consulting Pty. Ltd., unless we
advise Noosa Council otherwise.

Yours faithfully,

CBD SETTLER’S COVE PTY LTD
ACN 114 192 773

e tyr p—~4 & fot fo 8.
ARY GODFREY Date

Director

In accordance with General Power of Attorney (attached)

Page 10

Form 1

Queensland

Powers of Attorney Act 1998
(Section 11)

GENERAL POWER OF ATTORNEY

ver: 3-1/06/02

 

Appointing a person or persons as your attorney (general
powers).

Use this form if you want someone to act as your attorney for
financial matters while you have capacity.

Use an enduring power of attorney form if:

(a) you want someone to act as your attorney now and to
continue to act as your attorney if at sorne future time you
should lose capacity.

(b) you want someone to act as your attorney only if at some
future time you should lose capacity.

S:ADocuments\$ 16571CLH_5t657_037.D0C 4

Page 11

Appointing a person or persons as your attorney

 

As principal (the person making the appointment), you
complete this form by writing your responses on the fines and
ticking the appropriate boxes. Then sign the form and have
your signature witnessed. Any adult may witness your
signature. However, if this power of attorney is required to be
registered under the Land Titles Act, the witness must be a
justice of the peace, a commissioner for declarations, a lawyer
or a notary public.

Appointment of attorney or attorneys

1. CBD SETTLERS COVE PTY LTD ACN 114 192 773 of Level 5, 181 St Georges Terrace,
Perth WA 6000 appoint the following person as my attorney: GARY MICHAEL GODFREY of
6 Daybreak Court, Castaways Beach Qid 4567.

e@ 2. Are you appointing more than one attorney?
Kl No Go to clause 4.
Ol Yes.

3. | How do you prefer that they make their decisions? (Tick ona box only)
(J Severally (any one of them may decide)
() Jointly (unanimously)
C) Asa majority (specify e.g. simple majority, two-thirds majority, etc.)

{J Other*

Note: The Powers of Attorney Act 1998 allows you to appoint successive attorney/s for a matter so that the
power is given to a particular attorney only when power to a previous attorney ends. You can nominate the
circumstances that a power will end (eg. if x leaves the jurisdiction, y may act).

4. The attorney/s power is subject to the following terms:
To execute any statutory and local authority application for approval and any associated
documentation including but not limited to those for land use, land development and building,
and including but not limited to applications for Reconfiguration of Lot, Material Change of
Use and Operational Works relating to the development known as Settlers Cove Noosa
@ Heads owned by CBD Settlers Cove Pty Ltd ACN 114 192 773 being part of what was
originally lot 4 on SP100064, County of March, Parish of Weyba.

5. The power given to my attorney/s begins:
[J immediately.
[C1 on this date:
tite here the date when you want the appointed person/s to begin acting as your attorney.)
My on this occasion:

[Write here the occasion on which you want the appointed person/s to begin acting as your attorney.]
Note: If you do not complete clause 5, the power begins immediately.

 

6. This power of attorney gives my attorney/s power to do, on my behalf, anything that !
could lawfully de by an attorney (other than a personal/health matter), subject to the

 

[Director] {Director/Secretary)

. ’ 2
cevcsseasesssseseseceseceeelye BO Fearon, 2°°2pp SETTLERS COVE PTY LTD ACN 114 192 773
[Date) .

SADocuments\5 1657\CLH_51657_037.00C 2

Page 12

INTEGRATED PLANNING ACT 1997 Attachment 1, Version 3.0, 3 September 2007

9 Development Apoplicatio da

Attachment 7

Development application (superseded planning scheme)

Nature of the application

 

4. Whatis the nature of this application? (Tick applicable box/es)

(i) Request for proposed development to be assessed under the provisions of a superseded planning scheme - Also
complete Part A and any other applicable Parts of Form 1
OO i Advise the intention to carry out development that would not have required a development permit under a superseded

planning scheme - Also complete Part A only. No other Part of Form 1 is required

@ 2. Whatare the details of the superseded planning scheme? - Complete Table A

 

 

 

 

 

 

 

 

 

 

 

Table A
Tee caopeane peng ane | pas onte Dig | POV Teese see]
1 Shire of Noosa Strategic Plan and Schedule 03-Feb-2006 0
OFFICE USE ONLY
Date Received Reference Numbers

 

 

 

Page 13

é
‘ * ivrecraTeD PLANNING ACT 1997 Part D, Version 3.0, 3 September 2007

O Development Appiicatio Ore

Part D

Material change of use assessable against a planning scheme

 

 

 

 

 

 

 

 

 

 

 

 

 

Planning scheme identification _* ™]
1. How is the premises identified / zoned in the applicable planning scheme?
Each fat making up the premises “List of applicable zonelprecincts/areas : List of applicable overlays
1 part of Lot 603 Residential High Density Nil
‘Nature of the material change of use (MCU) - . . ™ oo |
e 2. Is the application seeking approval for more than one MCU on the premises?

No - Complete Table A
(Yes - Complete a new Table A for each proposed MCU

 

Table A

(i) How is the proposed use defined in the applicable planning scheme? Also provide applicable details of the proposed use.

 

 

Number of dwelling /| Days and hours | Number of
Planning scheme definition Explanation of the proposed use tenancy units of operation | employees
(f eppticable) (it applicable) (if epplicable)
Multiple Dwelling residential units 22 refer report 0

 

 

 

 

 

 

 

(ii) What is the nature of the material change of use?
Start of a new use of the premises
(] Amaterial change in the intensity or scale of the use of the premises - Complete Table A(a)
(_]_ The re-establishment on the premises of a use that has been abandoned

 

 

 

 

 

(ili) What type of approval is being sought?
Development Permit
(Preliminary Approval

(iv) Is there a current Preliminary Approval for this use on the premises?

No
LD Yes - Complete Table A(b)

(v) Does the proposed use involve the reuse of existing buildings on the premises?
No

oO Yes - Complete Table A(c) and submit, with the application, plans showing the size and location of the buildings to be reused

(vi) Does the proposed use involve new building work on the premises?
LC) No

Yes - Complete Table A(d) and submit, with the application, plans showing the size and location of the proposed new building work

 

 

 

Page 14

é
» INTEGRATED PLANNING ACT 1997

Part D, Version 3.0, 3 September 2007

 

 

 

 

 

Table A(d)
Proposed floor area |refer teport
Proposed site cover |refer teport
Proposed maximum number of storeys [4
Proposed maximum height above natural ground level {refer feport

(vii) Does the proposed use involve the reuse of other existing works on the premises?

>} No

(viii) Does the proposed use involve new operational work on the premises?

(1) Yes - Complete Table A(a) and submit, with the application, plans showing the nature and location of the works to be reused

 

 

 

[1 No
Yes - Complete Table A(f) and submit, with the application, plans showing the nature and location of the proposed new operational
works
Table A(f)
Proposed number of on-site car parking bays [a3
Proposed area of landscaping refer plans
Proposed type of vehicle cross-over (for other than residential uses) lrefer plans

 

Proposed maximum vehicular servicing arrangement (for other than residential uses) [others

 

 

 

 

—
Mandatory Information

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

3. Confirm that the following mandatory information accompanies this application.
“een of Method of lodgement
For all applications a
(i) Plans showing the nature and location of the proposed use on the premises and a statement about the
intensity and scale of the proposed use (e.g, number of visitors, number of seats, capacity of storage erea) Confirmed | over the counter
When the application involves reuse of existing buildings . - 7
(li) Plans showing the size and location of the buildings to be reused ([} Confirmed
Not applicable
When the application Involves new building work :
{iil) Plans showing the size and location of the proposed new building work Confirmed
To] Notappiioai over the counter
jot applicable
When the application Involves reuse of other existing works 7
{iv) Plans showing the nature and location of the works to be reused (1) Confirmed
Not applicable
When the application involves new operational work ~
{v) Plans showing the nature and location of the proposed new operational works (1 Confirmed th
over the counter
Not applicable

 

 

 

 

 

OFFICE USE ONLY

 

 

Date received Reference numbers

 

 

 

 

 

Page 15

é
«1 INTEGRATED PLANNING ACT 1997 Part D, Version 3.0, 3 September 2007

Advice for completing Part D

 

General advice
« Part A must also be completed for all IDAS development applications.
¢ All questions must be answered unless following a response there is a statement to go directly to a particular question.

 

Table A A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise
development to occur.

 

 

 

 

 

 

 

 

 

Proposal ID

 

 

Page 16

   
 
   

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

Form 1 Development Application

IDAS

Assessment Checklist

 

IDAS Development Application Form 4 js the approved form for all development applications under the Integrated Planning Act
1997. Form 1 is made up of various Parts. Part A (Common details) of Form 1 must be completed for all applications. The
relevance of other Parts of Form 1 depends on the nature of the application.

Form 1 also includes the IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 4 relevant to the application.

Section 1 and all other relevant sections of the IDAS Assessment Checklist must be completed for all development applications
except those for building work requiring assessment against the Building Act 1975 only. For more advice refer to Part B of the
IDAS Application Form.

Answering the following questions will assist you in determining which sections of the checklist must be completed for your application.
If unsure, phone or visit your local government or log on to the IPA website for help.

Does the application seek approval to materially change use of the premises? Bal Yes |CINo
ifyes - complete Section 2 of this checklist

 

 

 

 

Does the application seek approval to reconfigure a lot?
If yes - complete Section 3 of this checklist and Part F of IDAS Application Form 1 OYes |[x]No
Assessment is by the local government

Does the application seek approval to carry out operational work?
ifyes - complete Section 4 of this checklist O Yes |[X}No

 

 

Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994?
if yes - complete Section 5 of this checklist

Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme?

if yes - complete Part E of IDAS Application Form 1 L1Yes }JNo
Assessment Is by the local government

Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yas - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of [DAS Application Form 1 (Yes |—)No
Assessment is by a building certifier

(1 Yes |[kINo

 

 

 

 

 

 

 

 

 

ISECTIO N 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.

 

 

 

[HERITAGE |
1 Is any part of the proposal intended to be carried out on a registered place under the Queensland Hentage Act 1992?

No

CI Yes

IPA, schedule 8, part 1, table 5, item 2
IP Regulation, schedule 2, table 2, item 18
IPA, section 1.3.5 (Definitions for tarms used in development)

 

 

[REMOVING QUARRY MATERIAL; WILD RIVER AREA |
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No

1 Yes

Page 17

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

IPA, schedule 8, part 1, table 5. item 1

JP Regulation, schedule 2. table 2, item 17

IP Regulation, schedule 1. table 5, item 2 (wild river area)
Water Act 2000, section 966C

Wild Rivers Act 2005, section 43A

ENVIRONMENTALLY RELEVANT ACT! ACTI

1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity ¢ ora petroleum activity?

{X] No
LJ Yes

IPA, schedule 8, part 1, table 2, item 1

JPA, schedule 8, part 1. table 5, items 3 and 4

JP Regulation, schedule 2, table 2, items 1 and 23

Environmental Protection Act 1994, section 73AA (wild river area)
Wild Rivers Act 2005, section 43A

3 WILD RIVER AREA

    

 

 

‘WITHIN THE LIMITS OF A PORT _

1.4 Is any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
[—X] No
C1 Yes

IP Regulation, schedule 2, table 2. items 15 and 16

 

[DECLARED FISH HABITAT AREA

J

 

1.5 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?

