Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Attachment 2 Site stability report

Attached to the e-mail MCU15/0045 Application for Detached House - IDAS forms, Planning Report, Stability Report - Email 1 of 2.

of 11

Page text shows just the words. Original shows the document exactly as it was published.

WORKING FOR YOUR PROJECTS SUCCESS




SLOPE STABILITY ASSESSMENT

Address      : Lot 17 Noosa Dunes
               Marcus Beach

Client       : R & H Carter

Date         : 19 May 2015

Report No    : 25170(S)
Log in to download the original file

Attachment 2 Site stability report.pdf · 1.1 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 10 pages

Page 2

INTRODUCTION

SCG Consulting Engineers have been commissioned to provide a Slope Stability Assessment for the above
allotment. The assessment considers only the existing state of the allotment and any possible effects that the
proposed works will have on this site.

The proposed works are detailed by Robinson Architects in plans no.1503 and consists of proposed two storey
masonry and lightweight dwelling.


SITE DESCRIPTION

A desk top study of the site confirms the following:-

    -   The site is located in an area identified as ‘Sand Dune Problem Area’ on the Noosa Shire Council’s
        Landslip Maps.

    -   Reference to the Australian Geological Map 1:100000 Gympie Special confirms the site is located within
        the Quaternary Sandbed.

Field work has been undertaken which included explorative boreholes by SCG Consulting Engineers, together
with a walkover of the site by SCG Consulting Engineers.

The borehole logs contained in SCG Consulting Engineers report, (No. 24018(S)) confirms the soil profile to
consist of the following –

                         :        LOOSE SILTY SANDS INCREASING IN DENSITY WITH DEPTH

Our walkover confirmed the following characteristics-

Site Slope               :        A visual assessment of the surface grades within the allotment using
                                  a hand held inclometer suggests grades in the order of 18% exist
                                  across the proposed construction site.

Vegetations              :        Vegetation consists of scattered trees and dense undergrowth.

Slope Shape/Location :            The surface profile across the allotments slope faces are generally
                                  LINEAR PLANAR.

Drainage                 :        The surface drainage is good, sub-surface drainage is good. There was
                                  no indication of ground water seepage or rising water pressure.

                                  Stormwater flows from upslope of the allotment will be intersected and
                                  captured by the road reserve.

Earthworks               :        There is no existing earthworks apparent.

Adjacent Structures      :        Adjacent structures on the neighbouring properties appear to be a mix of
                                  slab on ground and suspended timber framed floors.

Evidence of previous
Soil Movements       :           None apparent.


LANDSLIP MECHANISMS

Landslip is generally defined as the movement of a mass of rock or soil down a slope.

It is generally considered to occur when the strength of the soil or rock mass to support itself is exceeded
causing movement to occur within the mass.

This loss of strength can occur as a result of numerous circumstances. These include, but are not limited to the
following:-

Page 3

    -    Siesmic Activity
    -    Erosions effects such as wind or fluid scour
    -    Soil Saturation from rainfall events or defective drainage measures
    -    Construction/Earthworks activities
    -    Groundwater variations/movements
    -    Previous Landslips

The nature of landslips vary with site specific conditions and failure mechanisms that cause the slips to occur.
Appendix B provides some diagrammatic examples of various landslips.

The speed of landslips can vary greatly from millimetres per year to a number of meters in a matter of minutes.
Once again this characteristic is governed by site specific conditions and the failure mechanism causing the slip
to occur.

The allotment is situated within a massive aeolian sand bed of Quaternary age. As a general observation dunal
horizons such as these are stable where;

         -       The natural slope is less than the angle of repose for sand (30°)
         -       Vegetation exists to protect from wind generated scour
         -       The drainage pattern is such that there is no risk of fluvial scour.

These horizons can become unstable when aeolian or fluvial scour erode slopes to angles greater than 30°,
particularly when coincident with vegetation removal.


LANDSLIP HAZARD ASSESSMENT

For our assessment we utilize the Guidelines For Landslip Risk Management Framework as provided by the
Australian Geomechanics Society, in their journal of March 2007. Descriptions used by this framework can be
found appended to this report.

