Part 24 of 37 Appendix 22 - Community Title Report MCU12/0208
Very large file (14.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
-
-
-
-
------~ .
, ,
-’
::r \
.
\
\
n~ I"
f)~7 \
~ l. \- -
\ Place barcode here
SI!~I ~l Il l li~[I~I I~~~iE
I’
. ,
\ 80602711
THIS IS THE NEXT PART OF A
MULTIPLE PART RECORD
PartMOf ~{
C:\Documents and Settings\eje\Desktop\Multi Part Record Cover Sheet NEXT PART
(3).doc
tiBOX’ /)~1~,1."
.
.~. R: ...
....]
---rr-’l.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 22 pages
Page 2
NOOSA ON WEYBA
Walter Hay Drive, Noosa
on weyba
Community Title Report
Prepared by
Priscilla Hyde/Michael Silver for
NORTHBROOK CORPORATION PTY
LTD.
strata managers I community experts
Page 3
Report Name: Community Title Report
Project Name: Noosa on Weyba
TABLE OF CONTENTS
1. Introduction 3
1.1 Purpose 3
2. Scheme Description 3
2.1 Location and Land Parcels 3
2.2 Description of Proposed Product Mix On Site 4
3. Overview benefits of the community title
-
4
4. Draft Structure to Community Title Noosa on Weyba 5
4.1 Community Title Scheme Layered Scheme Arrangement
-
5
Nature of Development Compliance
-
5
5. Demonstrate how a Community Title Structure will police the relevant By-laws 9
5.1 General information contained within a Community Management Statement (CMS)for Principal Scheme 9
6. Demonstrate how an overarching Principal scheme has the power to enforce conditions and
restrictions 13
6.1 Enforcement 13
7. Demonstrate how the Community Management Statement is binding on all purchasers and occupiers of
Noosa on Weyba 14
7.1 Disclosure Statements 14
8. Demonstrate how the Community Title model collects levies to fund management and conservation for
Noosa on Weyba and related areas under Council Control in relation to the Biodiversity Offset Area
(BODA) 16
8.1 Funding Management & Conservation 16
9. Definitions Used in the Report 19
10. Conclusions and comment on practical lessons for consideration from existing schemes under
management similar to the proposed Noosa on Weyba Project 20
11. Concept Master Plan Appendix "A"
-
21
12. Concept Community Title Structure Appendix "B"
-
22
strata managers I community experts
Page 2 of 22
Page 4
Report Name: Community Title Report
Project Name: Noosa on Weyba
1. Introduction
1.1 Purpose
Our firm SSKB has been engaged to provide a report regarding the community titling for the
proposed Noosa on Weyba project. We understand Northbrook will be referring our report to the
relevant Government Departments as part of your application for development approval.
This report is to address the following -
Benefits of Community Title for Noosa on Weyba.
Draft structure to Community Title Noosa on Weyba.
Demonstrate how the Community Title Structure will police the relevant By-laws.
Demonstrate how an overarching Principal scheme has the power to enforce conditions
and restrictions.
Demonstrate how the Community Management Statement is binding on all purchasers
and occupiers of Noosa on Weyba.
Demonstrate how the Community Title model collects levies to fund management and
conservation for Noosa on Weyba and related areas under Council control in relation to
the Biodiversity Offset Area (BDOA)
Conclusion and comment on practical lessons for consideration from existing schemes
under management similar to the proposed Noosa on Weyba Project.
2 Scheme description
2.1 Location and Land Parcels
The proposed scheme comprises several land parcels which are traversed by Walter Hay Drive,
Noosaville being:
Lot 7 on RP46782
Lot 2 on RP160983
Lot 1667 on M3772
Lot 2 on SP179590
Lot 53 on SP163571
Lot 11 on RP893393
Lot 12 on RP893393
strata managers I community experts
Page 3 of 22
Page 5
Report Name: Community Title Report
Project Name: Noosa on Weyba
2.2 Description of Proposed Product mix on site
Proposed buildings will encompass urban design in the following product types and styles:
Precinct A -
Resident’s Lounge
Precinct B -
Premium Residential Lots
Precinct C -
Apartment Living / Mixed use
Precinct D -
Gated Townhouses
Precinct E -
Retirement Living / Aged Care
Precinct F -
Residential Lots -
Environmental Amenity
Precinct G -
Residential Lots -
Environmental Amenity
Precinct H -
Residential Lots
Precinct H (2) Townhouses
-
Precinct I -
Residential Lots
Precinct j -
Rural Residential Lot
Precinct K -
Special Residential
Precinct L -
Retirement Living / Aged Care
Precinct M -
Parks
Precinct N -
Greenspace & BDOA Send Site
Precinct 0 Lake Buffer Zone
-
Concept Master Plan see Appendix "A"
3 Benefits of Community Title for Noosa on Weyba
Overview
There are many benefits the Noosa on Weyba project will incorporate using community titling, including:
1. Harnessing the Community spirit by providing a group of schemes as an administrative structure for
owners to meet and make decisions for the precincts and development as a whole.
2. The schemes obligations to provide a higher standard of maintenance for landscaped areas and
facilities than would be provided by the local authority.