[Xx] No

O Yes - if answers fo questions in other sections of this checklist indicate that the proposed development is assessable under IPA,

schedule 8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not

the Assessment Manager for the application, the agency has jurisdiction as Advice Agency,
IP Regutation, schedule 2, table 2. item 26

iCOMMUNITY INFRASTRUCTURE

1.6 Is any part of the premises designated for community infrastructure?

No
(1 Yes

IP Regulation, schedule 2, table 3, item 7

 

 

 

 

 

WASTE WATER MANAGEMENT

 

V7 Does the proposal involve the establishment or expansion of a waste water disposal system?

No
(Yes

IP Regulation, schedule 2, table 3, item 5

 

 

SECTION 2 - Section 2 must be completed when the application seeks approval to materially change the use of premises.

 

 

 

(PLANNING SCHEME

24 \s the proposed use assessable under the planning scheme?

(1) No- (Goto Question 2.2}
Yes - (Complete Part D of IDAS Application Form 1 end answer Questions 2.1.1 - 2.1.14 below)

If yes, does the application request that the proposal be assessed against a superseded planning scheme?
Yes- (Complete Attachment 1)

No

Page 18

INTEGRATED PLANNING ACT 1997 IDAS Assessment Chectlist, Version 21.0, 3 September 2007

STATE-CONTROLLEDROAD / ~ ]

2.1.1 {s any part of the premises within 100m of a State-controlled road, or part of a future State-controlled road?

CI Yes
No
If no, is the proposed use listed in schedule 5 of the integrated Planning Regulation 1998 and does it exceed the specified
threshold?
(1 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
No

IP Regulation, schedule 2, table 3, items 1(a) and 3
"ACID SULFATE SOILS
2.1.2 Is the use proposed in a local government area listed? in State Planning Policy 2/02: Planning and Managing Development

Involving Acid Sulfate Soils?

(J No

Yes

2 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Cabooiture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirlum Vale, Mormington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday

 

 

If yes, is the natural ground level of any part of the premises less than 20m AHD?

L) No
Yes

If yes, will the proposed use involve the following?

« Excavating more than 1,000m! of soil or sediment at or below 5m AHD C1 No [Yes

« Filling the premises with 1,000m or more of material with an average depth of © No Yes
0.5m on land, soil or sediment at or below 5m AHD

if yes to either or both - this application must be referred to the Department of Natural Resources and Water (NRW) as
Advice Agency.

IP Regulation, schedule 2, table 3, item 4
State Planning Policy 2/02: Planning and Managing Development Invotving Acid Suifate Soils, section 3.6

 

[COASTAL MANAGEMENT DISTRICT J
2.1.3 Does the proposed use involve the following?

¢ Carrying out operational work, completely or partly in a coastal management district —) No OO Yes

* Carrying out building work, completely or partly in a coastal management district, thatisthe [%] No (Yes
construction of new premises with a gross floor area (GFA) of at teast 1,000m?

© Carrying out building work, completely or partly in a coastal management district, that is the &] No 0 Yes
enlargement of the GFA of existing premises by more than 1,000m?

if yes to any one - this application must be referred to EPA as Concurrence Agency.
IP Regulation, schedule 2, table 3. item 6

(VEGETATION CLEARING J

2.1.4 Do the premises include a lot containing the following?

 

© Acategory 1, 2 or 3 area shown on a Property Map of Assessable Vegetation (PMAV) —] No OD Yes
*  Ifthere is no PMAV for a lot, remnant vegetation [—] No 0 Yes

IP Regulation, schedule 2. table 3, item 11

[CONTAMINATED LAND - UNEXPLODED ORDNANCE ~]

2.1.5 Is any part of the premises in an area for which an area management advice has been given for unexploded ordnance?

LL) Yes - (Complete Part N) This application must be referred fo the Administering Authority as Concurrence Agency.
No

IP Regulation, schedule 2, table 3, item 12

 

Page 19

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007
aa - ee voy
PUBLIC PASSENGER TRANSPORT we ~ md

2.1.6 Is the proposed use listed in schedule 13¢ of the Integrated Planning Regulation 1998 and does it exceed the specified threshold?

(11 Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
No

IP Regutation, schedule 2, table 3. item 14
‘RAILWAY SAFETY AND EFFICIENCY

AY SAFETY ANDEFFICIENCY a a , |

2.1.7 \s the proposed use listed in schedule 13D of the integrated Planning Regulation 1998 and does it exceed the specified threshold?

(1 Yes - This application must be referred to Queensiand Transport (QT) as Concurrence Agency.
No

IP Regulation, schedule 2, table 3. item 15

 

 

 

‘KOALA CONSERVATION J
2.1.8 Is any part of the premises in a koala conservation area or koala sustainability area?
C1 No
Yes
If yes, is the use for a domestic activity, as defined by the IPA?
LC Yes
No
If no, will the use result in the following?
© Clearing of native vegetation over an area greater than 2,500m? [x] No 0 Yes
« Anew building and any reasonably associated structure with a total footprint greater than [] No &] Yes
1,000m
* An extension to an existing building and any reasonably associated structure if the [x] No Yes
extension has a total footprint greater than 1,000m?
e Extracting gravel, rock or sand from an area greater than 5,000m? [x] No 0 Yes
© Excavating or filling an area greater than 5,000m? [x] No (Yes

e Additional traffic in a koala conservation area or koala sustainability area between 6:00pm [] No x] Yes
on a day and 6:00am on the following day

if yes to any one - this application must be referred to the Environmental Protection Agency {EPA} as Concurrence Agency.
IP Regulation, schedule 2, table 3, item 18

 

[EASEMENTS AND SUBSTATIONS

2.1.9 Is the use associated with reconfiguring a lot?

(J Yes

No - Answer both (a) and (b) below

{a) Will any part of any structure or work that is the natural and ordinary consequence of the use, be located in an
easement?
(1 No

Yes - Answer both (i) and (ii) below

(i) _ Is there an easement in favour of a distribution entity or transmission entity under the Electricity Act 1994
for a transmission grid or supply network under that Act?

No
L_] Yes - This application must be referred fo the entity as Advice Agency.

(ii) Is there an easement in favour of the holder of pipeline licence number 1 issued under the Petroleum Act
1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?

No
| Yes - This application must be referred to the licence holder as Advice Agency.

(b) Is any part of the premises situated within 100m of a substation site under the Electricity Act 1994?
( No

Yes - This application must be referred fo the entity responsible for the substation as Advice Agency.

Page 20

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

IP Regutation, schedule 2. table 3. item 8 (electricity easement)
IP Regulation, schedule 2. table 3, item 16 (pipeline easement)
IP Regulation, schedule 2, table 3, item 9 (substation)

RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT INAWILDRIVERAREA ~~

 

 

2.1.10 Is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?

[—X} No
OO Yes

IP Regulation, schedule 1. part 2, table 5. item 1(a)
Wild Rivers code (Note: the code does not currently contain appicable provisions for residential industrial or commercial development inside a designated urban

 

 

area)
WETLAND ;
2.1.11 Is the proposal only for the construction or use of a single residence on a lot and any reasonably associated building or structure?
LI Yes
No
|f no, do the premises include a lot situated in, or within 100m of,a wetland shown on the ‘Map of referable wetlands’?
No

Oo Yes - This application must be referred to the Environmental Protection Agency (EPA) as Advice Agency.

IP Regulation, schedule 2, table 3, item 20

 

 

HERITAGE }
2.1.12 Do the premises include a lot sharing a common boundary with a protected area or registered place under the Queensland
Heritage Act 1992?
No

O Yes - This application must be referred fo the Queensland Heritage Council (QHC) as Advice Agency.
IP Regutation, schedule 2, table 3, item 22

 

 

‘CERTAIN PRELIMINARY APPROVALS _ |
2.1.13 Is preliminary approval sought for the application under the IPA, section 3.1.67

No

C1 Yes- (Complete Attachment 2) This application must be referred to the Department of Local Government, Planning, Sport and Recreation

(DLGPSR) as Advice Agency.
IP Regulation, schedule 2, table 3, item 23

 

 

 

[BROTHEL ae ee - J
2.2 ls the proposed use a brothel as defined under the Prostitution Act 1999?

No

(1) Yes

IPA, schedule 8, part 1, table 2, item 2
Prostitution Act 1999, section 64

 

 

[STRATEGIC PORT LAND |
2.3 ls any part of the use proposed on Strategic Port Land under the Transport infrastructure Act 1994?

No

CO Yes

IPA, schedule 8, part 1, table 2, item 3
IP Regulation, schedule 2, table 2, item 6

Page 21

INTEGRATED PLANNING ACT 1997 IDAS Assessment Cheetst, Version 21.0, 3 September 2007

MAJOR HAZARD FACILITY __ _ ee ee _ ~~]
2.4 Is the proposed use a major hazard facility 0 or possible major hazard facility under the Dangerous Goods Safety Management Act
2001?
No

[1 Yes - (Complete Part L) This application requires assessment by the Department of Emergency Services (DES). if DES is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

 

IPA, schedule 8, part 1, table 2, item 4
IP Regulation, schedule 2. table 2. item 7

 

 

 

CONTAMINATED LAND- REGISTERED LAND —
25 Is any part of the land forming the premises on the | Environmental Management Register or Contaminated Land Register under the
Environmental Protection Act 1994?
No
C1 Yes

IPA, schedule 8, part 1, table 2, item 5
IP Regulation, schedule 2, table 2, item 22

(CONTAMINATED LAND - NOTIFIABLE ACTIVITY ~ — _
2.6 |s any part of the land forming the premises currently used for a notifiable activity, or if there is no existing use was it last used for
a notifiable activity?

No
(1 Yes

IPA, schedule 8, part 1, table 2, item 6
IP Regulation, schedule 2, table 2, item 22

 

 

 

 

;CONTAMINATED LAND - INDUSTRIAL ACTIVITY oe ~ j
27 Is any part of the premises currently used for an industrial activity (other than for a mining activity or petroleum activity), or if there
is no existing use was it last used for an industrial activity (other than for a mining activity or petroleum activity)?
[x] No
(1 Yes

IPA, schedule 8, part 1, table 2, item 6
IP Regulation, schedule 2, table 2, itam 22

 

 

‘CONTAMINATED LAND - AREA MANAGEMENT ADVICE (NATURAL MINERALISATION OR INDUSTRIAL ACTIVITY) J
28 Is any part of the premises in an area for which an area management advice has been given for natural mineralisation or industrial
activity (other than for a mining activity or petroleum activity)?
No
LD Yes

IPA, schedule 8, part f, table 2, item 7
IP Reguiation, schedule 2, table 2. item 22

 

(AQUACULTURE; WILD RIVER AREA
2.9 Is the proposed use for aquaculture as defined under the Fisheries Act 1994?

No
Lj Yes

IPA, schedule 8, part 1, table 2, item 8

IPA, schedule 8, part 2, table 2, item 1 (self-assessable aquecultura)
JP Regulation, schedule 2, table 2, item 27

Fisheries Act 1994, section 76DA (wild river area)

Wild Rivers Act 2005, section 43A

 

 

 

 

[AGRICULTURAL AND ANIMAL HUSBANDRY ACTIVITIES IN A WILD RIVER AREA |
2.10 Is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?

