Original source · versioned page text
PM Submission Object - Amir Ghavami MCU16/0153 & REC16/0041
Document Set ID: 20306830 Version: 1, Version Date: 24/04/2017 Notice of Submission under the Sustainable Planning Act 2009 To: Noosa Council: +mail@noosa,qid,gov.au Attention: Patrick Murphy, Assessment Manager Lodge by 26 April 2017 File No.; MCU16/0153 _ i ; : Postal address of Land (as advertised): 215 David Low Way, Peregian Beach Nature of Proposed Development: Material Change Of Use - Multiple housing Type 4 Conventional and Visitor _ Accommodation Type 4 Conventional 2. Submitter details MUST BE COMPLETED Date of submission: 27-7 4 /o7F = Full name of Submitter: Ax2id AA>SLOd GHA VAT Postal address: “4% Jr Aerie _ Subutb: ete ed Sft rd FL State: 20 _—_—Posteode: HFS _ Signature(s) - - (Signature is not required # lodging the Notice of Submission electronically) 3. Details of Submission _ aaa 7 | | (We), make the following submission OBJECTING to the Development Proposal MCU16/0153: 1, The proposed development is located in the Open Space Recreation Zone and does not comply with the Noosa Plan (October 2016). There are no public interest grounds to justify approval, 2. The proposed development ignores Noosa Pian requirements for low density, low impact housing and with houses priced from $725,000 to $850,000, this proposal does not provide suitably priced accommodation for the needs of the local community and conflicts with the existing and desired public amenity, open space and village lifestyle. 3. On the westem side, the development's impact on Rufous Creek and the wetland, both during construction and upon completion is of great concern, as is the planned density of housing in this ecologically sensitive zone adjacent to Noosa National Park. Some 25,000 cubic metres of imported fill will be required, giving rise to 150 truck trips per day for at least 3 months along David Low Way, down Sandpiper Court, through the IGA carpark and then back via the Heron St roundabout, 4. Greatly increased traffic and congestion is assured during construction and after completion as traffic queues currently form at all accesses to the roundabout, particularly at daily peak times and during school and public holidays. The proposed development will cause serious additional congestion that will be impossible to mitigate in the future. The proposal's Traffic Impact report mysteriously relies on outdated development approvals and the old Noosa Planning Scheme, while ignoring the traffic to and from the commercial premises (IGA, pharmacy etc). 5, The proposed development has a high density of buildings and infrastructure, with inadequate side setbacks, inadequate vegetation and shade, and is not integrated with the natural site. Additional Comments {i necessary, use separate sheet of paper and attach) To: Assessment Manager: Patrick Murphy | [email protected] | PO Box 141 Tewantin Qld 4565 As required by the Sustainable Planning Act, al’ submissions, including individual details, are published on Council's website and therefore wil be accessible fo infemet search engines. AN submissions are published, irrespective of whether or not they are properly made’
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.