3. The responsibility of infrastructure within the development, which will allow for:
a) management of environmentally sustainable practices eg water harvesting and recycling;
and
b) management and maintenance of identified areas of environmentally protected land.
4. The imposition of by-laws governing relationships between various precincts and, as appropriate,
architectural and landscape controls that are binding on future owners in the development.
strata managers I community experts
Page 4 of 22
Page 6
Report Name: Community Title Report
Project Name: Noosa on Weyba
4 Draft structure to Community Title Noosa on Weyba
4.1 Community Title Scheme Layered Scheme Arrangement
-
Community title is a method of providing governance for specific areas of land. It is "soft
infrastructure" that complements the physical infrastructure that is built by developers.
The governance runs with the land (as opposed to just attaching to the owner at the particular time).
The governance does more than traditional covenants. Community title governance provides flexible
management structures for people to come together to make decisions about issues that impact
upon their land and lifestyle, and it also provides the administrative systems that allow the members
of the community to implement their decisions.
It is important to note community title does NOT mean gated community.
While community title could be used for gated communities like Sanctuary Cove, Hope Island, and
Royal Pines on the Gold Coast, it may also be used for developments like Noosa on Weyba. A local
Sunshine Coast example of a successful community title scheme similar to the proposed Noosa on
Weyba site is Ridges at Peregian Springs which is an existing layered scheme, where the streets
and the private public areas will be available to the public at large and various environmental
management plans are implemented by the Principal Scheme CMS (PBC CMS).
The Layered scheme arrangement allows for a PBC CMS to be the governing document for the
entire site and stipulates the manner in which lots may be subdivided and the rules, regulations,
covenants and management plans that shall apply to those schemes. The sole purpose of the Noosa
on Weyba PBC will be to look after community areas (like the parks and gardens) and provide for
management of the development as a whole. It is the perfect system to protect any associated areas
of the development as the standards of the gardens, public areas, building design, and building
materials are set out for and to control everybody.
Refer to Annexure "B"for proposed Community Title Structure for Noosa on Weyba
Noosa on Weyba utilizing the layered scheme arrangement will use a PBC CMS to enshrine the
management commitments on the site with particular focus on koalas and wildlife. The Principal
scheme proposed will be similar to Ridges Peregian Springs CTS 39713 which will enshrine and
obligate all Assessing Authority requirements as detailed in the CMS Schedule Band C provisions
registered at the DNR being as follows:
NA TURE OF DEVELOPMENT
Compliance
All development of the CTS and any Subsidiary Schemes must (whether by the actions of
the Original Owner or any other person or entity):
(a) comply with all laws (including by reason of any relevant orders issued from any court
having jurisdiction);
strata managers I community experts
Page 5 of 22
Page 7
Report Name: Community Title Report
Project Name: Noosa on Weyba
(b) comply with all requirements of any authority having jurisdiction including without limitation
the Local Government (including without limitation all approvals issued under the Into
grated Planning Act (Qld 1997));
(c) comply with the orders of the Planning and Environment Court (Maroochydore) in the
mailer of 802703 of 2005 to which the Original Owner was a co-respondent including
without limitation the order of Judge Dodds DCJ of 16 December 2005;
(d) comply with the provisions contained in the Coolum Ridges Master Planned Community
Master Plan and Maroochy Plan 2000, Maroochy Plan 2000 Planning Scheme Codes and
Policies, and the Coolum Ridges Koala Sensitive Urban Development Code (as is
applicable); and
(e) take into account the plans and statements (as are current from time to time) provided to
the Original Owner including without limitation:
(1) environmental management plans;
(2) engineering management plan;
(3) fauna management plan;
(4) vegetation management and retention plan;
(5) landscaping management plan; and/or
(6) acoustic plans.
The PSC CMS governs all lots within the site and in particular to the extent that any lot or subsidiary
scheme may not be consistent with the PSC CMS, the PSC CMS will prevail as per the Body
Corporate and Management Act 1997 Section 58 which states:
58 Community management statement for higher scheme prevails
(1) If a community titles scheme (schemeA) is a subsidiary scheme, scheme A’s
community management statement (other than the unaffected provisions) has effect
subject to the community management statement for each community titles scheme
for which scheme A is a subsidiary scheme.
(2) In subsection (1)-unaffectedprovisions means-
(a) the lot entitlement schedules in scheme A’s community management
statement; and
(b) the provisions of scheme A’s community management statement prescribed
under a regulation applying to scheme A.
Example- The community management statement for the principal scheme in a layered
arrangement of community titles schemes prevails over the provisions (other than the lot entitlement
schedules and the provisions prescribed under subsection (2)(b)) of the community management
statement for each other community titles scheme forming part of the layered arrangement..
The relevant planning authority must endorse each CMS under Section 60 of the Body Corporate
and Community Management Act. The endorsement process is an assurance that all provisions of
the Development Approval obligations, management plans or operational requirements under the
approval are enshrined in the prevailing PSC CMS. The further endorsement process for any new
CMS after the First CMS is approved ensures the CMS provisions do not change.
strata managers I community experts
Page 6 of 22
Page 8
Report Name: Community Title Report
Project Name: Noosa on Weyba
60 Community management statement notation
(1) Subject to subsection (6), a community management statement proposed to be
recorded for a community titles scheme may be recorded only if each relevant
planning body for the scheme has endorsed on the statement a certificate (a
community management statement notation).