No

(1 Yes

IPA, schadule 8, part 1, table 2, item 11
IP Reguiation, schedule 2, table 2, item 36
Wild Rivers Act 2005, sections 42, 434

Page 22

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

 

SEQREGIONALPLAN, ee]
2.11 ls any part of the premises within the South East Queensland (SEQ) Regional Plan area?
LI No
Yes
If yes, are the premises within one or more of the following areas?
e A Major Development Area in the Urban Footprint [K]No [) Yes - (Answer (a) fo (c) below)
¢ The Regional Landscape and Rural Production Area —JNo () Yes - (Answer (d) below)
* The Rural Living Area EXINo () Yes - (Answer (e} below)
e The Investigation Area EJNo [() Yes - (Answer (f) and (g} below)

SEQ Regional Plan 2005-2026, Amendment 1, Regulatory Provisions, division 2
IP Regulation, schedule 2, table 3, tem 13
IPA, section 2.54.12 (3)

‘CONSERVATION ESTATE

wan i

 

2.12 ls the proposal for urban purposes, as defined under the IPA?

CI No
Yes

If yes, is the use proposed on a lot situated in, or within 100m of, any of the following?
e  Aprotected area, forest reserve, critical habitat or area of major interest under the Nature

Conservation Act 1992 No [Yes
e A State forest or timber reserve under the Forestry Act 1959 No [_] Yes
© Amarine park under the Marine Parks Act 2004 No [_] Yes
© Arecreation area under the Recreation Area Management Act 1988 No [_] Yes
* Aworld heritage area listed under the World Heritage Convention No [] Yes
* Brisbane forest park under the Brisbane Forest Park Act 1977 No []Yes

if yes to any one - This application must be referred to the chief executive under the relevant Act mentioned as Advice Agency.

IP Regulation, schedule 2, table 2. item 40

 

REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT - this question only applies for applications not also seeking approval to
carry out operational work.

 

 

 

2.13 Does the proposed use involve the removal, destruction or damage of marine plants under the Fisheries Act 1994?

No
LJ Yes

IPA, section 3.2.24

IPA, schedule 8, part 1, table 4, item 8 {assessable development)
IPA, schedule 8, part 2, tabie 4, item 4 (self-assessable development}
IP Regulation, schedule 2, table 2. item 29

IP Regulation, schedule 1, part 3, table 4, item 8

Fisherias Act 1994, section 76DA {wild dver area)

Wild Rivers Act 2005, section 43A

 

Disclaimer:

While the Department of Local Government, Planning, Sport and Recreation (OLGPSR) believes that this information contained on this
form and provided as part of this process will be of assistance to you, itis provided on the basis that you will not rely on the information
without first making your own enquiries regarding the interpretation and application of the applicable legislation to your circumstances.

To the full extent permitted by law OLGPSR expressly disclaims all liability {including but not limited to liability for negligence) for errors
or omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form

 

 

 

Page 23

INTEGRATED PLANNING ACT 1997

 

 

Proposal ID

 

 

 

 

 

 

{DAS Assessment Checklist, Version 21.0, 3 September 2007

 

Page 24

Proposal Report: Proposed Material Change of Use of Premises Mubtiple Dwelling (22 Units) at Serenity Gose Noosa Heads, described as part of Lot 603
on SP188270 (proposed fot 9) Parish of Weyba
Applicant: CBD Settlers Cove Pty Lid

 

PROPOSAL REPORT

martoo

Development Application consulting a
pty ltd
seeking a town planners +

urban designers
Development Permit for Material Change of Use

fora

Multiple Dwelling (22 Units)

at

Cnr Banksia Avenue and Serenity Close Noosa
Heads

described as

Part of Lot 603 on SP188270 (proposed lot 9)

Applicant:

CBD Settlers Cove Pty Ltd

Prepared: January 2008 R00475- Lot 9 01-A

@E martoo consulting - Town Planning + Urban Design Consultants 1

 

Page 25

Proposal Report: Proposed Material Change of Use of Premises Multiple Dwelling (22 Units) at Serenity ose Noosa Heads, described os part of Lot 603

on SP{88270 (proposed lot 9) Parish of Weybo

 

Applicont CBD Settlers Cove Pty Ltd

Contents

1. IntrOMUCtION.L............:cccscsececesenereserseessnenenecesesaneanssensnseseneeecessaseeesenenecooseneesessnesessesaser 3

2. Basic INFOrmation ...........:ceccsscseceseseeeseseesenneneneseeseseneesncaesonsessonsnsenensnensanensnaeeseneeseeenas 4

3. The Characteristics Of The Site...........:ccsseeecsssscssenescersessecssesenecessensssseessnesesnersrenes 5
3.1 Location, Site Area and Shape ........ errr eens 5
3.2 Topography and Elevation «0.0.0.0... cece center eee 5
3.3 Existing Development on the Site .......... cece sere r ieee renee rere sense ren enee 5
3.4 Existing Infrastructure Servicing the Site 00... eee 6
3.5 Existing Vegetation . 20.0.0. nner renee 6
3.6 Site Conmtamimation........ cece eee ene EEE Eee EEE EM EEL Ene Ene bere end 6

4. The Characteristics Of The Surrounding Environment............ccsscscssererssesssneseseees 7
4.1 Description of Land Uses Adjacent to the Site and within the Surrounding

ATCA EEE ERE EEE EEE EEE EEE LEEDS SEES E EE EEE ERED EEE EEE ESE Lea 7

5. The Proposal
5.1 Building Design and Siting 20.0.0... ccc cece cence eet e ee bebe ee nea ber ne ne rern ene 8
§.2 Vehicular and Pedestrian Access and Parking .............0.o cece 8
5.3 Intent of Landscaping and Other Associated Development Works..............0..... 9
5.4 Proposed On-going Use... ccc eee eter e teen terete nent teen eta es 9

6. Development Assessment ..........:csecsscccsccssesencsoeeseresecssanesenscenecassceneecessaenseeesensesees 10
6.1 Superseded planning scheme.............6. 0c. ccc cece cece cence cette nent e ne nena ren etneaes 10
6.2 State Planning Policies......0.... cece nea e ere tenn e teeta 41
6.3 Proposed Multiple dwelling (resort) ............. 0c tenet tenes 12

7. COMCIUSION.........scssscccsssesesesseesscnesscnesenenecenescseseneeenssnecenenseesenesoseneesersseneesensnonsasenenanes 15

Annexure

Appendix A — DBI Design Development Application Booklet.............:cscssesssseeseens 16

a

&22! martoo consulting - Town Planning + Urban Design Consultants 2

 

 

Page 26

Proposal Report: Proposed Material Change of Use of Premises Multiple Dwelling (22 Units) at Serenity Close Noosa Heads, described as part af Lot 603
on SP188270 (proposed lot 9) Parish of Weyba
Applicant CBD Settlers Cove Pry Lid

 

1. Introduction

This planning report has been prepared for CBD Settlers Cove Pty Ltd being the applicant of the
development application over a proposed residential high density lot located at the end of Serenity
Close, Noosa Heads. This development application proposes to erect a Multiple Dwelling of 22 units.

The subject site is described as part of Lot 603 on SP188270 (proposed Lot 9), Parish of Weyba.

This current proposal constitutes ‘development’ as defined by Section 1.3.2 of the Integrated Planning
Act 1997.

This application requests that Noosa Council assess the above proposal! under the Superseded
Planning Scheme for the Shire of Noosa (SPS) and the Integrated Planning Act 1997. The proposed
Multiple Dwelling and Accommodation Building is a consistent use and impact assessable
development under the SPS.

This planning report covers the following matters in order to assist the assessment of this
development application:

* Section 2: The basic details of the application as extracted from certain parts of the
application forms;

* Section 3: A description of the subject site;

* Section 4: A brief description of the locality surrounding the subject site;

* Section 5: An explanation of the proposal;

* Section 6: An assessment of the proposal against the SPS and the Noosa Plan; and

* Section 7: A conclusion that provides summary grounds that support the approval of the
application as proposed.

The Noosa Council is the Assessment Manager for this development application.

Any words or terms are shown in ifalic font in this proposal report, refer to either state legislation or
terms defined in SPS and the Noosa Pian or direct quotes from this planning scheme.

The report concludes that the Noosa Plan severely affects the development yield that could be
achieved on site and that the application should be assessed under the SPS. The application is
indicated as complying with the requirements of the SPS and provides a development that is
consistent with the intent of the SPS and the Noosa Plan.

ae

G22 martoo consulting - Town Planning + Urban Design Consultants 3

 

Page 27

 

Proposal Report: Proposed Material Change of Use of Premises Multiple Dwelling (22 Units) at Serenity Gose Noosa Heads, described as part of Lot 603
on SP188270 (proposed lot 9) Parish of Weybo

Applicant CBD Settlers Cove Pty Ltd

2. Basic Information

Basic information relating to this development application includes:

Applicant:

Address of Site:

RPD of Site:

Owners:

Area of Site:

Current Use of Site:

Land Use Zonings:

Strategic Area:

Proposal:

Approvals Sought:

Referral Agencies:

Existing Easements:

Consultants for
Development
Application:

CBD Settlers Cove Pty Ltd
C+ Martoo Consulting
PO Box 1684, Noosa Heads Qid 4567

Cnr Banksia Avenue and Serenity Close Noosa Heads

Part of Lot 603 on SP188270 (proposed Lot 9)

CBD Settlers Cove Pty Ltd

6,664m2 (proposed lot 9)
5,330m2 (residential high density zoned land)

Site Office

Residential High Density

Urban

Multiple Dwelling (22 Units)

Development Permit for Material Change of Use

Environmental Protection Agency
Department of Natural Resources and Water

Yes
Architects: DBI Design
Town Planning Consultants: Martoo Consulting Pty Ltd

S22 martoo consulting - Town Planning + Urban Design Consultants 4

 

Page 28

Proposal Report Proposed Material Change of Use of Premises Multiple Dwelling (22 Units) at Serenity Close Noosa Heads, described as part of Lot 603

Applicant:

on SP188270 (proposed lot 9) Parish of Weyba
CBD Settlers Cove Pty Ltd

 

3.

Site Characteristics

3.1. Location, Site Area and Shape

The subject site (known as the site) comprises an area of land located at the western end of Serenity
Close Noosa Heads. The site is described as part of Lot 603 on SP188270 and reflects proposed Lot
9 of the approved subdivision of the site.

The site is of an irregular shape and is bounded to north by residential zoned land approved for unit
development, to the west and south by proposed conservation park and to the east by the proposed
Settlers Cove Resort.

The site is part of the Setters Cove Master Planned community and is located within walking distance
of Noosa Heads to the north and Noosa Junction to the south.

A plan illustrating the site and its location is provided below.

 

3.2 Topography and Elevation

The site is relatively level at the north western boundary with Lot 8 and gently slopes down towards
an existing rock retaining wall and sewer and access easement that forms the south eastern
boundary. A plan indicating contours of the site is included in the DB! Design Development
Application Booklet.

The existing surface levels are believed to represent the ‘natural ground level’ as defined in the SPS.

3.3 Existing Development on the Site

An existing single storey Project Office is located on the north eastern corner of existing Lot 603
however the subject site is vacant.

Approval to subdivide the site has been granted by Council under 23118 DA. This approval provides
for Lot 603 on SP188270 to be subdivided into 8 lots proposed Lots 4 to 11) as indicated by the
approved plan on the following page.

& martoo consulting - Town Planning + Urban Design Consultants 5

 

Page 29

Proposal Report: Proposed Material Change of Use of Premises Multiple Dwelling (22 Units) at Serenity Close Noosa Heads, described as part of Lot 603

Applicant

on SP188270 (proposed lot 9) Parish of Weyba
CBD Settlers Cove Py Led

 

LOT 600
CONSERVATION LAND

   
  

3.4 Existing Infrastructure Servicing the Site

The subject site currently has access to all infrastructure that commonly services urban development.
This infrastructure includes reticulated water supply and sewerage, underground telecommunication
services, overhead electricity supply, street lights, stormwater drainage, and bitumen roadways with
kerb and channeling and associated footpaths.