Using the Qualitive Risk Analysis Matrix (refer appendix) we have established the following characteristics for
the allotment.

        Landslip Mechanism                 :       Translational, Rotational or Creep Flow

We consider a potential landslip mechanism will consist of either a Rotational or Translational Landslide or
Creep movement within the sloping profile. Diagramation representation of these mechanisms are
appended to this report. We are of the opinion that this movement could occur following over excavation
or scour.

        Likelihood of Landslip             :       Likely

This is due to the evidence during our site visit which the surface grade within the allotment.

        Consequences to Property           :       Minor

With these factors considered we classify the allotment as:-

                           MODERATE RISK OF LANDSLIP

Although we consider the allotment has a moderate risk of landslip, building work undertaken on the site should
follow accepted methods which assist in maintaining slope stability.

Such measures are discussed in the following section.


HAZARD MITAGATION – CONSTRUCTION RECOMMENDATIONS

We consider the primary risks for landslip occurring within this allotment is over excavation or, stormwater scour
and vegetation removal.



SCG Consulting Engineers                                    3                            SCG Ref: 25170 (SL)

Page 4

The construction of any cut/fill platforms within the site will lead to an increased risk of landslip.

Any over excavated (steep) cuts may lead to landslip. Similarly, steep fill batters may be susceptible to slip or
erosion.

Any exposed fill batters are susceptible to weakening from saturating rains and stormwater scour. This risk is
compounded, where poor compaction is achieved when placing the fill. Any fill batter profiles should be limited
to a maximum grade of 1 to 3 (vertical to horizontal). Where possible the fill platform should be benched into the
natural profile after the removal of all organic material including topsoils.. Surface stormwater runoff should be
diverted around fill batters. Vegetating the fill batter can improve the batters ability to resist slip and or scour.
Where these recommendations are unachievable, benching, shoring or retaining measures should be
implemented.

Any permanent exposed cut batters should be limited to a maximum slope of 1 to 2.5 (vertical to horizontal). This
could be increased to a slope of 1 to 1 in the weathered rock. The face should be protected from stormwater
scour with cut off drains above the cut. Catch drains should also be provided along the base of the cut. The
drains must dissipate all stormwater from above and below the cut. Vegetating the cut batter can improve the
batters ability to resist slip and scour. Steeper batters should be retained with engineer designed retaining walls.

All excavations both temporary and permanent must be adequately battered or retained to prevent collapse.
Temporary excavations for retaining walls can have exposed cut batters of 1 to 1.7 (vertical to horizontal) taken
from the base of the excavation. These earthworks must incorporate shallow surface spoon drains at the base
and along the high side of the cut. Drains must have an efficient outflow down-slope and clear of the
construction area. Any exposed soil face should also be protected against the potential for stormwater erosion.
Saturation of the exposed cut batter from prolonged rainfall will potentially de-stabilise the cut batter.
Programming of the works must consider this possibility. Temporary backfilling of the slope may be required.
Should these recommendations be un-achievable the builder should seek guidance from this office on
temporary shoring, benching or other suitable techniques.

The allotment will support a typical form of residential construction. Structural foundations should be designed
by a competent person in accordance with AS 2870, accepted engineering theory and the geotechnical
conditions reported by this office.

All earthworks should be constructed in accordance with AS3798-1996 ‘Guidelines on earthworks for
commercial and residential developments’ and sound engineering theory.

The builder must ensure the stability of neighbouring structures is maintained through not undermining
their foundations. This is achieved via restricting any earthworks to above a line radiating downwards
at an angle of 1 in 1.2 (vertical to horizontal) from the base of the foundation/structure to be protected.

The proposed method of construction is for a blockwork dwelling supported on ground slabs. The allotment is
suitable for this form of construction, any excavations for lower floor areas must adhere to the recommendations
contained herein.

Retaining walls for landscaping purposes would need to be constructed with consideration of maintaining stability
of the surrounding ground during construction. Such measures would include limiting the slope of any
excavations to a slope of 1 vertical to 1.5 horizontal and protecting the works against stormwater scour. The
retaining wall designs must allow for the lateral soil pressures expected including additional surcharging from
sloping backfills.

