Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

Part 24 of 37 Appendix 22 - Community Title Report MCU12/0208

of 23

Text shows just the words. Original shows the document exactly as it was published.

Very large file (14.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

     -
             -
                 -
                          -


                              ------~    .

                              ,      ,



                                     -’
                                          ::r      \
                 .

                                                    \
                                                       \
             n~      I"
                              f)~7                     \
         ~   l. \- -


                                                        \             Place barcode here
                                                                                                                  SI!~I ~l Il l li~[I~I I~~~iE
I’
                          .   ,
                                                        \                                                                          80602711


                                     THIS IS THE NEXT PART OF A
                          MULTIPLE PART RECORD

                                                            PartMOf ~{


                                         C:\Documents and Settings\eje\Desktop\Multi Part Record Cover Sheet NEXT PART
                                                                                                                         (3).doc




                                                           tiBOX’ /)~1~,1."
                                                              .
                                                                  .~.                R:   ...
                                                                                                       ....]
                                                                                                      ---rr-’l.
Full text of the other 22 pages

Page 2

       NOOSA ON WEYBA
     Walter Hay Drive, Noosa




             on    weyba

      Community Title Report


              Prepared by
   Priscilla Hyde/Michael Silver for


NORTHBROOK CORPORATION PTY
                LTD.




                             strata managers I   community experts

Page 3

                                                                                Report Name: Community Title Report
                                                                                      Project Name: Noosa on Weyba
TABLE OF CONTENTS
1.    Introduction                                                                                              3
      1.1  Purpose                                                                                              3
2.    Scheme Description                                                                                        3
      2.1    Location and Land Parcels                                                                          3
      2.2     Description of Proposed Product Mix On Site                                                       4
3.    Overview benefits of the community title
               -
                                                                                                                4
4.    Draft Structure to Community Title Noosa on Weyba                                                         5
      4.1     Community Title Scheme Layered Scheme Arrangement
                                         -
                                                                                                                5
              Nature of Development Compliance
                                     -
                                                                                                                5
5.    Demonstrate how a Community Title Structure will police the relevant By-laws                              9
      5.1     General information contained within a Community Management Statement (CMS)for Principal Scheme   9
6.    Demonstrate how an overarching Principal scheme has the power to enforce conditions and
             restrictions                                                                                       13
      6.1    Enforcement                                                                                        13
7.    Demonstrate how the Community Management Statement is binding on all purchasers and occupiers of
      Noosa on Weyba                                                                                            14
      7.1    Disclosure Statements                                                                              14
8.    Demonstrate how the Community Title model collects levies to fund management and conservation for
      Noosa on Weyba and related areas under Council Control in relation to the Biodiversity Offset Area
      (BODA)                                                                                                    16
      8.1      Funding Management & Conservation                                                                16
9.    Definitions Used in the Report                                                                            19
10.   Conclusions and comment on practical lessons for consideration from existing schemes under
      management similar to the proposed Noosa on Weyba Project                                                 20
11.   Concept Master Plan Appendix "A"
                            -
                                                                                                                21
12.   Concept Community Title Structure Appendix "B"
                                             -
                                                                                                                22




                                                                                  strata managers I   community experts
                                                    Page 2 of 22

Page 4

                                                                       Report Name: Community Title Report
                                                                            Project Name: Noosa on Weyba



1. Introduction

  1.1   Purpose
        Our firm SSKB has been    engaged to provide a report regarding the community titling for the
        proposed Noosa on Weyba project. We understand Northbrook will be referring our report to the
        relevant Government Departments as part of your application for development approval.



        This report is to address the following   -




           Benefits of Community Title for Noosa on Weyba.
           Draft structure to Community Title Noosa on Weyba.
           Demonstrate how the Community Title Structure will police the relevant By-laws.
           Demonstrate how an overarching Principal scheme has the power to enforce conditions
           and restrictions.
           Demonstrate how the Community Management Statement is binding on all purchasers
           and occupiers of Noosa on Weyba.
           Demonstrate how the Community Title model collects levies to fund management and
           conservation for Noosa on Weyba and related areas under Council control in relation to
           the Biodiversity Offset Area (BDOA)
           Conclusion and comment on practical lessons for consideration from existing schemes
           under management similar to the proposed Noosa on Weyba Project.