A sewer traverses the eastern most portion of the site, connecting the proposed multiple unit
developments within Serenity Close to a rising sewer main within Easement A which doubles as
public access easement. A concrete drain discharges storm water from Serenity Close into the swale
area within the public park.

A foot path and semi mountable kerb exists within Serenity Close adjacent to the boundary of
proposed Lot 9. This footpath follows the stormwater and sewer easement along the eastern edge of
the site, linking the Serenity Close with the access pathway that connects Noosa Sound with Banksia
Avenue.

3.5 Existing Vegetation

The site has been largely cleared in accordance with the approved Management Plan for the site,
based on the Allocasuarina and Callitris species much of which has re-grown following previous
clearing operations.

3.6 Site Contamination

The site has not been used for a notifiable activity under the Environmental Protection Act 1994 to the
best of our knowledge. Therefore, the site is not known or suspected to be contaminated.

S28 martoo consulting - Town Planning + Urban Design Consultants 6

 

Page 30

Proposal Report Proposed Material Change of Use of Premises Multiple Dwelling (22 Units) at Serenity Close Noosa Heads, described as part of Lot 603
on SP188270 (proposed lot 9) Parish of Weyba
Applicant: CBD Settlers Cove Pry Ltd

 

4. Characteristics of the Surrounding Environment

4.1 Description of Land Uses Adjacent to the Site and Within the
Surrounding Area

Existing land uses in the locality surrounding the subject site are characterised by a mix of residential
unit developments, residential dwellings and open space uses. More specifically the existing uses
that immediately surround the subject site comprise the following:

To the north: Residential/Holiday Accommodation (4 Store) - ‘Macquarie Lodge’, ‘Petrie
Mansions’, ‘Killara’ and ‘Elandra’

To the east: Future Duplex dwellings - Grant Street

To the south: Open space - park and residential dwellings

To the west: Future Unit Developments (Settlers Cove)

The site is within close proximity to the commercial, retail and recreational services and facilities
available in Noosa Junction and Hastings Street.

 

 

&

S2 martoo consulting - Town Planning + Urban Design Consultants 7

 

Page 31

Proposal Report: Proposed Material Change of Use of Premises Multiple Dwelling (22 Units) at Serenity Gose Noosa Heads, described as part of Lot 603
on SP188270 {proposed lot 9) Parish of Weyba
Applicont CBD Settlers Cave Pty Ltd

 

5. The Proposal

In May 2005, Council approved 23119DA for a Multiple Dwelling of 22 units on the above site.
These plans indicated a four storey building across the site with pool and recreational facilities on
the south eastern portion.

As part of the ongoing design and review of the Settlers Cove Master Plan, the applicant has
revised the building form approved for Lot 9. This application reflects these changes with the
applicant seeking approval for a Multiple dwelling of 22 units in two building on the above site at
Serenity Close, Noosa Heads. The design is considered to provide a building that is more
responsive to the built and natural environment.

Detailed plans of the proposal including an analysis of the site and explanation of the design intent is
included in the DBI Design Development Application Booklet attached as part of this application.

5.1. Building Design and Siting

The development proposed seeks to replicate the contemporary design of the 5 star resort that is
proposed on Lots 10 and 11. This design will ensure that the detail and scale of development to the
public park will be consistent in the area.

The proposal incorporates:
e 22 units in two buildings;
« Underground carparking for 43 cars;
« On grade carparking for 3 cars including 1 disabied bay:
« 25 metre lap poo! with attached plunge pool/spa;
« ‘Swim out' style plunge pools;
« BBQ /Bar pavilion with adjoining pool deck;
e Water features
¢ Building materials:
— rendered masonry walls;
- aluminium shutters;
~ vertical timber detail with cables;
— glass balustrade;
— stone cladding; and
—  colourbond roofing.

« Common bin storage area located at each lift core within the basement to service the refuse
and recycling chutes from each level.

« Rainwater storage tanks to be located within the basements and in landscaped open space
areas will be provided to collect water from roof areas for irrigation and pool top-up purposes.

The DBI Design Development Application Booklet included as part of the application demonstrates
the design philosophy of the development, the design constraints and the development form.

§.2 Vehicular and Pedestrian Access and Parking

Vehicular access to the site will be from Serenity Close and comprises a ramped access driveway to

a secure vehicular basement. The driveway is set back from the adjoining lot boundary to provide for
a vegetative buffer strip.

22 martoo consulting - Town Planning + Urban Design Consultants 8

 

Page 32

Proposal Report: Proposed Material Change of Use of Premises Multiple Dwelling (22 Units) at Serenity Close Noose Heads, described as part of Lot 603

Applicant

on SP188270 {proposed tot 9) Parish of Weybo
CBD Settlers Cove Pty Lid

 

As indicated above, a total of 46 car bays will be provided, including basement and on-grade visitor
carparking.

Pedestrian access will be provided by the existing footpath system located in Serenity Close.
Secondary pedestrian access paths exist to the south and east

Section 4.0 of the DBI Design Development Application booklet outlines vehicular and pedestrian
circulation around the site.

5.3. Intent of Landscaping and Other Associated Development Works

A detailed landscaped design will be prepared in accordance with the proposed building and design
plans of the Resort development; provided at the time of lodging a development application for
operational works (landscaping). Attention will be paid to the approved Landscape Master Plan that
was prepared for the Settler's Cove development.

The DBI Design Development Application Booklet contains a description of the landscape intent for
the site along with design concepts of water features across the site, stormwater harvesting, feature
planting, lawns, pool and pond areas and endemic garden beds. The landscape style is intended to
compliment the proposed resort on the adjoining Lots 10 and 11, integrating the public access path
along the eastern boundary.

Other development works will include building works, plumbing and drainage works, and operational
works for stormwater drainage and driveway and access construction. These works will be the
subject of detailed design and the lodgement of formal development applications to the Council once
the development permit for material change of use of premises takes effect.

The intent of these other development works includes:

* connection into Council's reticulated sewerage system including an extension to this system to
service each stage of the proposed resort; and

¢ connection into Council reticulated water system including a master water meter with individual
meters for each dwelling.

5.4 Proposed On-Going Use

With respect to the ongoing operation of the proposal:
« Refuse collection shall occur at the street;

+ Landscaping will be maintained at all times as a condition of the Body Corporate Management
Statement;

« Night lighting will be shielded and directed so as not to create a nuisance to surrounding
premises or traffic whilst providing some level of passive security over the public access way
along Easement A.

« Water levels to swimming pools and reflection ponds will be maintained through the use of
harvested stormwater.

tt martoo consulting - Town Planning + Urban Design Consultants 9

 

Page 33

Proposal Report Proposed Materiel! Change of Use of Premises Multiple Dwelling (22 Units) at Serenity Close Noosa Heads, described as port of Lot 603

Applicant

on SP/88270 (proposed lot 9) Parish of Weyba
CBD Settlers Cove Pry Led

 

6. Development Assessment

As indicated above, the application seeks a development permit a material change of use of premises
Multiple Dwelling (22 units) for the above site.

6.1 Superseded Planning Scheme

The applicant seeks assessment of the proposal against the provisions of the Superseded Planning
Scheme, (consistent with the approved development approval across the site (23119 DA)) as the
2006 Noosa Plan has detrimentally affected the development potential of the site.

Under Section 5.4.2 of the Integrated Planning Act, an owner of an interest in land is entitled to be
paid reasonable compensation by a local government if—

(a) a change reduces the value of the interest; and
(b) a development application (superseded planning scheme) for a development permit relating
to the land has been made; and
(c) the application is assessed having regard to the planning scheme and planning scheme
policies in effect when the application was made; and
(cd) the assessment manager, or, on appeal, the court—
()) refuses the application; or
(ii) approves the application in part or subject to conditions or both in part and subject to
conditions.

A change to an interest in land means a change to the planning scheme or any planning scheme
policy affecting the land. An owner of an interest in land, means the owner at the time a change to
the planning scheme is made.

The Act details a number of limitations on where compensation may NOT be payable including where
the change:

5.4.4 (1)(c) is about the relationships between, the location of, or the physical characteristics
of buildings, works or lots, but the yield achievable is substantially the same as it would have
been before the change;
5.4.4 (1)(h) affects development that, had it happened under the superseded planning
scheme —
(i). would have led to significant risk to persons or property from natural processes
(including flooding, land slippage or erosion) and the risk can not have been
significantly reduced by conditions attached to a development approval: or
(ji) would have caused serious and environmental harm as defined in the
Environmental Protection Act 1994, and the harm could not have been significantly
reduced by conditions attached to a development approval.

The Act defines Yield as:

5.4.4(2) Yield means:-
(a). for buildings and works - the gross floor area, or density of buildings or persons, or plot
ratio, achievable for premises;

Under the zoning maps to the SPS, the site was included in the Residential High Density zone which

provided a gross floor area (GFA) based ona maximum allowable population in persons of the site

multiplied by 40 and not to exceed 13, 600m’. Advice from the Director of Planning indicated that this
maximum was to relate to any building on the site and not the entire development.

A maximum of 250 persons per hectare was detailed for the zone which provided a maximum
population of 134 persons for the site and a GFA of 5, 330m? under the SPS.

The Noosa Plan includes the site in the Attached Housing zone which provides conflicting provisions
relating to development in the zone. However Outcome 013 for the Attached Housing Zone states that
buildings are to have a bulk and architectural scale that has a maximum plot ratio of 0.5:1 up to 1.0ha of

Te martoo consulting - Town Planning + Urban Design Consultants 10

 

Page 34

Proposal Report:

Applicant

Proposed Material Change of Use of Premises Muhiple Dwelling (22 Units) at Serenity ose Noosa Heads, described as part of Lot 603
on SP188270 (proposed tot 9) Parish of Weyba
CBD Settlers Cove Pty Ltd

 

site area and 0.3:1 for that part of the site area above 1.0ha. This outcome effectively provides a GFA of

only 2,665m? which is substantially less than that permitted under the SPS.

The table below further illustrates the difference in yield of the two schemes.

 

 

 

Scheme Requirement Superseded Planning Scheme Noosa Plan

Site Area Minimum 600m? Nil

Population Density 250 persons/hectare 250 persons
134 persons 134 persons

 

Gross floor Area

Maximum population X 40 - not to
exceed 13,600m’ for any buitding -

5,330m?

Maximum population X 40 - not to
exceed 13,600m’ for any building -

5,330 m?

 

Plot Ratio

nil

Plot ratio of 0.5:1 up to 1 ha and 0.3

after-

2,665m?

 

 

 

 

 

As demonstrated above the Noosa Plan significantly reduces the plot ratio, effectively diminishing the
gross floor area achievable for the site. This loss in floor area is significant and reduces the value of
the land. The yield in the scheme is not the same as previously provided by the SPS or approved
under 23119 DA.

It is noted that the development does not pose a risk to the natural processes and is consistent with
the overall pattern of development envisaged for the area.

A review of the proposal against the Noosa Plan indicates that the development is generally
consistent with the requirements of the Plan as the site is included in the Attached Housing zone.

The applicant therefore requests that the application be determined under the provisions of the
superseded scheme. It should be noted that whilst exceeding the GFA provisions of the Noosa Plan,
the proposal does not seek to maximise the available GFA or site cover under the SPS.