(2) In a community management statement notation a relevant planning body for a
community titles scheme states only that
it has noted the community management statement.
(3) Subject to subsection (4), a relevant planning body must endorse a community
management statement notation on the proposed community management statement.
(4) For a community titles scheme intended to be developed progressively, a relevant
planning body for the scheme is not required to endorse a community management
statement notation on the proposed community management statement if there is an
inconsistency between a provision of the statement and-
(a) if the relevant planning body is a local government-a lawful requirement of,
or an approval given by, the local government under the Sustainable
Planning Act 2009; or
(b) if the relevant planning body is the urban land development authority-a
lawful requirement of, or an approval given by-
(i) a local government under the Sustainable Planning Act 2009; or
(ii) the urban land development authority under the Urban Land
Development Authority Act 2007; or
(c) the planning instrument of the relevant planning body; or
(d) a lawful requirement of, or an approval given by, the relevant planning body
under the planning instrument of the relevant planning body.
Example for subsection (4)- A relevant planning body that is a local government
would be expected to refuse to endorse a proposed community management
statement with a community management statement notation if the statement
envisages development ofpart of the scheme land in a way prohibited under its
planning instrument. However, the relevant planning body would be expected to
endorse the proposed statement with a community management statement notation if
the proposed community management statement acknowledges that development of
the part of the land in the way proposed will proceed only if and when a suitable
amendment of the planning instrument is made.
(5) For subsection (4), a provision of the statement is not inconsistent with a planning
instrument only because-
(a) the planning instrument allows a person to do an act or engage in an activity
in the area in which the community titles scheme is established; and
(b) the provision requires the person to obtain the body corporate’s permission
before doing the act or engaging in the activity on scheme land.
(6) Despite subsection (1), a new community management statement may be recorded
without the endorsement on it of any community management statement notation that
is otherwise required if-
(a) there is no difference between the existing statement for the scheme and the
new statement for any issue that a relevant planning body for the scheme
Example for paragraph (a)- The new statement includes an interest schedule that is
different from the interest schedule included in the existing statement, but there is
otherwise no difference between the 2 statements.
strata managers I community experts
Page 7 of 22
Page 9
Report Name: Community Title Report
Project Name: Noosa on Weyba
(b)any difference between the statements is limited to changes to reflect-
(i) a lot entitlement adjustment agreed to under section 50; or
(ii) a formal acquisition affecting the scheme; or
(iii) a change in a services location diagram for the scheme; or
(iv) the incorporation of a lot with common property, or conversion of
lessee common property to a lot, under section 40.
(7) If a relevant planning body for the scheme does not endorse a community
management statement notation within 40 days after the community management
statement is submitted for endorsement under this section, or refuses to endorse the
notation-
(a) the person who submitted the community management statement for
endorsement of the notation may appeal to the Planning and Environment
Court under the Sustainable Planning Act 2009; and
(b) the court is required to hear and decide the appeal.
(8) For an appeal under subsection (7)-
(a) the relevant planning body is the respondent; and
(b) the Sustainable Planning Act 2009, chapter 7, part 1, divisions 11 to 13
apply, with necessary changes, as if-
(i) the appeal were an appeal mentioned in the divisions; and
(ii) the relevant planning body were the only other party to the appeal;
and
(c) the appellant must give the relevant planning body the written notice of the
appeal under the divisions within 10 business days after starting the appeal.
(9) In this section- planning instrument, of a relevant planning body, means-
(a) if the body is a local government-
(i) its planning scheme under the Sustainable Planning Act 2009; or
(ii) an instrument of the local government having effect as if it were a
planning scheme of the local government; or
(b) if the body is the urban land development authority-an interim land use plan
or development scheme under the Urban Land Development Authority Act
2007.
relevant planning body, for a community titles scheme, means-
(a) to the extent scheme land is or is proposed to be located in an urban
development area-the urban land development authority; and
(b) to the extent scheme land is or is proposed to be located in a local
government area but not in an urban development area-the local
government for the local government area.
Subsidiary Scheme Precincts under the Noosa on Weyba Principal Scheme
Subsidiary schemes will comprise a proposed mix of Standard Format Plans and Building Format Plans
all registered with their own individual CMS which cannot be inconsistent with the provisions of the
overarching Noosa on Weyba PBC CMS. If there are different proposed Design Guidelines which can
be facilitated without conflict with the Principal Scheme guidelines they can also be adopted for each
subsidiary to ensure compliance that may only be relevant to that precinct. The PBC CMS can include
provisions that obligate each subsidiary scheme to include reference to the PBC CMS and any relevant
obligations it must acknowledge and adhere to.
strata managers I community experts
Page 8 of 22
Page 10
Report Name: Community Title Report
Project Name: Noosa on Weyba
Standard Format Plans
The lots for various residential subsidiary schemes may be subdivided to create a second level of bodies
corporate. Where lots are subdivided into attached or detached dwellings generally standard format
plans will be used to create this second level.
These Standard Format Plan Subdivisions would include traditional allotments. Several different housing
types may be grouped into subsidiaries depending on proximity and shared use of common property
such as access roadways and driveways.