2 Scheme description

  2.1   Location and Land Parcels
        The proposed scheme comprises several land parcels which are traversed by Walter Hay Drive,
        Noosaville being:

             Lot 7 on RP46782
             Lot 2 on RP160983
             Lot 1667 on M3772
             Lot 2 on SP179590
             Lot 53 on SP163571
             Lot 11 on RP893393
             Lot 12 on RP893393




                                                                        strata managers I    community experts
                                                  Page 3 of 22

Page 5

                                                                               Report Name: Community Title Report
                                                                                    Project Name: Noosa on Weyba


  2.2 Description of Proposed Product mix on site
         Proposed buildings will encompass urban design in the following product types and styles:

              Precinct A   -
                               Resident’s Lounge
              Precinct B   -
                               Premium Residential Lots
              Precinct C   -

                               Apartment Living / Mixed use
              Precinct D   -
                               Gated Townhouses
              Precinct E   -
                               Retirement Living / Aged Care
              Precinct F   -
                               Residential Lots    -
                                                       Environmental Amenity
              Precinct G   -
                                Residential Lots   -
                                                       Environmental Amenity
              Precinct H   -
                               Residential Lots
              Precinct H (2) Townhouses
                                 -




              Precinct I   -
                               Residential Lots
              Precinct j   -
                               Rural Residential Lot
              Precinct K   -


                               Special Residential
              Precinct L   -
                               Retirement Living / Aged Care
              Precinct M   -
                               Parks
              Precinct N   -

                               Greenspace & BDOA Send Site
              Precinct 0 Lake Buffer Zone
                           -




    Concept Master Plan see Appendix "A"



3 Benefits of Community Title for Noosa on Weyba


  Overview

    There are many benefits the Noosa on Weyba project will incorporate using community titling, including:


    1.   Harnessing the Community spirit by providing a group of schemes as an administrative structure for
         owners to meet and make decisions for the      precincts and development as a whole.
    2.   The schemes obligations to provide a higher standard of maintenance for landscaped areas and
         facilities than would be provided by the local authority.
    3.   The responsibility of infrastructure within the development, which will allow for:
                 a) management of environmentally sustainable practices eg water harvesting and recycling;
                     and
                b) management and maintenance of identified areas of environmentally protected land.
    4.   The imposition of by-laws governing relationships between various precincts and, as appropriate,
         architectural and landscape controls that are binding on future owners in the development.




                                                                                strata managers I    community experts
                                                         Page 4 of 22

Page 6

                                                                        Report Name: Community Title Report
                                                                             Project Name: Noosa on Weyba


4 Draft structure to Community Title Noosa on Weyba

   4.1 Community Title Scheme Layered Scheme Arrangement
                                       -




      Community title is a method of providing governance for specific areas of land. It is "soft
      infrastructure" that complements the physical infrastructure that is built by developers.
      The governance runs with the land (as opposed to just attaching to the owner at the particular time).
      The governance does more than traditional covenants. Community title governance provides flexible
      management structures for people to come together to make decisions about issues that impact
      upon their land and lifestyle, and it also provides the administrative systems that allow the members
      of the community to implement their decisions.


      It is important to note community title does NOT mean gated community.


      While community title could be used for gated communities like Sanctuary Cove, Hope Island, and
      Royal Pines on the Gold Coast, it may also be used for developments like Noosa on Weyba. A local
      Sunshine Coast example of a successful community title scheme similar to the proposed Noosa on
      Weyba site is Ridges at Peregian Springs which is an existing layered scheme, where the streets
      and the private public areas will be available to the public at large and various environmental
      management plans are implemented by the Principal Scheme CMS (PBC CMS).

      The Layered scheme arrangement allows for a PBC CMS to be the governing document for the
      entire site and stipulates the manner in which lots may be subdivided and the rules, regulations,
      covenants and management plans that shall apply to those schemes. The sole purpose of the Noosa
      on Weyba PBC will be to look after community areas (like the parks and gardens) and provide for
      management of the development as a whole. It is the perfect system to protect any associated areas
      of the development as the standards of the gardens, public areas, building design, and building
      materials are set out for and to control everybody.




      Refer to Annexure "B"for proposed Community Title Structure for Noosa on Weyba



      Noosa on Weyba utilizing the layered scheme arrangement will use a PBC CMS to enshrine the
      management commitments on the site with particular focus on koalas and wildlife. The Principal
      scheme proposed will be similar to Ridges Peregian Springs CTS 39713 which will enshrine and
      obligate all Assessing Authority requirements as detailed in the CMS Schedule Band C provisions
      registered at the DNR being as follows:


                 NA TURE OF DEVELOPMENT
                 Compliance

                 All development of the CTS and any Subsidiary Schemes must (whether by the actions of
                 the Original Owner or any other person or entity):
           (a)   comply with all laws (including by reason of any relevant orders issued from any court
                 having jurisdiction);




                                                                          strata managers I   community experts
                                             Page 5 of 22

Page 7

                                                                   Report Name: Community Title Report
                                                                         Project Name: Noosa on Weyba

   (b)    comply with all requirements of any authority having jurisdiction including without limitation
          the Local Government (including without limitation all approvals issued under the Into
          grated Planning Act (Qld 1997));
   (c)    comply with the orders of the Planning and Environment Court (Maroochydore) in the
          mailer of 802703 of 2005 to which the Original Owner was a co-respondent including
          without limitation the order of Judge Dodds DCJ of 16 December 2005;
   (d)    comply with the provisions contained in the Coolum Ridges Master Planned Community
          Master Plan and Maroochy Plan 2000, Maroochy Plan 2000 Planning Scheme Codes and
          Policies, and the Coolum Ridges Koala Sensitive Urban Development Code (as is
          applicable); and
   (e)    take into account the plans and statements (as are current from time to time) provided to
          the Original Owner including without limitation:


          (1) environmental management plans;
          (2) engineering management plan;
          (3) fauna management plan;
          (4) vegetation management and retention plan;
          (5) landscaping management plan; and/or
          (6) acoustic plans.