6.2 State Planning Policies

6.2.1 Vegetation Management Act 2004

The Settler's Cove development site is mapped as containing a ‘Remnant of Concern Regional
Ecosystem’ as per the Vegetation Management Act. The site is contained in an Urban area and in
accordance with the Vegetation Management Act, development will not require approval to clear
vegetation.

6.2.2 Planning and Managing Development involving Acid Sulphate Soils

The site slopes from R.L 22 to R.L 8 and whilst the proposal steps with the natural landforms,
excavation may trigger referral to the Department of Natural Resources, Mines and Energy.

6.2.3. Mitigating the Adverse Impacts of Flood, Bushfire and Landslide

Any development application will be required to demonstrate that the development will not result in
adverse impacts on peoples safety, minimises potential damage to property and all essential
services maintain their function. Management Plans that address these issues have been
approved by Council for the site.

13) martoo consulting - Town Planning + Urban Design Consultants 11

 

Page 35

Proposal Report:
Applicant:

Proposed Material Change of Use of Premises Mutiple Dwelling (22 Units) at Serenity ose Noose Heads, described os part of Lot 603

on SP188270 {proposed lot 9) Parish of Weyba

CBD Settlers Cove Pty Lid

 

=

6.2.4 South East Queensland Regional Plan

The South East Queensland Regional Plan includes the site in the Urban Footprint. The
development does not require referral to the Office of Urban Management.

6.3 Proposed Multiple Dwelling (Resort)

The assessment table for the Residential High Density Zone lists Multiple Dwellings as consistent
uses and lists such a use to be impact assessable development.

6.3.1 1997 Strategic Plan

The Superseded Strategic Plan for the Shire of Noosa includes the site in the Noosa
Heads/Noosaville Locality and provides the site with a Semi-Detached & Attached Residential
designation over the northern portion of the site with an Open Space - Conservation & Waterway
Protection designation over the southern boundary of the site. The Semi-Detached & Attached
Residential designation within this locality aims to:

19.2.1 ‘Provide urban semi-detached and attached residential areas with high levels of amenity
consistent with the maintenance of the character of the Noosa Heads/Noosaville locality and the
particular part of the locality on which the area is situated.’

The Superseded Strategic Plan indicates key features of buildings for sloping sites as:

Are low rise and which respect the scale of other development in the particular part of the
locality. - The proposed development is consistent with the scale of surrounding units’
development to the north. The proposal is consistent with height requirements of the
zone.

Have low site impact, enhancing the opportunity to maintain natural site characteristic. -
The design exploits the natural landform by concealing carparking and providing
extensive landscaped edges to the surrounding area.

Integrate with the landform by stepping along or with the slope of the hill and dune
systems, without the need for extensive cut and fill. - The development has been
designed to step down the slope of the site with the basement level excavated into the
site and ground levels reinstated to ensure the natural contour of the site is maintained.

Vary in line and plane, complementing the landform changes and landscapes which are
characteristic of the area. - The development is well articulated with the resort contained
in two separate buildings that are located across the natural contour of the site. The
fagades of the buildings are well defined with a range of different materials, balconies and
setbacks.

Respect the public spaces about the site. - The units have been designed to integrate
with the Serenity Close streetscape through the use of extensive plantings, staggered
location of the individual buildings and roof lines and location of pedestrian access to the
site. The units focuses on the pool and extensive landscaped grounds and the view to
the public parkland to the southwest.

Promote the concept of small separate buildings rather than larger single bulky
developments. — Compared to the proposed approved under 23119 Da the proposed
seeks to create two buildings instead of one staggering their relative orientations to
create interesting spaces between and around the built form and stepping building in
effective height.

The Superseded Strategic Plan highlights the importance of maintaining small separate building
entities. The proposal seeks to create smaller separate buildings whilst providing a functional and
efficient layout for a unit development.

* martoo consulting - Town Planning + Urban Design Consultants 12

 

Page 36

 

Proposal Report: Proposed Material Change of Use of Premises Muttiple Dwelling (22 Units) at Serenity Close Noosa Heads, described as part of Lot 603
on SP188270 {proposed lot 9) Parish of Weyba
Applicant: CBD Settlers Cove Pty Ltd
6.3.2 Schedule to the Planning Scheme

The subject site is included within the Residential High Density zone, the intent of which is to provide
for high density residential uses with building heights of 3 to 4 storeys in height. The zone is intended
to provide for holiday makers and tourists and performance standards are indicated as seeking to
control the impact of buildings and to ensure their compatibility with the site.

The proposed use is considered to be consistent with this intent providing a high quality and well
designed unit development with a ‘resort feel’ that reflect and enhance the natural attributes of the
area whilst complimenting the proposed resort facility of proposed lots 10 and 11.

Section 5.3 of the Planning Scheme provides a number of performance standards for multiple

 

 

 

 

 

 

 

dwellings. The following table summarises the compliance of the proposal against the relevant
development provisions:

Provision Requirement Proposal Response Compliance

5.4.1.1 600m2 §,330m2 v

Site area

5.4.1.2 Road frontages:

Setbacks 6.0 metres — two storeys 10 metres v
10.0 metres — third and fourth | 10 metres v
storey
Rear:

6.0 metres Complies y
Side: y
Half building height Complies

Bullding Separation v
1.5 metre plus 0.5 per storey - | 6.9 metres

3.5 metres

5.4.13 The length of wall in any one | 16.4 metres Minor area of non compliance

Length of Wall plane is less than 15 metres

5.4.1.5 Carparking not to be located | Car parking located in

Car parking between facade and road ] underground basement v
frontage and integrated.

Multiple dwelling -

1 space per dwelling unit plus | 33 spaces v
one space per two dwelling

units (tandem) - spaces

5.4.1.6 6.0 metre landscaped setback, | 6.0 metres v

Landscaping excluding access driveways
Visitor carparking 2.0 metres Complies v
20% of site - deeply planted Complies v
Fencing setback av 2.0 metres | Complies Y
Av 3.0 metres deep planting to | Complies v
road
Refuse contained setback 2.0m ] Refuse area under building

5.3

Population Density 250 persons /ha - 134 persons 72 person v

 

 

 

 

 

12 martoo consulting - Town Planning + Urban Design Consultants

13

 

 

Page 37

Proposal Report: Proposed Material Change of Use of Premises Multiple Dwelling (22 Units) at Serenity Gose Noosa Heads, described as part of Lot 603
on SP188270 (proposed lot 9) Parish of Weyba

 

 

 

 

 

Applicant: CBD Settlers Cove Pty Ltd
Gross floor area Max pop x 40 - §,330m2 4,400m v
Site Cover 40% 27% v
Landscaped Open | Proposed Pop x 14 - 1876m? 3885m? v
Space
Building Height 4 storeys 4 storeys v
15 metres 15 metres v

 

 

 

 

 

 

32 martoo consulting - Town Planning + Urban Design Consultants 14

 

Page 38

Proposal Report:

Applicant:

Proposed Material Change of Use of Premises Multiple Dwelling (22 Units) at Serenity Close Noosa Heads, described as part of Lot 603
on SP188270 (proposed fot 9} Parish of Weybo
CBD Settlers Cove Pty Ltd

 

7. Conclusion

The above development application has been submitted to Noosa Council as the Assessment
Manager of the application under the Integrated Planning Act 1997. This application seeks
assessment under the Superseded Planning Scheme for the Shire of Noosa for a development permit
for Material Change of Use of Premises for a Multiple Dwelling 22 (units).

This application under the SPS can be supported on a number of grounds including the following:

The Noosa Plan detrimentally reduces the overall gross floor area and yield for the site;

The proposal is consistent with the provisions of the Superseded Strategic Plan which identifies
the site as being suitable for a resort accommodation;

The proposed material change of use of premises for Multiple dwellings generally complies with
the development parameters of the SPS.

A development approval is current on the subject site for 22 units (23119 DA)

The subject site is within close proximity to a range of commercial services and community
facilities considered necessary to support residential accommodation;

The proposed multiple dwelling demonstrates high quality design incorporating a mixture of
building materials, building line articulation, landscaping opportunities along all property
boundaries and extensive landscaped areas;

The proposal is generally consistent with the scale and form of the surrounding unit
developments opposite the site;

The development of the site for a residential units is consistent with the overall pattern of
development envisaged for the area;

The site has access to all urban infrastructure considered essential for the specific nature of the
resort development proposed; and

The Assessment Managers favourable consideration of the above development application is
therefore recommended.

S222 martoo consulting - Town Planning + Urban Design Consultants 15

 

Page 39

Proposal Report: Proposed Material Change of Use of Premises Multiple Dwelling (22 Units) at Serenity Close Noosa Heads, described as part of Lot 603
on SP188270 (proposed lot 9) Parish of Weybo
Applicant: CBD Settlers Cove Pty Ltd

 

Annexures

Appendix A - DBI Design Development Application Booklet

&

* martoo consulting - Town Planning + Urban Design Consultants 16

 

Page 40

q WHL-dS-¥ “ON SNLWWHO -

SSL “on toarcue -

 

80 N¥I ava +
ty 8 0024 wos +
waOVT] Lozroud caNOZHO +
HOLOZMC LOarOMd
-
dW NMvud « eae
-
Mery Lg aon MILA HO GTLIOW ae
dora as-ners-inasioer gas HTT ra
” “ “
¢

THAI GNNOYD Y3M07
4 13431 a
NV 1d JIS

AL DNUMWHO +

                   

°

q
’
»
0 80 185 \ »

100d

JA0) S.N71LL9S

BWYN 193°0Ud «

‘mad A a WR LOW nd MORON Lee AL 3ANNN Be CRP
Gavteat sabi iireom (fue Aut 210 90MmRNC LA OVTTCY SWOT CMD De
(Reverws Litse utretLieay Cot Gi Pdvere Kaban (RLM BS URRY = 09 8,

Nee oy OL) “Ad Now) wow

             

een eee aie ie tne 8

N 9 1! § 3 gq

a

 

S

00S 0175S

XN

 

OE

 

i

   

006 0158
3

     

ay

       

 

@ '
ea !
' Q.

'

t

'

!

t

 

OE,

      

05.0185

CLIT ALd SLNBVULSHANI
~

CUYANOG ad¥— N
. '

!

t

!