Buildings Format Plans
The Apartments would typically be subdivided by building format plans. As such the respective bodies
corporate will be responsible for all maintenance of the external building structure of lots in each
scheme. In this way the consistency of maintenance and amenity is maintained in the long term.
Each of these localised subsidiary schemes will be responsible for the maintenance of the common
property of their own scheme. The CMS for these types of subsidiary scheme would contain relevant
provisions to protect the amenity of the scheme including negative obligations not to do things that would
detract from the outward appearance in light of the apartment’s scheme proximity to the public spaces.
The common property for each subsidiary scheme will consist of areas such as -
The entry statement for that scheme if any
-
Any access roadways and driveways used only by that scheme, such as in the townhouses
The utility service infrastructure, which is by definition the responsibility of that scheme.
In the case of the apartments scheme [building format plan] foyers, external building facade,
pools etc
5 Demonstrate how the Community Title Structure will police
the relevant By-laws.
5.1 General information contained within a Community Management Statement
(CMS)for Principal Scheme
The PBC CMS is the governing document for the entire scheme and stipulates the manner in which
lots may be subdivided and the rules and regulations that shall apply to those schemes. The PBC
will collect funds to deliver the requirements under the CMS provisions with personnel such as on
site managers, contractors or specialist consultants to implement previous mentioned such
provisions.
The Noosa on Weyba proposed Principal CMS typically will contain the following inclusions -
Schedule A -
schedule of entitlements
Schedule B explanation of the development
-
Schedule C By-Laws
-
Schedule D Any other details required to be recorded, such as environmental protection
-
initiatives
Schedule E -
Description of lots allocated exclusive use areas of common property (if
applicable).
strata managers I community experts
Page 9 of 22
Page 11
Report Name: Community Title Report
Project Name: Noosa on Weyba
Schedule A -
schedule of entitlements
Section 46 (BCCM Act 1997) which sets out the application of the contribution schedule and
interest schedule entitlements. The Act states that a principle of Equality or Relativity must be
identified and all lots contribution entitlements must provide information as to the underlying
basis on how the entitlements were calculated using either Principle. For interest entitlements
the Act states that the market value principle must be used, unless circumstances require
another just and equitable method to be used.
Schedule B -
explanation of the development
This schedule should be completed in accordance with Section 57(3) and (7) (BCCM Act
1997;) Each plan or other instrument lodged relating to the scheme land shall be in
accordance with the provisions set out in this schedule.
This schedule sets out the future development of the scheme. For example how many stages it
will be developed over and the likely yield in terms of lots. It also sets out how entitlements in
future stages will be calculated in accordance with use and impact upon common property.
Schedule C -
By-Laws
The purpose of the By-Laws is to set out permitted use and behaviour on common property and
also conduct within individual lots.
The Body Corporate is obligated under Section 94 of the Body Corporate and Community
Management Act to enforce the Community management Statement which includes the by-
laws contained therein as detailed below:
94 Body corporate’s general functions
(1) The body corporate for a community titles scheme must-
(a) administer the common property and body corporate assets for the benefit of
the owners of the lots included in the scheme; and
(b) enforce the community management statement (including enforcing any by-
laws for the scheme in the way provided under this Act); and
(c) carry out the other functions given to the body corporate under this Act and
the community management statement.
For a scheme such as Noosa Weyba the by-laws would typically contain any Assessing
on
Authority requirements plus the following provisions:
1. Interpretation -
covers meaning of words, rules of interpretation
2. Noise and obstruction- behavior of invitees
3. Behaviour of invitees.
4. Maintenance of lots.
5. Protection of Common Property -
Gardens and plants, Roadways particularly vehicular
speeds within Noosa on Weyba, Structures, Rubbish management, Damage to Common
Property
strata managers I community experts
Page 10 of 22
Page 12
Report Name: Community Title Report
Project Name: Noosa on Weyba
6. Any special requirements for plants and gardens (Flora and Fauna Management Plans)
7. Any requirements for approval of structural alterations
8. Requirements for rubbish disposal
9. Any restrictions on the use of the lots or the Community Property Display Site, Parking,
-
maintenance of Lots, Flammable liquids, Animals in particular dogs and cats to minimize
potential harm to native fauna and koalas, Use of facilities, notice of damage, Vehicles,
parking and driving, Visitor parking
10. Limitations on parking and vehicle access.
11. Security including access to the Community Property through any development gates.
12. Any exclusive use areas that might be granted.
13. Special privileges to a resident manager.
14. Restrictions on the keeping of animals and interactions with Koalas
15. Restrictions regarding vermin and infectious diseases.
16. Cost recovery by-laws
17. Management of the Residents Lounge Areas & facilities.
18. Management of the Environmentally Protected Areas
19. Any other special matters particular to your development, such as certain conditions
which may be within your development approval.
20. Conduct on Parcel- obstruction, Noise, Behaviour of visitors
21. Ability of the original owner to enter into proposed agreement such as with the local
authority to maintain areas not common property or alternatively adopt a fee for
contribution to the facility.