Although we consider the allotment stable in its current form there will always be a risk of landslip under severe
stormwater conditions.

Measures that will reduce this risk include the following but are not limited to.

The finished ground surface should be leveled and graded to ensure no concentration of stormwater runoff
leading to ground scour can occur.

Any collected stormwater from areas other than the roof should be disposed of downslope from the proposed
dwelling and should also ensure no ground scour can occur.

All stormwater runoff from hard landscaped areas should be directed around the perimeter of the house and
contained within the site via diversion bunding, scour proof drains and field inlets.


SCG Consulting Engineers                                    4                                SCG Ref: 25170 (SL)

Page 5

All stormwater collected from roofed areas should be directed to storage tanks for re-use. Overflow from the
tanks should be disposed of via rubble soakage pits downslope of the dwelling.

No stormwater runoff should be allowed to flow over any exposed excavated embankment faces or filled batters.

Areas adjacent existing gullies must be protected against stormwater scour are susceptible to instability from
erosion effects and over saturation. With this considered, structures should not be located adjacent gullies.
Also, the area adjacent the flanks of the gullies should be protected from scour via vegetation and limiting
surface grades.

All existing cross allotment flows from neighbouring properties must also be considered, managed and
maintained. Clear unhindered drainage paths must be provided and maintained during and beyond construction.
All constructed retaining walls must have effective drainage measures upslope and beyond the walls to relieve
any sub-surface water pressure/build-up. These drains must be maintained and flushed out regularly. To
achieve this we recommend bringing the upstream end of the drain to surface and capping off to allow future
flush out.

We have attached guidelines for hillside construction extracted from Australian Geomechanics vol. 35 March
2000 – “Landslide Risk Management”. These references provide commentary on good design and building
practice.

We trust this meets with your requirements, however should you have any queries on the above matter please
contact the undersigned.

Yours sincerely




Sean Richardson RPEQ 5835
For and on behalf of
SCG CONSULTING ENGINEERS


Encs    Appendix A             -       Some Guidelines for Hillside Construction
        Appendix B             -       Landslip Mechanisms
        Appendix C             -       Landslip Risk Assessment Matrix




SCG Consulting Engineers                              5                             SCG Ref: 25170 (SL)