The PSC CMS governs all lots within the site and in particular to the extent that any lot or subsidiary
scheme may not be consistent with the PSC CMS, the PSC CMS will prevail as per the Body
Corporate and Management Act 1997 Section 58 which states:

   58 Community management statement for higher scheme prevails
   (1)        If a community titles scheme (schemeA) is a subsidiary scheme, scheme A’s
              community management statement (other than the unaffected provisions) has effect
              subject to the community management statement for each community titles scheme
              for which scheme A is a subsidiary scheme.
   (2)        In subsection (1)-unaffectedprovisions means-
              (a)      the lot entitlement schedules in scheme A’s community management
                       statement; and
              (b)       the provisions of scheme A’s community management statement prescribed
                        under a regulation applying to scheme A.


Example- The community management statement for the principal scheme in a layered
arrangement of community titles schemes prevails over the provisions (other than the lot entitlement
schedules and the provisions prescribed under subsection (2)(b)) of the community management
statement for each other community titles scheme forming part of the layered arrangement..



The relevant planning authority must endorse each CMS under Section 60 of the Body Corporate
and Community Management Act. The endorsement process is an assurance that all provisions of
the Development Approval obligations, management plans or operational requirements under the
approval are enshrined in the prevailing PSC CMS. The further endorsement process for any new
CMS after the First CMS is approved ensures the CMS provisions do not change.




                                                                     strata managers I    community experts
                                        Page 6 of 22

Page 8

                                                             Report Name: Community Title Report
                                                                  Project Name: Noosa on Weyba



60 Community management statement notation
(1)      Subject to subsection (6), a community management statement proposed to be
         recorded for a community titles scheme may be recorded only if each relevant
        planning body for the scheme has endorsed on the statement a certificate (a
        community management statement notation).
(2)     In a community management statement notation a relevant planning body for a
        community titles scheme states only that
        it has noted the community management statement.
(3)     Subject to subsection (4), a relevant planning body must endorse a community
        management statement notation on the proposed community management statement.
(4)     For a community titles scheme intended to be developed progressively, a relevant
        planning body for the scheme is not required to endorse a community management
        statement notation on the proposed community management statement if there is an
        inconsistency between a provision of the statement and-
        (a)       if the relevant planning body is a local government-a lawful requirement of,
                  or an approval given by, the local government under the Sustainable

                  Planning Act 2009; or
        (b)       if the relevant planning body is the urban land development authority-a
                  lawful requirement of, or an approval given by-
                  (i)       a local government under the Sustainable Planning Act 2009; or

                  (ii)       the urban land development authority under the Urban Land
                            Development Authority Act 2007; or
        (c)       the planning instrument of the relevant planning body; or
        (d)       a lawful requirement of, or an approval given by, the relevant planning body

                  under the planning instrument of the relevant planning body.
        Example for subsection (4)- A relevant planning body that is a local government
        would be expected to refuse to endorse a proposed community management
        statement with a community management statement notation if the statement
        envisages development ofpart of the scheme land in a way prohibited under its
        planning instrument. However, the relevant planning body would be expected to
        endorse the proposed statement with a community management statement notation if
        the proposed community management statement acknowledges that development of
        the part of the land in the way proposed will proceed only if and when a suitable
        amendment of the planning instrument is made.
 (5)    For subsection (4), a provision of the statement is not inconsistent with a planning
        instrument only because-
        (a)       the planning instrument allows a person to do an act or engage in an activity
                  in the area in which the community titles scheme is established; and
        (b)       the provision requires the person to obtain the body corporate’s permission
                  before doing the act or engaging in the activity on scheme land.
  (6)   Despite subsection (1), a new community management statement may be recorded
        without the endorsement on it of any community management statement notation that
        is otherwise required if-
        (a)       there is no difference between the existing statement for the scheme and the
                  new statement for any issue that a relevant planning body for the scheme

        Example for paragraph (a)- The new statement includes an interest schedule that is
        different from the interest schedule included in the existing statement, but there is
         otherwise no difference between the 2 statements.