22. Miscellaneous
Other By-laws would outline the management and obligations in relation to the issues that the body corporate has
control over. Items such as management of aspects of the fire control zones, conservation zones, water sensitive
urban design such as swales and gross pollutant traps may be set out in the by-laws. Other strategies to allow
the local authority to receive a contribution for areas outside the scheme could be a proposed. Easements to
obligate the scheme to contribute towards koala fencing outside the scheme along Walter Hay Drive.
Schedule 0 -
Any other details required to be recorded
Many of the ideals and visions of the Scheme together with the means by which they are
delivered are set out in this schedule.
Typically the schedule can contain the following items:
Architectural and Landscape Code and ESD initiatives
In a traditional land subdivision, design requirements for the structures to be built on the lots would
be in the contract of sale only. They would bind the immediate purchasers but would not run with the
land to bind future owners. In a Community Title Scheme these covenants which deal with long term
landscaping and architectural guidelines as part of the by-laws in the CMS.
concerns are included as
These will bebinding on the original owners whom may sell to and any future owners. The
Community Scheme will always be able to enforce the covenants against all owners.
strata managers I community experts
Page 11 of22
Page 13
Report Name: Community Title Report
Project Name: Noosa on Weyba
A Code encourages developments that will enhance the total amenity and character of the scheme
and ensures development in tune with the intent of the code. The means by which this is achieved is
via the establishment of the architectural and landscaping review committee. The committee can be
constituted by representatives of the developer who may include a panel of experts usually
comprising architects, horticulturists etc with knowledge of the master planning of the scheme.
The code sets out the operation of the committee and includes items such as
1. Establishment of the ARC
2. Meetings of the ARC
3. Consultants to the ARC
The code includes a summary of the Aim, Intent and Standards Explanation and goes into detail on
the means by which these standards are met and gives practical examples utilising diagrams to
explain the implementation.
The code would provide an outline of the operation of the various ESD initiatives that may be
incorporated into each lot that is developed. For example items such as koala fencing and rain water
collection and harvesting. The implementation and on-going management of which would require
intervention by the body corporate.
An example where management plans/initiatives are enshrined within the CMS is the Viridian
Noosa project where in Schedule D goes on to adopt the Architectural and Landscaping codes plus
restrict any changes to the CMS/Code without the Assessing Authority approval with the section
below:
Amendments to Code
Each owner and the Body Corporate acknowledge that: -
(a) a change to this Architectural Design and Landscaping Code is an issue, within the
meaning of section 60(6)(a) of the Act, that the Assessing Authority could have regard
to for identifying an inconsistency referred to section 60(4) of the Act: and
(b) no new Community management Statement which purports to amend the Architectural
Design and Landscaping Code will be approved or executed by the Boyd Corporate
without first obtaining the prior written consent of the Assessing Authority.
The local authority must endorse each CMS under Section 60 of the Body Corporate and Community
Management Act to comply with lodgement at the Department of Natural Resources as follows:
60 Community management statement notation
(1) Subject to subsection (6), a community management statement proposed to be
recorded for a community titles scheme may be recorded only if each relevant
planning body for the scheme has endorsed on the statement a certificate (a
community management statement notation).
(2) In a community management statement notation a relevant planning body for a
community titles scheme states only that it has noted the community management
statement.
strata managers I community experts
Page 12 of 22
Page 14
Report Name: Community Title Report
Project Name: Noosa on Weyba
(3) Subject to subsection (4), a relevant planning body must endorse a community
management statement notation on the proposed community management statement.
Schedule E -
Description of lots allocated exclusive use areas of common property (if applicable).
This Schedule shall be in addition to the by-laws under which exclusive use is allocated. It shall
identify the lots affected and include the relevant sketch plans required. Unless principal common
property areas are designated for the exclusive use of a particular scheme this schedule is not likely
to have use for the principal body corporate but would be utilised for a subsidiary scheme CMS
typically in a unit development (Building format plan) for the allocation of car spaces in a basement
car park.
6 Demonstrate how an overarching Principal scheme has the
power to enforce conditions and restrictions.
6.1 Enforcement
The PBC CMS and inclusions therein are binding on the Body Corporate, members of each Body
Corporate (lot owners) and any occupiers within the Scheme or subsidiary schemes. Section 59
outlines the provisions and the binding nature of them:
59 Taking effect of community management statement
(1) A community management statement takes effect under the Land Title Act, section
115L(3).
(2) The community management statement for a community titles scheme is binding on-
(a) the body corporate; and
(b) each member of the body corporate; and
(c) to the extent that paragraphs (a)and (b)do not apply to bind a person-
(i) each person who is a registered proprietor of a lot included in the
scheme; and
(ii) each person who is a registered proprietor of common property; and
(d) to the extent that paragraphs (b)and (c)do not apply to bind a person-
(i) each person who is the occupier of a lot included in the scheme;
and
(ii) each person who is an occupier of common property.
(3) Subsection (2)has effect as if-
(a) the community management statement included mutual covenants to
observe its provisions entered into by each person bound by it; and
(b) each person bound had signed the community management statement under
seal.
The binding provision with Section 59 together with Section 94 for the Body Corporate to
enforce by-laws allows the ability to enforce the restrictions and conditions that are applied by
the Assessing Authority and any provisions the original owner in consultation with the legal
representatives and strata consultant implement under the PBC CMS.
strata managers I community experts
Page 13 of 22
Page 15
Report Name: Community Title Report
Project Name: Noosa on Weyba
7 Demonstrate how the Community Management Statement is
binding on all purchasers and occupiers of Noosa on Weyba.