Page 6

APPENDICES



A.   SOME GUIDELINES FOR HILLSIDE CONSTRUCTION



B.   LANDSLIP MECHANISMS



C.   LANDSLIP RISK ASSESSMENT MATRIX

Page 7

           PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007



                 APPENDIX A - SOME GUIDELINES FOR HILLSIDE CONSTRUCTION

                        GOOD ENGINEERING PRACTICE                                                            POOR ENGINEERING PRACTICE
      ADVICE
      GEOTECHNICAL      Obtain advice from a qualified, experienced geotechnical practitioner at early       Prepare detailed plan and start site works before
      ASSESSMENT        stage of planning and before site works.                                             geotechnical advice.
      PLANNING
      SITE PLANNING     Having obtained geotechnical advice, plan the development with the risk              Plan development without regard for the Risk.
                        arising from the identified hazards and consequences in mind.
      DESIGN AND CONSTRUCTION
                        Use flexible structures which incorporate properly designed brickwork, timber        Floor plans which require extensive cutting and
                        or steel frames, timber or panel cladding.                                           filling.
       HOUSE DESIGN
                        Consider use of split levels.                                                        Movement intolerant structures.
                        Use decks for recreational areas where appropriate.
      SITE CLEARING     Retain natural vegetation wherever practicable.                                      Indiscriminately clear the site.
          ACCESS &      Satisfy requirements below for cuts, fills, retaining walls and drainage.            Excavate and fill for site access before
         DRIVEWAYS      Council specifications for grades may need to be modified.                           geotechnical advice.
                        Driveways and parking areas may need to be fully supported on piers.
      EARTHWORKS        Retain natural contours wherever possible.                                           Indiscriminatory bulk earthworks.
                        Minimise depth.                                                                      Large scale cuts and benching.
            CUTS        Support with engineered retaining walls or batter to appropriate slope.              Unsupported cuts.
                        Provide drainage measures and erosion control.                                       Ignore drainage requirements
                        Minimise height.                                                                     Loose or poorly compacted fill, which if it fails,
                        Strip vegetation and topsoil and key into natural slopes prior to filling.           may flow a considerable distance including
                        Use clean fill materials and compact to engineering standards.                       onto property below.
            FILLS       Batter to appropriate slope or support with engineered retaining wall.               Block natural drainage lines.
                        Provide surface drainage and appropriate subsurface drainage.                        Fill over existing vegetation and topsoil.
                                                                                                             Include stumps, trees, vegetation, topsoil,
                                                                                                             boulders, building rubble etc in fill.
        ROCK OUTCROPS   Remove or stabilise boulders which may have unacceptable risk.                       Disturb or undercut detached blocks or
         & BOULDERS     Support rock faces where necessary.                                                  boulders.
                        Engineer design to resist applied soil and water forces.                             Construct a structurally inadequate wall such as
                        Found on rock where practicable.                                                     sandstone flagging, brick or unreinforced
         RETAINING
                        Provide subsurface drainage within wall backfill and surface drainage on slope       blockwork.
           WALLS
                        above.                                                                               Lack of subsurface drains and weepholes.
                        Construct wall as soon as possible after cut/fill operation.
                        Found within rock where practicable.                                                 Found on topsoil, loose fill, detached boulders
                        Use rows of piers or strip footings oriented up and down slope.                      or undercut cliffs.
          FOOTINGS
                        Design for lateral creep pressures if necessary.
                        Backfill footing excavations to exclude ingress of surface water.
                        Engineer designed.
                        Support on piers to rock where practicable.
      SWIMMING POOLS    Provide with under-drainage and gravity drain outlet where practicable.
                        Design for high soil pressures which may develop on uphill side whilst there
                        may be little or no lateral support on downhill side.
         DRAINAGE
                        Provide at tops of cut and fill slopes.                                              Discharge at top of fills and cuts.
                        Discharge to street drainage or natural water courses.                               Allow water to pond on bench areas.
           SURFACE      Provide general falls to prevent blockage by siltation and incorporate silt traps.
                        Line to minimise infiltration and make flexible where possible.
                        Special structures to dissipate energy at changes of slope and/or direction.
                        Provide filter around subsurface drain.                                              Discharge roof runoff into absorption trenches.
                        Provide drain behind retaining walls.
         SUBSURFACE
                        Use flexible pipelines with access for maintenance.
                        Prevent inflow of surface water.
                        Usually requires pump-out or mains sewer systems; absorption trenches may            Discharge sullage directly onto and into slopes.
           SEPTIC &
                        be possible in some areas if risk is acceptable.                                     Use absorption trenches without consideration
           SULLAGE
                        Storage tanks should be water-tight and adequately founded.                          of landslide risk.
          EROSION       Control erosion as this may lead to instability.                                     Failure to observe earthworks and drainage
         CONTROL &      Revegetate cleared area.                                                             recommendations when landscaping.
        LANDSCAPING
      DRAWINGS AND SITE VISITS DURING CONSTRUCTION
         DRAWINGS       Building Application drawings should be viewed by geotechnical consultant
         SITE VISITS    Site Visits by consultant may be appropriate during construction/
      INSPECTION AND MAINTENANCE BY OWNER
          OWNER’S       Clean drainage systems; repair broken joints in drains and leaks in supply
       RESPONSIBILITY   pipes.
                        Where structural distress is evident see advice.
                        If seepage observed, determine causes or seek advice on consequences.




                                 Australian Geomechanics Vol 42 No 1 March 2007                                                                113
Form No. 68029 RL2 August 2010

Page 8

          PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007




    114                      Australian Geomechanics Vol 42 No 1 March 2007

Form No. 68029 RL2 August 2010

Page 9

                         APPENDIX B
PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007




          Australian Geomechanics Vol 42 No 1 March 2007

Page 10

                                      PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                                                                    APPENDIX C: LANDSLIDE RISK ASSESSMENT
                                               QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY


   QUALITATIVE MEASURES OF LIKELIHOOD

Approximate Annual Probability
                                             Implied Indicative Landslide
                                                                                                                     Description                                           Descriptor              Level
Indicative          Notional                    Recurrence Interval
  Value             Boundary
   10-1                5x10-2
                                              10 years                           The event is expected to occur over the design life.                                ALMOST CERTAIN                   A
        -2
                                                                    20 years     The event will probably occur under adverse conditions over the
   10                                       100 years
                                                                                 design life.
                                                                                                                                                                     LIKELY                           B
                            -3
        -3             5x10                                      200 years
   10                                      1000 years                            The event could occur under adverse conditions over the design life.                POSSIBLE                         C
                       5x10-4                                    2000 years
        -4                                                                       The event might occur under very adverse circumstances over the
   10                                     10,000 years
                                                                                 design life.
                                                                                                                                                                     UNLIKELY                         D
                      5x10-5                                     20,000 years
   10-5                                  100,000 years
                                                                                 The event is conceivable but only under exceptional circumstances
                                                                                                                                                                     RARE                             E
                                                                                 over the design life.
        -6             5x10-6                                    200,000 years
   10                                   1,000,000 years                          The event is inconceivable or fanciful over the design life.                        BARELY CREDIBLE                  F
   Note:     (1)   The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.


   QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY

  Approximate Cost of Damage
                                                                                               Description                                                                 Descriptor               Level
Indicative           Notional
  Value              Boundary
                                         Structure(s) completely destroyed and/or large scale damage requiring major engineering works for
  200%                                                                                                                                                              CATASTROPHIC                      1
                                         stabilisation. Could cause at least one adjacent property major consequence damage.
                     100%
                                         Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant
   60%                                                                                                                                                              MAJOR                             2
                                         stabilisation works. Could cause at least one adjacent property medium consequence damage.
                       40%
                                         Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works.
   20%                                                                                                                                                              MEDIUM                            3
                                         Could cause at least one adjacent property minor consequence damage.
                       10%
    5%                 1%                Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works.                 MINOR                             4
                                         Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a
   0.5%                                                                                                                                                             INSIGNIFICANT                     5
                                         notional boundary of 0.1%. See Risk Matrix.)
   Notes:    (2)   The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
                   unaffected structures.
             (3)   The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
                   works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
                   accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
             (4)   The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa


                                                               Australian Geomechanics Vol 42 No 1 March 2007

Page 11

                                          PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT 2007
                             APPENDIX C: – QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (CONTINUED)


      QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
                       LIKELIHOOD                                            CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
                                     Indicative Value of          1: CATASTROPHIC                   2: MAJOR                 3: MEDIUM              4: MINOR                    5:
                                    Approximate Annual                     200%                         60%                       20%                   5%              INSIGNIFICANT
                                         Probability                                                                                                                          0.5%
A   – ALMOST CERTAIN                         10-1                           VH                           VH                        VH                    H                 M or L (5)
B   - LIKELY                                 10-2                           VH                           VH                        H                     M                      L
C   - POSSIBLE                               10-3                           VH                            H                        M                     M                     VL
D   - UNLIKELY                               10-4                            H                            M                         L                     L                    VL
E   - RARE                                   10-5                            M                            L                         L                    VL                    VL
F   - BARELY CREDIBLE                        10-6                            L                           VL                        VL                    VL                    VL
      Notes: (5) For Cell A5, may be subdivided such that a consequence of less than 0.1% is Low Risk.
             (6) When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current
                 time.


      RISK LEVEL IMPLICATIONS
                          Risk Level                                                                                     Example Implications (7)
                                                                      Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
         VH                        VERY HIGH RISK                     options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
                                                                      property.
                                                                      Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
          H                            HIGH RISK
                                                                      risk to Low. Work would cost a substantial sum in relation to the value of the property.
                                                                      May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
          M                        MODERATE RISK                      implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be
                                                                      implemented as soon as practicable.
                                                                      Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
          L                            LOW RISK
                                                                      required.
         VL                        VERY LOW RISK                      Acceptable. Manage by normal slope maintenance procedures.
      Note:    (7)     The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only given as a
               general guide.




                                   Australian Geomechanics Vol 42 No 1 March 2007

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.