                                                              strata managers I    community experts
                                Page 7 of 22

Page 9

                                                                     Report Name: Community Title Report
                                                                           Project Name: Noosa on Weyba



                 (b)any difference between the statements is limited to changes to reflect-
                           (i)      a lot entitlement adjustment agreed to under section 50; or

                           (ii)     a formal acquisition affecting the scheme; or

                           (iii)    a change in a services location diagram for the scheme; or

                           (iv)     the incorporation of a lot with common property, or conversion of
                                    lessee common property to a lot, under section 40.
        (7)      If a relevant planning body for the scheme does not endorse a community
                 management statement notation within 40 days after the community management
                 statement is submitted for endorsement under this section, or refuses to endorse the
                 notation-
                 (a)      the person who submitted the community management statement for
                          endorsement of the notation may appeal to the Planning and Environment
                          Court under the Sustainable Planning Act 2009; and
                 (b)      the court is required to hear and decide the appeal.
        (8)      For an appeal under subsection (7)-
                 (a)      the relevant planning body is the respondent; and
                 (b)      the Sustainable Planning Act 2009, chapter 7, part 1, divisions 11 to 13
                          apply, with necessary changes, as if-
                          (i)      the appeal were an appeal mentioned in the divisions; and
                          (ii)     the relevant planning body were the only other party to the appeal;
                                   and
                 (c)      the appellant must give the relevant planning body the written notice of the
                          appeal under the divisions within 10 business days after starting the appeal.
        (9)      In this section- planning instrument, of a relevant planning body, means-
                 (a)      if the body is a local government-
                          (i)      its planning scheme under the Sustainable Planning Act 2009; or
                          (ii)      an instrument of the local government having effect as if it were a

                                    planning scheme of the local government; or
                 (b)      if the body is the urban land development authority-an interim land use plan
                          or development scheme under the Urban Land Development Authority Act

                          2007.
        relevant planning body, for a community titles scheme, means-
                 (a)      to the extent scheme land is or is proposed to be located in an urban
                          development area-the urban land development authority; and
                 (b)      to the extent scheme land is or is proposed to be located in a local
                          government area but not in an urban development area-the local
                          government for the local government area.

Subsidiary Scheme Precincts under the Noosa on Weyba Principal Scheme


Subsidiary schemes will comprise a proposed mix of Standard Format Plans and Building Format Plans
all registered with their own individual CMS which cannot be inconsistent with the provisions of the
overarching Noosa on Weyba PBC CMS. If there are different proposed Design Guidelines which can
be facilitated without conflict with the Principal Scheme guidelines they can also be adopted for each
subsidiary to ensure compliance that may only be relevant to that precinct. The PBC CMS can include
provisions that obligate each subsidiary scheme to include reference to the PBC CMS and any relevant
obligations it must acknowledge and adhere to.




                                                                       strata managers I    community experts
                                         Page 8 of 22

Page 10

                                                                               Report Name: Community Title Report
                                                                                    Project Name: Noosa on Weyba
    Standard Format Plans
    The lots for various residential subsidiary schemes may be subdivided to create a second level of bodies
    corporate. Where lots are subdivided into attached or detached dwellings generally standard format
    plans will be used to create this second level.
    These Standard Format Plan Subdivisions would include traditional allotments. Several different housing
    types may be grouped into subsidiaries depending on proximity and shared use of common property
    such as access roadways and driveways.




    Buildings Format Plans
    The Apartments would typically be subdivided by building format plans. As such the respective bodies
    corporate will be responsible for all maintenance of the external building structure of lots in each
    scheme. In this way the consistency of maintenance and amenity is maintained in the long term.

    Each of these localised subsidiary schemes will be responsible for the maintenance of the common
    property of their own scheme. The CMS for these types of subsidiary scheme would contain relevant
    provisions to protect the amenity of the scheme including negative obligations not to do things that would
    detract from the outward appearance in light of the apartment’s scheme proximity to the public spaces.

    The common property for each subsidiary scheme will consist of areas such as        -




             The entry statement for that scheme    if any
                                                       -




             Any   access   roadways and driveways used  only by that scheme, such as in the townhouses
             The utility service infrastructure, which is by definition the responsibility of that scheme.
             In the case of the apartments scheme [building format plan] foyers, external building facade,
             pools etc


5 Demonstrate how the Community Title Structure will police
  the relevant By-laws.

   5.1 General information contained within a Community Management Statement
       (CMS)for Principal Scheme
       The PBC CMS is the governing document for the entire scheme and stipulates the manner in which
       lots may be subdivided and the rules and regulations that shall apply to those schemes.             The PBC
       will collect funds to deliver the requirements under the CMS provisions with personnel such as on
       site managers, contractors          or   specialist consultants to implement previous mentioned such
       provisions.

       The Noosa on Weyba proposed Principal CMS typically will contain the following inclusions           -




             Schedule A     -
                                schedule of entitlements
             Schedule B explanation of the development
                            -




             Schedule C By-Laws
                            -




             Schedule D  Any other details required to be recorded, such as environmental protection
                            -




             initiatives
             Schedule E     -

                                Description of lots allocated exclusive use areas of common property (if
             applicable).