 
    

ZN

o>“ SNAWaSVE
" ONRBYd LINN

    
      

  

FLALS VSOON 40 BONESSS AL

HAOO § WeLLLES

o
N

 
  

\

 

81071

a WORTHY IMENT a
a wesisneetig wana
FaIO_AW nouauIgad —siv0_ ON
Halon NOISIAAY

  

Asolo ALINSYSaS

Page 41

a ZOLL-OS-V ca cnnnavua «
SUSLO «on soaroue -

80 NY ava +

yO 00z1 aos +

wROVET 2:
D3POId Gays «
NOLORMG 193r0ud

dW NMWH +

ORLY GOO HTAN. CLIO
Mote rasrrsinanstosr gyn iin 9 RITE

THA91 QNNOYD
7 13A3)
NV 1d JLIS

Flu. ONIMWEG +

JA0) S.4911 138

BWYN 103f0Hd +

     

000 7175S
g ONIATING

       

eo

L1 Ald SLNHVULSHANT

auvANog sdVD

ATLALS VSOON dO SONZSE CHL

HAOO S WH LLLAS

 

 

|_2

 

 

 

 

 

8 L071

PUIL DESPRE PCERC CLERIC ISIE ISEINEELS
SHINN Ty aT pavo same y swore sents stoarinoes

Page 42

q fO11-0S-¥

AUISLO “oN s93roue -

“ON ONIMWUG ©

SO NV iva +
WO 0021 aS «
¥30V37 LOarONe pono +

woLosHd 19370Nd
dW NMHC ©

LE HABE HL LEO
Deo Las raves TONS T ene TAM GLANCE ATTN

€ 7247)
NV 1d LIS

ATLL ONIMWHO *

IAQ) SUF TLL3S

BYIWN LO3rOud +
Cree Ho wD FR NON SOLANA ena M8 4 228M A MCS
Brea EAT iped ae 0 Bevme 1B ESVTEN fers a” BAAR
Fucsow cnesr ate eect fo ge) erage CLO ‘iro do
emer HO ba Om et >

          
  

O00 USS

/ \
e I / @ ONITTING °

/
. /
LT ALA SLNEVULSHANT

GuvANog sdvD ™~

'
‘
NN y /

OO S WA LLLAS y
HAO S.¥ | // am
Vv ONIGTING

Ss

 

8107

i MAA

A associa eal

=a sa a
vor NOISIATY

ASO1D ALINSYAS

 

Page 43

POLES EMME EIEEEEESEM STONY FOIE ECEESCERES

q IOEV-OS-¥ comme

BUGLO ‘on ssaroue +

80 NVI aiva +

WO o0zt aos «

H30V31 LO3fONd aawo3Ho +
HOLISMIO LD3frOud

dW NMYUG +

SIH LS Hao MZANAT SL DEIN
ep rao rent anen See LAR UNL LYST

913A)
N¥1d JLIS

an ONIMVUG +

JAQ) SUF 14S

BWWWN LOarOud +

 

'

1

1

' 4 poo aess)
| \ g ONITIING LS
1

t

!

1

'

t

t

 

CLT ALd SINHVCLSTANE
™~

CaVANOG ad¥D NC ) /
1 a
1

WIALS VSOON dO SONHSS AHL
y /

HAOO Sua LLLAS
J [ooorae 75]

—= 5) Yi / / SNIaINa

>

 

 

 

g101

vou su fay
SG LIHAT “MAEAL_Y

oe
NOISIAaY

  
   

 

3SO19 ALINSYAS

 

Page 44

q GOVL-OS-¥ comme.

SUGSLO “on 193roMe +

80 NYE anya +

WO 0071 aos +

wa0WA) L93rOdd apogHo -
HOLOTWO LOS

dH NMVHO >

MH LE USOT MLA HINO EIIOW
Sosa la ness sean gALAnS TH

§ 13431
NV 1d JLIS

FIUL ONIMVEG +

4A0) SWI L9S

SINYN LOBFOUd +

       
 

’ g ONITIING

 

CUVANOY sav D NX i, /
SL WW .
J // .
BTIALS YSOON dO HONASSH HALL y é
HAOO § arLLLas J'// noi
ro | v SNIGTING

 

2

 

 

 

 

8 LOT

 

  

i re I Wann :
“7 eae CISIAgY Lo nS ~~ ;
~ 3SO19 ALINSYAS SS,
nN ™ : N\ : s.
NON

 

Page 45

q G0L1-0S-¥ romano

BIISLO ‘on 1o3roud -

80 NVI aiva +
Ww 8 0021 aos «
w30W97 193f°0ud 93"03HO «

¥HOLDTHID LD3rONd
dW MMHG ©

HAG GE UAL FH CTLIO
Seas Hess tHG SORT UNM MNS FIT

NV 1d 4008
§ T3A7]
NV1d J1IS

SLL ONIMVHG ©

JA0) SMTTLLIS

BWYN Logrous *
oan ss 60 THOR {01 NOLEN MERON TU Os LD8CENN De
owen ce 19a 20 Berean EASTON UOTE ONION” SEN
fnneon cited mut patra sat oP) tees Redenhe 9 LAM BAD) LO
ee cnet an ae NO nut noma mo

BTLALS VSO0N do ONASSH AKL

HAOO S aa LLLAS

——

2

 

 

vooW my ceZa ¢
a Paid aaa

aS
HLNON NOIsIAaY

  

 

aoniaiina -”

3SO19 ALINAYSS

   
   

8101

Page 46

PROPERTY BOUNDARY

Setback requrement for 05 of budng height

PROPERTY BOUNDARY

 

‘om SETBACK

$0 HGH LT WL

T5m SETBACK

 

Wm HEIGHT LRAT - NOL

6m SETBACK

PROPERTY BOUNDARY

 

 

 

 

 

SECTION BB

 

 

PROPERTY BOURDARY

 

 

 

 

 

‘on SETBALK

 

 

 

   
 
 
   

 

PROPERTY BOUNDARY

\,
\ gerbachrequreent for 05 af balding hegh

 

 

 

ID
SRERTTEC Ts LINER IONE SLAW OB OAPE eREAANING

REVISION

Na_DATE_OESCRP TION BY_CrECK
A ANZON SUE FORK *

|
>
SETTLER'S COVE

‘THE ESSENCE OP NOOSA STYLE

 

 

« PROJECT NAME,

SETTLER’S COVE

+ DRAWING TITLE

OVERALL SECTIONS
SECTION A-A & B-B

PREDATES GAD MTSU ros SNK se ASD 4 ig
PROVED ON THE TaVTNM @ KEEN OE HPeters

+ DRAWN “Pp
PROVES

CHECKED CT ORRECTOR
PROJECT LEADER

vseue HOU @ AI
“ate Nov a7
-prosectno, — Q151t5

+ DRAWING NO. A-SD-4.101 A

Feenvarie pete R ieee gt sbeechee paneer

 

Page 47

i) FReRITECTE VINTER LORE VTA MOPOABE SE PERBMING

 

    
   

 

 

 

 

      

 

   
 

 
   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1%0 an t = +
sae <6 aoe
1 +
+
h <>< BALCONY 1 ; Om AON im ee
|}___—_» 4 1 TANT SUL (OEE ©
~yBEDROOM 1} ic. 7 BEDROOM 1"
a i: Oh, 6S
Ming
IN
LIVING
z
=
+
' . =“
|
0 |

 

 

 

 

 

 

 

 

 

 

UNIT TYPE 3A = “ UNIT TYPE 3B SETTLER’ § COVE
SCALE -1 100 , SCALE -1- 100 ‘THE BSSENCH OP NOOSA STYLE
INTERNAL | BALCONY/S | TOTAL INTERNAL | BALCONY/S | TOTAL
3BEDROOM = 190 2 ‘3 BEDROOM 192 sqm 51sqm | 243 sqm
sqm 9 sqm | 219.sqm 4 4 sq CAPE BOUVARD

INVESTMENTS PTY LTD

BEDROOM 1

 
 

 

 

ENS

 

 

 

 

BEDROOM 1

      
 
 

 

 

 

 

  

 

 

 

 
  

  

Vv

     

| BEDROOM 3

  
  
 

+ PROJECT NAME

SETTLER'S COVE

 

 

 

   

 

 

iL

    
  

WIR

 

 

NS

 

 

 

    

Qo
t
ti
Q

 

 

BEDROOM 3

 

 

 

KITCHEN

 

 

|

   

BEDROOM 2 ,I||_/

 

 

 

 

 

   

 

 

 

 

UNIT TYPE - 3BEDA,B
C80

= FUP AUR: GR TUTSEB Urea ngs SDA plant A-S0-2 90 tag
PLOTTEDON TE Prev 0G @ 5521 BF HPelers

|
_ “UNIT LAYOUT PLAN

  

‘
1
1
'
j

 

! |
UNIT TYPE 3C - LOWER UNIT TYPE 3C - UPPER UNIT TYPE 30 "CHECKED FORT UEADER
SCALE -1:100 SCALE -1 100 SCALE -1 06 * SCALE 4100 @ AI
+ DATE, MAY 67

INTERNAL | BALCONY/S | TOTAL INTERNAL | BALCONY/S {| TOTAL INTERNAL | BALCONY/S | TOTAL “PROMECT NO. TSI
1 BEDROOM 56 sqm 17sqm | 73sqm 2BEDROOM 150 sqm Tem 167 sqm 2BEDROOM =. 212 sqm 33 sqm | 245 sqm somawenene” A SD-2.3.02

+ DRAWN MP

   

Page 48

 

 

LAND USE SECTION FEES

i a

RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation 111

APPLICATION FEES

Material Change of Use - Cogetfinpact”) . .
521

 

 

 

 

 

 

 

Consistent
Inconsistent §21
Assessment under Superseded Planning Schem ju 275 ao 521
Modification to a Development Permi : 521
Extension of a Currency Period : 521
@ Operational Works - Landscaping §21
Bldg Work assessable against the Planning Scheme 521
PRE LODGEMENT REVIEW
Half Hour §22
One Hour : 522
ADVERTISING
Purchase Advertised Applications 523
JETTIES
Jetty Application Fee 524
Jetty Bond 51
(Category 4)
BONDS
Performance Bond 51
(Category 9)
SIGNS
@ Registration Fee , . . 222
SEARCH FEE
Search of Land Use Section file 112
Liquor Licensing Request 113
TOTAL. $ W~n7nVv¥
NAME: RN Sotterny Court //E
ADDRESS: ef-_frartee  Contisth so
Po Boxe [ere Fe LHeags YI?
- - f
FILE NO: o8|ins DATE: tf fof
RECEIPTNO: (5 BO Y Signature of TP Officer: (’S Sy20 a
AUTHORITY NO: i

 

(3/2oe8/ 17s]

Page 49

CALCULATION OF FEES

 

 

 

 

 

 

APPLICATION FEE TOTAL
FEES
MCU - CODE ASSESSMENT
Details of Development
Consistent 1.0
Inconsistent 3.0
FEE CALCULATION
La) $
MY MPAGT ASSESSMENT
Detai evelopment
Consistep , 2D
Inconsistent 3.0
FEE CALCULATION
5 @ {ee $ur50
Ss e Pas 36 ae .
/2@ ¢ S75 bee $ IG WTS.
OPERATIONAL WORKS .
Details of Development
FEE CALCULATION
$

 

 

TOTAL FEES

 

 

Page 50

auNIOTLIHOuY

[ead

800% AYVWANV | VC

SAOOSIOIIOS

SLNSWLYVdv WILNSGISSs 6L07

 

i

 

¢

 

Page 51

contents

1.0 APPLICATION DETAILS

1.1 application details & consultants

2.0 EXECUTIVE SUMMARY
2.1 executive summary

3.01 OCATION & CONTEXT
3.1 context
3.2 location

4.0 PLANNING & URBAN ANALYSIS:
4.1 settlers cove masterplan

4.2 current approval

4.3 current approval

4.4 current approval

4.5 precinct and height analysis
4.6 circulation & connectivity

§.0 SITE ANALYSIS

5.1 site photo - serenity close facing north east
5.2 site panorama - view along fire break trail and wetland

§.3 site view - facing south east

5.4 site photo - view facing north west

5.5 constraints and opportunit.es
5.6 cross sections

11

14
15

18
19
20
21
22
23

26
27
28
29
30
31

6.0 DEVELOPMENT SUMMARY
6.1 development summary
6.2 development summary

7.0 LANDSCAPE INTENT

7.1 landscape masterplan
7.2 landscape intent statement
7.5 recreational precinct

7.6 forecourt precinct

7.7 private open space plan
7.8 pools and water features
7.9 materials and finishes
7.10 materials and finishes
7.11 planting and species
7.12 planting and species
7.13 planting and species
7.14 planting and species

8.0 ARCHITECTURAL INTENT

8.1 Concept layout design

8.2 architectural intent statement
8.3 rcaterials and finishes

8.4 caiour samples

34
35

38
39
40
41

42
43
44
45
46
47
48
49

54
55
56
7

9.0 ARCHITECTURAL INTENT
9.1 lower level ground floor plan
9.2 level 1 / ground floor plan
9.3 level 2 floor plan

9.4 level 3 floor plan

9.5 level 4 floor plan

9.6 roof plan

9.7 sections aa

9.8 sections bb

9.9 unit type floor plans

9.10 unit type floor plans
9.11 elevations

9.12 eievations

60
61
62
63
64
65
66
67
68
69
70
a

Page 52

Page 53

 

Application Details And Consulants

Client / Applicant:

Site Description:

Site Area

Application Details

Consultants

Cape Bouvard Investments Pty Ltd

Serenity Cove

Settlers Cove

Noosa Heads QLD

Lots 9 on Lot 4, SP 100064, Parish of Weyba
Approval 2005 = (6 534m?)