7.1 Disclosure Statements
In addition to the on title registered CMS which is noted on any lot title search at the Department of
Natural Resources, sellers are required under Section 213 of the Body Corporate and Community
Management Act to give a disclosure statement to cover the following provisions. Note there is
legislation amendments currently in draft bill which will remove the current obligation for the Seller to
provide a copy of the CMS
The previous position in the legislation will be reinstated removing this obligation, however
any reasonable purchasers lawyer will require a copy of the relevant CMS anyway..
Records for each Community Title Scheme are available for searching either at the
residence of the Secretary or where a Body Corporate Manager is engaged their offices:
213 Information to be given by seller to buyer
(1) Before a contract (the contract) is entered into by a person
(the seller) with another person (the buyer) for the sale to the
buyer of a lot (the proposed lot) intended to come into
existence as a lot included in a community titles scheme when
the scheme is established or changed, the seller must give the
buyer a disclosure statement.
(2) The disclosure statement-
(a) must state-
(i) the amount of annual contributions reasonably
expected to be payable to the body corporate by the
owner of the proposed lot; and
(ii) the extent to which the amount mentioned in
subparagraph (i) is based on the contribution
schedule lot entitlements for the lots included in
the scheme; and
(iii) the extent to which the amount mentioned in
subparagraph (i) is based on the interest schedule
lot entitlements for the lots included in the scheme;
and
(iv) that the contribution schedule lot entitlements, and
interest schedule lot entitlements, for the lots
included in the scheme are set out in the proposed
community management statement for the scheme;
and
(b) must include, for any engagement of a person as a body
corporate manager or service contractor for the scheme
proposed to be entered into after the establishment of
the scheme, or proposed to be continued or entered into
after the scheme is changed-
strata managers I community experts
Page 14 of 22
Page 16
Report Name: Community Title Report
Project Name: Noosa on Weyba
(i) the terms of the engagement, other than any
provisions of the code of conduct that are taken to
be included in the terms under section 118; and
(H) the estimated cost of the engagement to the body
corporate; and
(Hi) the proporlion of the cost to be borne by the owner
of the proposed lot; and
(c) must include, for any authorisation of a person as a
letting agent for the scheme proposed to be given after
the establishment of the scheme, or proposed to be
continued or given after the scheme is changed, the
terms of the authorisation; and
(d) must include details of all body corporate assets
proposed to be acquired by the body corporate after the
establishment or change of the scheme; and
(e) must be accompanied by-
(i) the proposed community management statement;
and
(H) if the scheme to be established or changed is
proposed to be established as a subsidiary
scheme-the existing or proposed community
management statement of each scheme of which
the proposed subsidiary scheme is proposed to be a
subsidiary; and
(f) must identify the regulation module proposed to apply
to the scheme; and
(g) must include other matters prescribed under the
regulation module applying to the scheme.
(3) The disclosure statement must be signed by the seller or a
person authorised by the seller.
(4) The disclosure statement must be substantially complete.
(5) If the proposed lot the subject of the contract is not residential
properly, the seller must have an information sheet in the
approved form attached to the contract when the contract is
given to the buyer.
(5A) A form may be approved under section 320 for an information
sheet for a proposed lot that is residential properly.
Note- See the Property Agents and Motor Dealers Act 2000, section 364,definition
information sheet.
(6) If the contract has not already been settled, the buyer may
terminate the contract if-
(a) the seller has not complied with subsection (1); or
(b) the lot the subject of the contract is not residential
properly and the seller has not complied with subsection
strata managers I community experts
Page 15 of 22
Page 17
Report Name: Community Title Report
Project Name: Noosa on Weyba
(5).
(7) The seller does not fail to comply with subsection (1)merely
because the disclosure statement, although substantially
complete as at the day the contract is entered into, contains
inaccuracies.
8 Demonstrate how the Community Title model collects levies
to fund management and conservation for Noosa on Weyba
and related areas under Council control in relation to the
Biodiversity Offset Area (BDOA)
8.1 Funding Management and Conservation
A community title scheme must adopt both an Administration and a Sinking Fund Budget for
expenditure at the annual general meeting each year. The inclusions within each fund function
differently.
The Noosa on Weyba administration fund is expected to cover reasonable expenditure for the cost of
maintaining common property, body corporate assets and insurance. The budget for the first 12
months is prepared for the original owner and would include any day to day costs associated with
common property, management plans or DA obligations which be generated.
The Noosa on Weyba Sinking Fund is expected to fund items of a capital or non-recurrent nature.
When preparing the first 12 month budget for the scheme a Quantity Surveyor is engaged by the
original owner to prepare the Sinking Fund Report which includes any costs associated with common
property, management plans or DA obligations which generate a cost.
The implications for Noosa on Weyba under a Community Title Scheme structure immediately
obligates both a Principal scheme and any subsidiary scheme to adopt both Administration and
Sinking Fund which can include funding for but not limited to the following:
Funding of Koala habitat enhancement and restoration within Noosa on Weyba
Funding the maintenance of koala fencing within Noosa on Weyba
Contribution towards maintaining koala fencing under Council control (along Walter Hay Drive),
the scheme would require an additional obligation such as an easement with Councilor an
agreement to specify the terms of such contribution. The original owner would have powers to
enter into such agreement under the CMS at the first meeting of the scheme or within the first 12
months under the relevant power of attorneys.