                                                                                 strata managers I   community experts
                                                    Page 9 of 22

Page 11

                                                                            Report Name: Community Title Report
                                                                                 Project Name: Noosa on Weyba


Schedule A   -
                 schedule of entitlements

    Section 46 (BCCM Act 1997) which sets out the application of the contribution schedule and
    interest schedule entitlements. The Act states that a principle of Equality or Relativity must be
    identified and all lots contribution entitlements must provide information as to the underlying
    basis on how the entitlements were calculated using either Principle. For interest entitlements
    the Act states that the market value principle must be used, unless circumstances require
    another just and equitable method to be used.



Schedule B   -

                 explanation of the development
    This schedule should be completed in accordance with Section 57(3) and (7) (BCCM Act
     1997;)      Each   plan    or   other instrument lodged       relating to the scheme land shall be in
    accordance with the provisions set out in this schedule.


    This schedule sets out the future development of the scheme. For example how many stages it
    will be developed over and the likely yield in terms of lots. It also sets out how entitlements in
    future stages will be calculated in accordance with use and impact upon common property.


Schedule C   -


                 By-Laws
    The purpose of the By-Laws is to set out permitted use and behaviour on common property and
    also conduct within individual lots.


    The Body Corporate is obligated under Section 94 of the Body Corporate and Community
     Management Act to enforce the Community management Statement which includes the by-
    laws contained therein as detailed below:


    94 Body corporate’s general functions
    (1)    The body corporate for a community titles scheme must-
           (a)      administer the common property and body corporate assets for the benefit of
                           the owners of the lots included in the scheme; and
                 (b)       enforce the community management statement (including enforcing any by-
                           laws for the scheme in the way provided under this Act); and
                 (c)       carry out the other functions given to the body corporate under this Act and
                           the community management statement.


 For a scheme such         as   Noosa Weyba the by-laws would typically contain any Assessing
                                          on

Authority requirements plus the following provisions:

    1.        Interpretation    -
                                 covers   meaning of words, rules of interpretation
    2.        Noise and obstruction- behavior of invitees
    3.        Behaviour of invitees.
    4.        Maintenance of lots.
    5.       Protection of Common Property            -
                                                          Gardens and plants, Roadways particularly vehicular
             speeds within Noosa on Weyba, Structures, Rubbish management, Damage to Common
             Property




                                                                             strata managers I    community experts
                                               Page 10 of 22

Page 12

                                                                               Report Name: Community Title Report
                                                                                     Project Name: Noosa on Weyba

                 6.     Any special requirements for plants and gardens (Flora and Fauna Management Plans)
                 7.     Any requirements for approval of structural alterations
                 8.     Requirements for rubbish disposal
                 9.     Any restrictions on the use of the lots or the Community Property Display Site, Parking,
                                                                                           -




                        maintenance of Lots, Flammable liquids, Animals in particular dogs and cats to minimize
                        potential harm to native fauna and koalas, Use of facilities, notice of damage, Vehicles,
                        parking and driving, Visitor parking
                 10.    Limitations on parking and vehicle access.
                 11.    Security including access to the Community Property through any development gates.
                 12.    Any exclusive use areas that might be granted.
                 13.    Special privileges to a resident manager.
                 14.    Restrictions on the keeping of animals and interactions with Koalas
                 15.    Restrictions regarding vermin and infectious diseases.
                 16.    Cost recovery by-laws
                 17.    Management of the Residents Lounge Areas & facilities.
                 18.    Management of the Environmentally Protected Areas
                 19.    Any other special matters particular to your development, such as certain conditions
                        which may be within your development approval.
                 20.     Conduct on Parcel- obstruction, Noise, Behaviour of visitors
                 21.    Ability of the original owner to enter into proposed agreement such as with the local
                        authority to maintain areas not common property or alternatively adopt a fee for
                        contribution to the facility.
                 22.     Miscellaneous


Other By-laws would outline the management and obligations in relation to the issues that the body corporate has
control over. Items such as management of aspects of the fire control zones, conservation zones, water sensitive
urban design such as swales and gross pollutant traps may be set out in the by-laws. Other strategies to allow
the local authority to receive a contribution for areas outside the scheme could be a proposed. Easements to
obligate the scheme to contribute towards koala fencing outside the scheme along Walter Hay Drive.

            Schedule 0  -

                          Any other details required to be recorded
                  Many of the ideals and visions of the Scheme together with the means by which they are
                 delivered are set out in this schedule.


        Typically the schedule can contain the following items:

            Architectural and Landscape Code and ESD initiatives


            In a traditional land subdivision, design requirements for the structures to be built on the lots would
            be in the contract of sale only. They would bind the immediate purchasers but would not run with the
            land to bind future owners. In a Community Title Scheme these covenants which deal with long term
                                   landscaping and architectural guidelines as part of the by-laws in the CMS.
            concerns are included as

            These will bebinding on the original owners whom may sell to and any future owners. The
            Community Scheme will always be able to enforce the covenants against all owners.