Current = (6 664m?)

Proposed = (6 032m?)

Code Accessible Development Application for a Material Change Of Use

Architecture & Urban Design: DB! Design

Contact: Ewald De Weerd (07) 5539 9788
Statutory Planning: Martoo Consulting

Contact: Nadine Gorton (07) 5455 5425
Landscape Design: DBI Design

Contact: Scott Godfredson (07) 5539 9788

~“N

SIUB]NSLOD Y Seep uoHVeoyade pL

Page 54

=k
©

 

@ ; "

Page 55

 

EXECUTVE SUMMARY

 

 

 

The subject site (0.66 ha) forms part of the Settlers Cove masterplanned community, with an outstanding location and size, providing opportunity for ah yh
class residential development.

Settlers Cove 1s centrally located in Noosa Heads and a future boardwalk along the creek wil allow people to access the beach, public transport or Hastings
Street within 10 minute walk.

The proposed development is on lot 9 which slopes steeply towards the park with southern views of Noosa Shores, wetlands and distant hinterland.
The Proposal includes 22 apartments with a mix of large 2 and 3 bedroom units and 2 penthouses.

All car parking is accommodated in basements with few short term visitor spaces at grade near the main entry.

Visitors to Settlers Cove will arrive via Banksia Avenue with lot 9 on the “cul de sac” of serenity close.

Main access to the site is from Serenity Close with a grand arrival fore court and porte cochere with water features and strong visual axes between reception,
over reflection ponds. resort pool and landscape feature in park,

The architectural treatment will be consistent and en extension of the proposed 5 star resort hotel but respond and fit within the current Settlers Cove
Masterplan and residential ouilt form.

Height limit is 4 storeys and a low site cover of below 25% allow for opportunities to improve existing vegetation with high class landscaped recreational
facilities and connectivity with park, streetscape and wetland.

The development consists of 2 buildings 4 storeys in height and focus on achieving north-south aspect and cross flow ventilation

rag

—_
_

‘3

ta

1

 

ABVWIANS SALLNOAX4

lof O

Page 56

 

vl

Page 57

lo

 

Page 58

oe |
agasOd0ud

 

Bt

Page 59

      

          

             
        

 

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Vv0nS"60°S+Z0
‘Ong Byeaacy
tN
AQ uma
0 190 2¥@002:1
a wren
wae ag ee™ Nee
Oe eae eT YN
mOOSMMUBS —— pe gge nne = oe
SQV3H VSOON AyMHLd ONIESONVAIN SAIN WE -
3SO70 ALINAYAS 6 107 tt : ZrO SE f~-
tnandorand UN angt peg CLG OE Ciba” Eee pt YN .
Man qa80¢0¥¢ i © “Sh6Gede, AN Ba ae OAS NM, y Seay wayyoeag fe15200,
— GerSO/2 Seuyapin6 Budeospue;
* OSN WP soURpIODIE Ui ago}
Budeospuey syrom jeuoguado,
sJapun uoges|dde sayuny 0}
algns Budesspue) exeoipuy
Sie (. 1aA3a))
BE . “NV1d YOO1d WOIdAL
¢ ee)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Weperg wa LORNA pamany,
0016) WY.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ma 6) werd fo
Rapa 928007) 10
vs aaa a
una wyraict)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Ne ea ene PE yee
Fi gevesb0e-

: : S
8

AWMAASG , pon Ig
‘ 2
. 1 amet 5

 

 

       
          

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Lo

5 COS

 

 

 

 

 

 

 

 

~ACE FOR

SP,
WATERWAYS PROTECTION

 

 

 

 

 

 

CONS Lrrs 20 tO
CEES Lrrg 10 Sunda,

 

 

 

 

 

 

1957 G10 BPEGH BTOOH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

OPENS

“ET Fe i

 

 

 

 

292 98 Od

 

  

4957 71D wpeng euyauns
WAQS 84 07

          

suaubisap

eee che wove
SWOLISA

p e)) >| Hays g HANNS un

i
7 i
Q3A0Udd¥ SNYId | Spe
WINAOD FeIhy VSUON |

 

   

13° Carrent approval

Oc

Page 60

   
        
  
      
  
 

kidd
Noosa SHIRE COUNCIL +CO
LANS APPROVED

SIGNARURE:.... Sor Le...

designers

™,

oo

20 Duke Sueet
‘Sunshine Beach QLD 4567

PO Box 252
Noose Heads OLD 4567

Telephone 07 6447 5633
Facssie 07 5447 5833

[email protected]
were hu9050.00M,041
‘hs Oamng 4 Ode

Q fax) copie wf
S Kagaenes Dregs &
BR —

 

OE

WI HOVLBE HY

x
NOUDUOUE SAVMYZLYM ONY
NOLLVAYFSNOD HOF FOVES NIAO BL VARI,

592002 dd VLWF
66

NGL? _..

     
 
    
    
 
  

 
   
  

002

| n\
\ aon)

a

 

28559
0Z6E0262

 

 

 

 

“SEWEREMTH

Prcgect

PROPOSED NEW

. UNIT OEVELOPMENT
- - LOT 9 SERENITY CLOSE

Landscaping subject EADS

to further application under =

‘operational works' Landscaping SET TLERS COVE

to be in accordance with NSC SITE PLAN 1:250

landscaping guidelines 25/05/95 Seale ae

‘Coastal Beachfront Areas’ ome OT

Nu

0215.09.SKO2A

 

= org
raze fl:

=
o

AOIddE JUSUND Zip

Page 61

stil UPB tel]
LeJPLUC=y ey Easy
LC ses
Blo} t-7.Xes [o[e | 1

SAa10}s p * ite

Woses pesodoid

 

“www r reve eeseeeeeeeeeeeaeeee eee eee 8 8 ee

Page 62

 

EAST ELEVATION...

 

Nosy SHURE COUNC'E

PLANS APPROVED
seve at. KCoyls

nett q hry .3Ge9

 

 

 

   
 

NORTH ELEVATION...

kidd
+CO

designers

 

N
—_

20 Dvke Street
‘Sunshine Beach OLD 4367

PO Bow 282
Nooss Heads OLO 4567

Telephons 07 $447 5633
Fecslmie 07 $447 5833

[email protected]
wore kiddeo com att
THe drown 4s bbe

tend bh corhonton

acre a

BADIA SUNDA Fr

"WMA, 191004
Revised locaton of of buifings

Protect
PROPOSED NEW
UNIT DEVELOPMENT

eestor
LOT 9 SERENITY CLOSE
NOOSA HEADS

chert

SETTLERS COVE
Det

ELEVATION SHEET 1
Some One
4:200@A2 OCT 04
Orewn By

NJ

0215.09.SKO9A

4B 0:9

Page 63

i]
Pad
«
#

Ny
4
Ln

PN Niele

4
F i 1
i
}
in
%

 

Fr Co

Page 64

 

26

 

Page 65

 

 

2

 

Page 66

 

28

Page 67

62

 

Page 68

 

30

Page 69

Le

— S.-C —

ANVONNOG ALYIdOYd |

WWELIS U9

ee

TON ~ LINN] LHOIZH w

ch

 

AMVONNO ALYId0Hd

 

AUWONNOG A1YId0Hd

Page 70

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

€e ve 6 pasinbay |2j}0]

GLX GLX sie)

19 zz 9} 9 Ayisuag 9 sjuewpedy

uonejndod| je30} | wage | wuiqz ALIS YOd TWLOL

CY vb OL v 12301 qnS

0 0 0 wed JeD F sjueulpedy [@Aa7] PUNDIS) JBMO7T

Zeer v v '  sjuauuedy! = [8A87] PUNDID / |, [PAR]

vibe v z Z sjuewpedy Z |@A97

vb v @ z sjuswpedy € [eAe7

99 z Zz sjuswpedy p l8Ae7
‘WLOL | Wuge | Wuagz

uonejndog sjuswyedy| eaiy sasq Buipling J9A0]

g ONIGTNG

9bZ 8 9 z 12301 qns

Sr z 0 j Wed JeD y sjuawpedy PUNOIS /| [BAR]

99 z @ sjuswpedy Z [@Ae7

99 z z sjuswpedy € j@A97]

99 Zz z sjuauipedy Pp \eA07
TWLOL | Wuae | Wuaz

uoneindod sjuowyedy| ealy jasq Buipjing JeAo]

Vv ONIATINEa

ONIGIING

 

 

6.2 development summary

lO
~

uoneo|ddy yuaudojsaaq

g00c-Aenuer-62|
GA04 SJOIES 6 107

XIN LNSAINdO1SA40

Page 71

34

AiR.AUNS JUBLUCOSAGP

  
   
    
  
    

  
   

SITE SUMMARY
29/01/2008 Development Application

uperseded Planning Scheme
{IPA-ised) Proposed Scheme

Setbacks Road Frontage:

6m - 1 to 2 storeys

10m - 3 to 4 storeys
Side:

Half building height

6m Setback to Landscape Buffer
Zone

     
   
 
  

   

Non Compliant

Part of building A,
projecting 1m into setback
zone

   
  
 

  
  
      
    
 

  

Non Compliant

Part of Building B
basement and bbq pavilion,
projecting 1m into setback
zone

Building Separation Buildings seperated by 1.5m + 0.5 |Compliant
per storey 7™m
Length of Wall Walls to limited to 15m in length |Compliant

Carparking No cover parking to be located |Compliant
between frontage and build
Landscaping 6m Landscaping setback Compliant

2m to visitor parking
20% of site to be deeply planted
" _— ern |
Population Density 250persons / hectare Compliant
250 x 0.66 = 165 persons 72 Persons

  

    

  
     
    
 

       
    
        

      

    
    
  

      
   
 

Max population x 40 - not
exceeding 13,600sqm in any
building

Compliant
Max GFA = 6600
GFA - 4,400sqm

Gross Floor Area

Landscaped Open Population x 14 Compliant
Space 165 x 14 = 2,310sqm 5,000sqm

Building Height 4 Storeys, 15m max fompliant |

Carparking 1.5 cars per unit Compliant

    
  

   

       
      
   
  

   

40% Compliant
1,445 sqm or 22% of total

site area

   
        

    
   
    

    

22 Units total = 33 cars
reqd - 43 Cars provided

Page 72

io
oo

 

Page 73

Statement on intent

The Settlers Cove Lot 9 design intent is to reinforce a sense of sanctuary with relaxed leisure opportunities whilst acknowledging the sites prominent location and ecological sensitivity
close to the heart of Noosa.