The relevant legislation sections which enshrine the above in community title schemes are as
follows:
strata managers I community experts
Page 16 of 22
Page 18
Report Name: Community Title Report
Project Name: Noosa on Weyba
BCCMA 1997 (Standard Module) Regulation Section 146 Administrative and Sinking
funds
(1) The body corporate must establish and keep an administrative fund and a sinking
fund.
(2) The body corporate must pay into its administrative fund any amount received by the
body corporate that is not required under subsection (3) to be paid into its sinking
fund.
(3) The body corporate must pay into its sinking fund -
(a) the amount raised by way of contribution to cover anticipated spending of a
capital or non-recurrent nature (including the periodic renewal or
replacement of major items of a capital nature and other spending that
should be reasonably met from capital); and
(b) amounts received under policies of insurance for destruction of items of a
major capital nature; and
(c) interest from investment of the sinking fund.
BCCMA 1997 (Standard Module) Regulation Section 148 Application of administrative
and sinking funds
(1) The sinking fund may be applied towards-
(a) spending of a capital or non-recurrent nature; and
(b) the periodic replacement of major items of a capital nature; and
(c) other spending that should reasonably be met from capital.
BCCMA 1997 (Standard Module) Regulation Section 139 Budgets
(1) The body corporate must, by ordinary resolution, adopt 2 budgets for each financial
year-
the administrative fund budget
the sinking fund budget.
Note- See section 146 (Administrative and sinking funds).
(2) The administrative fund budget must-
(a) contain estimates for the financial year of necessary and reasonable
spending from the administrative fund to cover-
(i) the cost of maintaining common property and body corporate
assets; and
(ii) the cost of insurance; and
(3) The sinking fund budget must-
(a) allow for raising a reasonable capital amount both to provide for necessary
and reasonable spending from the sinking fund for the financial year, and
also to reserve an appropriate proportional share of amounts necessary to
be accumulated to meet anticipated major expenditure over at least the next
9years after the financial year, having regard t~
(i) anticipated expenditure of a capital or non-recurrent nature; and
(ii) the periodic replacement of items of a major capital nature; and
(iii) other expenditure that should reasonably be met from capital; and
(b) fix the amount to be raised by way of contribution to cover the capital amount
mentioned in paragraph (a).
strata managers I community experts
Page 17 of 22
Page 19
Report Name: Community Title Report
Project Name: Noosa on Weyba
(4) If the community titles scheme is a lot included in another community titles scheme,
the administrative fund budget must also include an estimate of the total amount
the body corporate may reasonably be expected to be required to contribute to the
administrative and sinking funds for the other scheme, and any other fund provided for
in the regulation module applying to the other scheme.
(5) The original owner must prepare proposed budgets for adoption by the body corporate
at its first annual general meeting, and the committee must prepare proposed
budgets for adoption by the body corporate at each later annual general meeting.
(6) Copies of the proposed budgets must accompany the notice of an annual general
meeting.
(7) To remove any doubt, it is declared that the inclusion of an item of expenditure in a
budget adopted by the body corporate is not, of itself, authority for the expenditure.
Documents to be provided by the Original Owner include the Sinking Fund
BCCMA 1997 (Standard Module) Regulation Section 79 Documents and materials to be
handed over to body corporate at first annual general meeting
(1) At the first annual general meeting, the original owner must give the following to the
body corporate-
(a) a register of assets containing an inventory of all body corporate assets;
(b) all plans, specifications, diagrams and drawings of buildings and
improvements forming part of scheme land (as built) showing water pipes,
electrical wiring, drainage, ventilation ducts, air conditioning systems and
other utility infrastructure;
(c) all policies of insurance taken out by the original owner for the body
corporate;
(d) an independent valuation for each building the body corporate must insure
under chapter 8, part 9;
(e) documents in the original owner’s possession or control relevant to the
community titles scheme, including, for example, the body corporate’s roll,
books of account, meeting minutes, registers, any body corporate manager
or service contractor engagement or letting agent authorisation,
correspondence and tender documentation;
m the body corporate’s seal;
(g) documents in the original owner’s possession or control relevant to the
buildings or improvements on scheme land, not including certificates of title
for individual lots or documents evidencing rights or obligations of the original
owner that are not capable of being used for the benefit of the body corporate
or an owner (other than an owner who is the original owner) of a lot, but
including-
(i) contracts for building work, or other work of a developmental nature,
carried out on scheme land; and
(ii) certificates of classification for buildings and fire safety certificates;
(h) administrative and sinking fund budgets showing the body corporate’s
estimated spending for the first financial year;
strata managers I community experts
Page 18 of 22
Page 20
Report Name: Community Title Report
Project Name: Noosa on Weyba
(i) a detailed and comprehensive estimate of the body corporate’s
sinking fund expenditure for the scheme’s first 10 financial years
that must include an estimate for the repainting of common property
and of buildings that are body corporate assets.