                                                                                 strata managers I    community experts
                                                   Page 11 of22

Page 13

                                                                   Report Name: Community Title Report
                                                                        Project Name: Noosa on Weyba

A Code encourages developments that will enhance the total amenity and character of the scheme
and ensures development in tune with the intent of the code. The means by which this is achieved is
via the establishment of the architectural and landscaping review committee. The committee can be
constituted by representatives of the developer who may include a panel of experts usually
comprising architects, horticulturists etc with knowledge of the master planning of the scheme.

The code sets out the operation of the committee and includes items such as


1. Establishment of the ARC
2.   Meetings of the ARC
3. Consultants to the ARC


The code includes a summary of the Aim, Intent and Standards Explanation and goes into detail on
the means by which these standards are met and gives practical examples utilising diagrams to
explain the implementation.

The code would     provide an outline of the operation of the various ESD initiatives that may be
incorporated into each lot that is developed. For example items such as koala fencing and rain water
collection and harvesting. The implementation and on-going management of which would require
intervention by the body corporate.


An   example where management plans/initiatives are enshrined within the CMS is the Viridian
Noosa project where in Schedule D goes on to adopt the Architectural and Landscaping codes plus
restrict any changes to the CMS/Code without the Assessing Authority approval with the section
below:


         Amendments to Code


         Each owner and the Body Corporate acknowledge that:   -




         (a)   a change to this Architectural Design and Landscaping Code is an issue, within the
               meaning of section 60(6)(a) of the Act, that the Assessing Authority could have regard
               to for identifying an inconsistency referred to section 60(4) of the Act: and

         (b)   no new Community management Statement which purports to amend the Architectural

               Design and Landscaping Code will be approved or executed by the Boyd Corporate
               without first obtaining the prior written consent of the Assessing Authority.


The local authority must endorse each CMS under Section 60 of the Body Corporate and Community
Management Act to comply with lodgement at the Department of Natural Resources as follows:


      60 Community management statement notation
      (1)      Subject to subsection (6), a community management statement proposed to be
               recorded for a community titles scheme may be recorded only if each relevant
               planning body for the scheme has endorsed on the statement a certificate (a
               community management statement notation).
      (2)       In a community management statement notation a relevant planning body for a
               community titles scheme states only that it has noted the community management
               statement.




                                                                    strata managers I    community experts
                                      Page 12 of 22

Page 14

                                                                           Report Name: Community Title Report
                                                                                 Project Name: Noosa on Weyba
           (3)         Subject to subsection (4), a relevant planning body must endorse a community
                       management statement notation on the proposed community management statement.

      Schedule E   -

                       Description of lots allocated exclusive use areas of common property (if applicable).


      This Schedule shall be in addition to the by-laws under which exclusive use is allocated. It shall
      identify the lots affected and include the relevant sketch plans required. Unless principal common
      property areas are designated for the exclusive use of a particular scheme this schedule is not likely
      to have use for the principal body corporate but would be utilised for a subsidiary scheme CMS
      typically in a unit development (Building format plan) for the allocation of car spaces in a basement
      car park.




6 Demonstrate how an overarching Principal scheme has the
  power to enforce conditions and restrictions.

  6.1 Enforcement

      The PBC CMS and inclusions therein are binding on the Body Corporate, members of each Body
      Corporate (lot owners) and any occupiers within the Scheme or subsidiary schemes. Section 59
      outlines the provisions and the binding nature of them:


           59 Taking effect of community management statement
           (1)     A community management statement takes effect under the Land Title Act, section
                   115L(3).
           (2)     The community management statement for a community titles scheme is binding on-
                   (a)      the body corporate; and
                   (b)      each member of the body corporate; and
                   (c)      to the extent that paragraphs (a)and (b)do not apply to bind a person-
                            (i)       each person who is a registered proprietor of a lot included in the
                                         scheme; and
                                (ii)      each person who is a registered proprietor of common property; and
                       (d)      to the extent that paragraphs (b)and (c)do not apply to bind a person-
                                (i)      each person who is the occupier of a lot included in the scheme;
                                         and
                                (ii)     each person who is an occupier of common property.
           (3)         Subsection (2)has effect as if-
                       (a)      the community management statement included mutual covenants to
                                observe its provisions entered into by each person bound by it; and
                       (b)      each person bound had signed the community management statement under
                                seal.


           The binding provision with Section 59 together with Section 94 for the Body Corporate to
           enforce by-laws allows the ability to enforce the restrictions and conditions that are applied by
           the Assessing Authority and any provisions the original owner in consultation with the legal
           representatives and strata consultant implement under the PBC CMS.