A lanceolate leaf shaped pool, cascading water feature, barbeque facilities, entertaining terrace and flowing bands of various plant communities create a sense of space that is varied
in scale and form. The promotion of key vistas, pedestrian links and placement of scultural artwork establish clear points of reference. Outdoor living spaces are orientated to take
advantage of the views. solar aspect and to complement the adjoining internal spaces.

Clean lines with state of the art finishes, materials and lighting effects are intended to produce a contemporary and stimulating environment that caters for the sophisticated tastes
of patrons and residents while encouraging recreational, social and communal activities. These materials intend to complement the buildings finishes. blurring the spatial divide from
inside to out. A combination of semi- permeable screening panels, solid masonry elements, strategic changes in levels and carefully selected planting profiles will be used to control
visual connection between the public and private residential realms.

Bands of vegetation consisting of endemic plant communities define edges and emphasises connectivity to the broader context. The differing plant communities form patterns on the
landscape, mimicking the rhythms of ocean while changing through the seasons to create spatial and visual variety.

The patterns of plant communities provide a unique educational opportunity by creatively showcasing a palette of endemic Noosa flora. Contextually appropriate species have been
selected in response to the sites coastal location to fill niche roles within the landscape. A variety of trees and shrubs spatially define areas providing screening, visual interest and
shading whilst contributing to the amenity of the precinct.

Best practice ESD principles will be implemented including stormwater harvesting and the use of native plants with low water requirements. Solar and wind access will be controtled
through appropriately positioned screens. baffles, shelter elements and plantings. The use of solar heating, pool backwash collection and treatment along with energy efficient
external lighting will showcase ESD technologies.

tz

rut

Sa

a
o

JUSWE]ZIS ]UuSlul edeospuR] Z/

3

Page 74

40

t

JOUIOSId j|BuOVee.oe, Gy

 

eS ON Oa FO mM a

Building Entry

BBQ Pavilion

Entry Water Feature

Raised Feature Planting

Lobby

Lap Pool

Terraced Storm water Treatment
Storm water Harvesting

Basement Car park Ramp with Pergola

. Private Plunge Pools

. Stairs & Ramp

. Endemic Plant Community Bands

. Spa

. Pool Concourse

. Gym

. Possible future connection to adjoining

development

Page 75

Building Entry

Entry Water Feature

Raised Feature Planting

Lobby

Lap Pool

Public Walk

Basement Car park Ramp with Pergola
Stairs Access

Ramp Access

Endemic Plant Community Bands.
Pool Concourse .
Gym .

Possiblle connection to Lots 10 & 11

Public Walk .

Ooe& MN DOR WH

Gb ou uu
Oo no +

a

 

£
oa

}Ou Dod WNOBSlO} Gey

Page 76

=Pauy |e}OL

wbsooo's

 

ueid e2eds usdo ayeAud y's

 

 

 

 

 

 

 

  
 

Page 77

43

 

Page 78

 
 

Seysiul) pue sjeualeu By £

  
 

/. ®@ NN @ ; Q
COKCCOCOCOC COCO OC HOR OOOO OC ROR RAR AearadDdaR

\

Page 79

Page 80

 

sainesds pue Bunueid yoy 8

 

COCO OHO OOOO OOOO Ed. OC CLE LOO®

 

Page 81

47

 

Page 82

aay
co

saloods pup Buu spy

 

 

Each planting band is a community of Noosa endemic
plants, A planting band is made up of a grove of trees or
palms, shrubs and groundcovers that are seen in the natu-
ral environment of Noosa along with varying mulch to ac-
centuate the band. The bands are large enough to work as
revegetation but vary enough to evoke a unique character as
viewed from above in the development and provide a point
of difference from the ground,

 

Page 83

Oo
st

 

Page 84

 

 

 

 

 

 

ALIA WAS CONV TWIWwdS SIWSHO OL SNOSVSS SHI | ONOHHL SNONVHO STIHM
NVs00 30 SWHLAHe SHL ONMOINIW ‘SAVOSCNV1 SHI NG SNHALIWd WHOS SALINAAAOO INWId SNYSESIG SH

LXSILNOO dSaqVOHs SHL OL

ALINLOANNOO SASISVHdWA GNV S393 ANISSC ‘VYOT4 VSOON
DIWAGNA AO ALLA Wd V ONISVOMOHS NOLLWLSDSA JO SGNVG

 

 

 

 

 

 

 

Page 85

 

1 208 OF RSINOy

   

 

NOILVVLNSA
MO14 SSOHD

 

4.1 Corcept layout design

st
Ww

Page 86

55

ae vo opt tet et
3 (ot:

  

The topography of the site has impact on the design concept with a steep fall form north to south and strong connection with park.

te

we

The key design objectives are: S
a
1, Building to address the street and providing an entry or arrival point for visitors Q
5

2, To break the mass and built form, providing two buildings but with a strong axes and visual connection between and from fore court and arrival platform, over recreational facilites and ,
pool area. towards the park. 3
oD
@ 3. All apartments to be “ambiclextrous”, retaining views to the park but also face within north, providing solar aspect and cross flow ventilation. The apartments don’t turn their back to the ~
A . uw
community but rather acidress the streetscape and activate the edges. a
fant
@
4, The buildings step down and follow the natural topography of the site. 3
Builcling 8 is anchored through physical connection to the land with combination of “base” and “frame” ©
ae

The penthouse or “top” are skilfully introduced into top floor of the building.
Building A “cantilever” and float over the “park” with the rear connected to the ground with only a 3 storey built form facing the street

The landscape relates to the built form and is integrated within and around the architecture.

a

'
i

r
r
t
‘
im
r
1
t
'.
'
r
'
t
t
'
'
'
t
'

 

Page 87

 

    

 

  

3 4\2 wily @ y iu |
ile Ola = < O)z

t z\¢ > Qo \5 <0

u « Oo ao \|> 5 ao a

a aix a

E | os 135 <

= rw mic O
E Sle eat = ,
Ww | WwW =/a S Ww

= |O c Zz 3

[|G u s -

Lift = ”

a} - z

O a s

<
w
&
ww
O

 

56

Page 88

5/7

 

ITAIRE &

Si

 

 

Page 89

 

    

SERENITY CLOSE

 

 

aver devel grouhid Foor plan

oO
oo

Page 90

2 lover 1 # ground floor plan

ut

-
o

    

[00001755] \
g ONIATINa DS

 

Page 91

   

ONIAIING

           

3SO19 ALINAYSS

  

 

8 LOT

OS lever ? floor plan

N
Oo

Page 92

floor pian

Sod oavel 4

o
©

 

c
!
1
t
t
t

1
1
1
1
' i
I
'

t

i

t

1

{

J

J

!

t

i

i

i

1

1

1

! s /
1 /
t é
i

'

1
i
1
1
l,
ty
44

N. . / //
i) f / yee
PALE

    

3SO79 ALINAYSS

     

  

Page 93

Oo)
£

UB] LOY fF ABLE GG

     

SERENITY CLOSE

 

BUILDING A
[SSL.23.000] /

 

BUILDING B
(sskz300)

 

Page 94

ioak plan

SS

wo
ce}

   

3S0719 ALINSYAS

Page 95

 

AMVONNOG ALYIdONd , |
|
|

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| oobe J coo FT ooo Toone | nse
3 | |
= |
= } z=
= a
S =
= {= |
2 I = I
| 2
o
S

 

 

WVGLIS WSy

owe

SECTION AA |

 

f.

 

|

ARVONNOG ALYIddYd

 

 

 

 

Setback requirement for 0.5 of building height. .
ASL S08
ALLE
SSL
ASLO

8 9.7 sectons aa

Page 96

Aions bh

mee

29

 

“jybrey Buipyng yo ¢9 10) twat

—

oN
—_*

 

ABVONNOG A1UId0Ud

 

W¥8135 UO

 

8 NOIL3S

 

 

 

 

 

 

 

 

 

 

 

 

WVGL35 U9

 

 

 

ee

~ ~T wrens

~~ TT BN

Se
Sime po

2 TON - LIWIT LHOIZH YS) = =
3 3
m a
= =
4 4
= Ss =<
Qa ao
S & =
S = §
D x =
=< a =<

Page 97

o>
ao

SURIG 100], BdAY Yur eG

Rw

 
    

 
   

 

q SS BALCONY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UNIT TYPE 3A
SCALE -1:100

INTERNAL | BALCONY/S | TOTAL
3BEDROOM 190 sqm 29 sqm | 219 sqm

aH

 

 

 

 

 

 

 

 

 

i
1
1
\ vy
i
i)
1
1

 

 

 

}
t
{
1
1

|
UNIT TYPE 3C - LOWER UNIT TYPE 3¢ - UPPER
SCALE -1: 100 SC 2100

 

 

IT T
ALE -1
INTERNAL | BALCONY/S | TOTAL INTERNAL | BALCONY/S | TOTAL
1 BEDROOM 56 sqm 17 sqm | 73sqm 2BEDROOM = 150 sqm 17 sqm | 167 sqm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

UNIT TYPE 3B
SCALE -1 100
|

\ INTERNAL | BALCONY/S | TOTAL
'3 BEDROOM 192 sqm 51sqm | 243 sqm

 

| BEDROOM 1

ENS

 

 

 

 

 

 

 

 

WIR

ll BEDROOM 3 |) BEDROOM2
iy

|

\e)

UNIT TYPE 3D
SCALE -1:100
INTERNAL | BALCONY/S | TOTAL
2BEDROOM 212 sqm 33sqm | 245 sqm

  

 

 

 

 

 

 

 

 

OK?

Page 98

 

    
  

SUBIC JOO] @dAy pun ALG

 

 

 

 

 

 

 

    
 

 

 

 

 

 

 

 

 

 

 

 

 

   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

  
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

mH ry
‘se i
{
Oo / 7
u
BEDROOM 1} $4 _t
' = —+-
3 :
BAT LIVING :
ENS || 3
com! =
-n EDROOM 1
i)
QO
OO BALCONY
- ' a
1 t {
|
UNIT TYPE 2A UNIT TYPE 28 UNIT TYPE 2C
SCALE -1:100 SCALE -1:100 SCALE -1:190
INTERNAL | BALCONY/S | TOTAL INTERNAL | BALCONY/S | TOTAL INTERNAL | BALCONY/S | TOTAL
2 BEDROOM ent 20 sqm | 184 sqm 2 BEDROOM 486 sqm 41 sant 227 sqm 2 BEDROOM 132 sqm 8sqm | 140 sqm
Ae eS

oO
co

Page 99

Eve0se't

€ 199] 0'0E U

b OAg| OES LY

eVv@ose:b

 

 

 

 

g [PAB O'L EU

--- ee I<
€ 1OA9] 0'00

b Aa) O'E? I

 

 

 

you

 

elevations

and

Oo
x

Page 100

eee eoeeeeeee eee eee eee eeeeeg@eeesedswded és

NO bw N >

auminurn shutters

rendered masonary

vertical umber detail with cables
glass ba.ustrade iclear|

stone cladding

colorbond roof

tinted glass

=

west

:250@A3

east

 

1:250@A3

rl 23.0 level 4

71

SUP Ac apt

Used in these records

About this file

File size
16.7 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0175 - MCU - Multiple Dwelling (22 Units) to be assessed against the superseded planing scheme [As Published].pdf · 16.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.