BCCMA 1997 Section 13 Meaning of original owner
(1) The original owner for a community titles scheme means each person who,
immediately before the establishment of the scheme, is a registered owner of a lot
that, on establishment of the scheme, becomes scheme land.
(2) If, immediately before the establishment of the scheme, land that becomes scheme
land is in the possession of a person acting under the authority of a mortgage or an
order of a court, the original owner includes the person acting under the authority
9 Definitions Used in This Report
Term Meaning
BCCMA the Body Corporate and Community Management Act 1997 (Old)
Body Corporate the body corporate for Noosa on Weyba
CMS community management statement
Scheme the community titles scheme for Noosa on Weyba CTS number
Lot A part of the scheme that is allocated for separate occupation or a
distinct parcel of land created on-
(a)the registration of a plan of subdivision; or
(b)the recording of particulars of an instrument.
Contribution Proportion lot entitlement that each owner is allocated under the
Schedule Lot Community Management Statement. Used to calculate Administration
Entitlement Fund Levies and Sinking Fund Levies. Based on each individual lot
burden on common property
Contribution Proportion interest entitlement that each owner is allocated under the
Schedule Interest Community Management Statement. Used to calculate any
Entitlement Administration (Insurance)levies related to building cover only. Based
on value.
strata managers I community experts
Page 19 of 22
Page 21
Report Name: Community Title Report
Project Name: Noosa on Weyba
10 Conclusion and comment on practical lessons for
consideration from existing schemes under management
similar to the proposed Noosa on Weyba Project.
Based on the current consulting plans to implement and deliver Noosa on Weyba as a Community Title
Scheme there will be substantial sustainable outcomes for the Assessing Authority, Local Authority,
owners and occupiers of the scheme to live in an environment that will provide the governance and
financial system to ensure the vision created continues in perpetuity. Both Viridian Noosa and Ridges
Peregian Springs have proven to be sustainable community title structures to facilitate the specialized
management of both these sensitive sites.
Yours faithfully,
STEWART SILVER KING AND BURNS PTY LTD
<=:2~
Priscilla Hyde
Development Division Manager / Consultant
Direct 07 55042013
Mobile 0439744439
Email [email protected]
strata managers I community experts
Page 20 of 22
Page 22
Report Name: Community Title Report
Project Name: Noosa on Weyba
11 Concept Master Plan
Appendix "A" -
CONCEPT MASTER PLAN
r -,
-~r.t:
-......,.
.......- .........- .......
.. --
........1.... ,
fih....ft............. .
’-’W’PIIt.-tJ_u-. ~
i!fI=:,.,._......._~..... ’"
iI.Ua.- In
~~t....1:.- ’" . ..
~--.t’-’~a--t.....’-:IIIp .. . .
"--.oI~,~~ . ..
. .
.
--... ""
Ibf......,~ W
~-,.....,.. ’..
i 61__L-..I...,.n.. ...
...
I ~-~~ "’~
J. 1.’tIft.t.. II.
/
,~
....._i~.h
....&uioo_1-.
.-
.,..
NOOSA ON I’ YBA
.STRUCTURE PUN NOR~.ROa.~ CORP PTY lroANO 1& K!-fOF"’A~N noosa-W
Weyba:
on _
.
DaIiIJI
:or.!:. ~t,,;’~.....,_\---t...:I ~..,~.., ~~IMl’J_ ~.\4O’lIl"’lK .....-.;tI’MII "’".,q’, ~1~..r_I""’"
=c::l.o._.....___.._
strata managers I community experts
Page 21 of 22
Page 23
Report Name: Community Title Report
Project Name: Noosa on Weyba
12 Concept Community Title Structure
Appendix "B" Showing approximate dwelling numbers.
-
l ~Mi]Qml~lfiiiit!iGlill~ ,I
rl Precinct B
Subscheme H .Premium Residential Lots
.73 proposed dwellings
H Precinct C
Subscheme H .Apartment living/Mixed Use
.50 proposed dwellings
H Precinct D
Subscheme H .Gated Townhouses
.83 proposed dwellings
PrecinctE
Englobo Lot
t--- Retirement Living
Aged Care
120 Proposed Dwellings
Common Property for
PBC Scheme
.Residential Lots
Precinct F
r-- r-- ’Environmental amenity
May Include the Subscheme
’40 proposed dwellings
following:
.Resident’s Lounge ’Residential Lots
Precinct G
.Common landscaping r-- r-- ’Environmental amenity
Subscheme
.Pedestrian pathways ’124 proposed dwellings
.Parks
.Greenspace
.Lake Buffer Zone
.Roadways
H Precinct H
Subscheme H ’Residential Lots
’52 proposed dwellings
H Precinct H2
Subscheme H ’Townhouses
’24 proposed dwellings
rl Precinct I
Subscheme H ’Residential Lots
’203 proposed dwellings
Precinct J
r--
Englobo Lot
Rural Residential Lot
1 Proposed Dwelling
Precinct K .Special Residential
t----i 1--1
Subscheme ’6 proposed dwellings
Precinct L
Englobo Lot
’---
Retirement Living
Aged Care
100 Proposed Dwellings
strata managers I community experts
Page 22 of 22
Used in these records
Part 24 of 37 Appendix 22 - Community Title Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 14.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.