                                                                             strata managers I    community experts
                                               Page 13 of 22

Page 15

                                                                            Report Name: Community Title Report
                                                                                  Project Name: Noosa on Weyba
7 Demonstrate how the Community Management Statement is
  binding on all purchasers and occupiers of Noosa on Weyba.
  7.1   Disclosure Statements

        In addition to the on title registered CMS which is noted on any lot title search at the Department of
        Natural Resources, sellers are required under Section 213 of the Body Corporate and Community
        Management Act to give a disclosure statement to cover the following provisions. Note there is
        legislation amendments currently in draft bill which will remove the current obligation for the Seller to
        provide a copy of the CMS

                 The previous position in the legislation will be reinstated removing this obligation, however
                 any reasonable purchasers lawyer will require a copy of the relevant CMS anyway..
                 Records for each Community Title Scheme are available for searching either at the
                 residence of the Secretary or where a Body Corporate Manager is engaged their offices:


             213 Information to be given by seller to buyer
             (1)       Before a contract (the contract) is entered into by a person
                       (the seller) with another person (the buyer) for the sale to the
                       buyer of a lot (the proposed lot) intended to come into
                       existence as a lot included in a community titles scheme when
                       the scheme is established or changed, the seller must give the
                       buyer a disclosure statement.
             (2)       The disclosure statement-
                       (a)      must state-
                                (i)      the amount of annual contributions reasonably
                                         expected to be payable to the body corporate by the
                                         owner of the proposed lot; and

                                (ii)     the extent to which the amount mentioned in
                                         subparagraph (i) is based on the contribution
                                         schedule lot entitlements for the lots included in
                                         the scheme; and
                                (iii)    the extent to which the amount mentioned in
                                         subparagraph (i) is based on the interest schedule
                                         lot entitlements for the lots included in the scheme;
                                         and
                                (iv)     that the contribution schedule lot entitlements, and
                                         interest schedule lot entitlements, for the lots
                                         included in the scheme are set out in the proposed
                                         community management statement for the scheme;
                                         and
                       (b)      must include, for any engagement of a person as a body
                                corporate manager or service contractor for the scheme
                                proposed to be entered into after the establishment of
                                the scheme, or proposed to be continued or entered into
                                after the scheme is changed-




                                                                              strata managers I    community experts
                                                Page 14 of 22

Page 16

                                                                            Report Name: Community Title Report
                                                                                  Project Name: Noosa on Weyba
                              (i)       the terms of the engagement, other than any
                                        provisions of the code of conduct that are taken to
                                        be included in the terms under section 118; and
                              (H)       the estimated cost of the engagement to the body
                                       corporate; and
                              (Hi)     the proporlion of the cost to be borne by the owner
                                       of the proposed lot; and
                     (c)      must include, for any authorisation of a person as a
                              letting agent for the scheme proposed to be given after
                              the establishment of the scheme, or proposed to be
                              continued or given after the scheme is changed, the
                              terms of the authorisation; and


                     (d)      must include details of all body corporate assets
                              proposed to be acquired by the body corporate after the
                              establishment or change of the scheme; and
                     (e)      must be accompanied by-
                              (i)     the proposed community management statement;
                                        and
                              (H)       if the scheme to be established or changed is
                                      proposed to be established as a subsidiary
                                      scheme-the existing or proposed community
                                      management statement of each scheme of which
                                      the proposed subsidiary scheme is proposed to be a
                                      subsidiary; and
                     (f)      must identify the regulation module proposed to apply
                              to the scheme; and
                     (g)      must include other matters prescribed under the
                              regulation module applying to the scheme.
         (3)         The disclosure statement must be signed by the seller or a
                     person authorised by the seller.
         (4)         The disclosure statement must be substantially complete.
         (5)         If the proposed lot the subject of the contract is not residential
                     properly, the seller must have an information sheet in the
                     approved form attached to the contract when the contract is
                     given to the buyer.
         (5A)        A form may be approved under section 320 for an information
                     sheet for a proposed lot that is residential properly.


         Note-       See the Property Agents and Motor Dealers Act 2000, section 364,definition
information sheet.


         (6)         If the contract has not already been settled, the buyer may
                     terminate the contract if-
                     (a)      the seller has not complied with subsection (1); or
                     (b)      the lot the subject of the contract is not residential
                              properly and the seller has not complied with subsection




                                                                              strata managers I   community experts
                                              Page 15 of 22

Page 17

                                                                          Report Name: Community Title Report
                                                                               Project Name: Noosa on Weyba
                                (5).
              (7)       The seller does not fail to comply with subsection (1)merely
                        because the disclosure statement, although substantially
                        complete as at the day the contract is entered into, contains
                        inaccuracies.




8 Demonstrate how the Community Title model collects levies
  to fund management and conservation for Noosa on Weyba
  and related areas under Council control in relation to the
  Biodiversity Offset Area (BDOA)

  8.1   Funding Management and Conservation

        A  community title scheme must adopt both an Administration and a Sinking Fund Budget for
        expenditure at the annual general meeting each year. The inclusions within each fund function
        differently.

        The Noosa on Weyba administration fund is expected to cover reasonable expenditure for the cost of
        maintaining common property, body corporate assets and insurance. The budget for the first 12
        months is prepared for the original owner and would include any day to day costs associated with
        common property, management plans or DA obligations which be generated.



        The Noosa on Weyba Sinking Fund is expected to fund items of a capital or non-recurrent nature.
        When preparing the first 12 month budget for the scheme a Quantity Surveyor is engaged by the
        original owner to prepare the Sinking Fund Report which includes any costs associated with common
        property, management plans or DA obligations which generate a cost.

        The implications for Noosa on Weyba under a Community Title Scheme structure immediately
        obligates both a Principal scheme and any subsidiary scheme to adopt both Administration and
        Sinking Fund which can include funding for but not limited to the following:

            Funding of Koala habitat enhancement and restoration within Noosa on Weyba
            Funding the maintenance of koala fencing within Noosa on Weyba
            Contribution towards maintaining koala fencing under Council control (along Walter Hay Drive),
            the scheme would require an additional obligation such as an easement with Councilor an
            agreement to specify the terms of such contribution. The original owner would have powers to
            enter into such agreement under the CMS at the first meeting of the scheme or within the first 12
            months under the relevant power of attorneys.


              The relevant legislation sections which enshrine the above in community title schemes are as
             follows:




                                                                            strata managers I   community experts
                                              Page 16 of 22

Page 18

                                                            Report Name: Community Title Report
                                                                   Project Name: Noosa on Weyba
BCCMA 1997 (Standard Module) Regulation Section 146 Administrative and Sinking
funds
(1)     The body corporate must establish and keep an administrative fund and a sinking
        fund.
(2)     The body corporate must pay into its administrative fund any amount received by the
        body corporate that is not required under subsection (3) to be paid into its sinking
        fund.
(3)     The body corporate must pay into its sinking fund   -




        (a)     the amount raised by way of contribution to cover anticipated spending of a
                capital or non-recurrent nature (including the periodic renewal or
                replacement of major items of a capital nature and other spending that
                should be reasonably met from capital); and
        (b)     amounts received under policies of insurance for destruction of items of a
                major capital nature; and
        (c)     interest from investment of the sinking fund.


BCCMA 1997 (Standard Module) Regulation Section 148 Application of administrative
and sinking funds
(1)     The sinking fund may be applied towards-
        (a)     spending of a capital or non-recurrent nature; and
        (b)     the periodic replacement of major items of a capital nature; and
        (c)     other spending that should reasonably be met from capital.


BCCMA 1997 (Standard Module) Regulation Section 139 Budgets
(1)     The body corporate must, by ordinary resolution, adopt 2 budgets for each financial

        year-
                         the administrative fund budget
                         the sinking fund budget.
                         Note- See section 146 (Administrative and sinking funds).


(2)     The administrative fund budget must-
        (a)     contain estimates for the financial year of necessary and reasonable
                spending from the administrative fund to cover-
                (i)     the cost of maintaining common property and body corporate
                         assets; and
                (ii)     the cost of insurance; and


(3)     The sinking fund budget must-
        (a)     allow for raising a reasonable capital amount both to provide for necessary
                and reasonable spending from the sinking fund for the financial year, and
                also to reserve an appropriate proportional share of amounts necessary to
                be accumulated to meet anticipated major expenditure over at least the next
                9years after the financial year, having regard t~
                (i)       anticipated expenditure of a capital or non-recurrent nature; and
                (ii)      the periodic replacement of items of a major capital nature; and
                (iii)     other expenditure that should reasonably be met from capital; and
        (b)      fix the amount to be raised by way of contribution to cover the capital amount
                mentioned in paragraph (a).




                                                                strata managers I   community experts
                               Page 17 of 22

Page 19

                                                               Report Name: Community Title Report
                                                                     Project Name: Noosa on Weyba
(4)     If the community titles scheme is a lot included in another community titles scheme,
        the administrative fund budget must       also include an estimate of the total amount
        the body corporate may reasonably be expected to be required to contribute to the
        administrative and sinking funds for the other scheme, and any other fund provided for
        in the regulation module applying to the other scheme.


(5)     The original owner must prepare proposed budgets for adoption by the body corporate
        at its first annual general meeting, and the committee must prepare proposed
        budgets for adoption by the body corporate at each later annual general meeting.

(6)     Copies of the proposed budgets must accompany the notice of an annual general
        meeting.

(7)     To remove any doubt, it is declared that the inclusion of an item of expenditure in a
        budget adopted by the body corporate is not, of itself, authority for the expenditure.

Documents to be provided by the Original Owner include the Sinking Fund


BCCMA 1997 (Standard Module) Regulation Section 79 Documents and materials to be
handed over to body corporate at first annual general meeting
(1)     At the first annual general meeting, the original owner must give the following to the
        body corporate-
        (a)     a register of assets containing an inventory of all body corporate assets;

        (b)     all plans, specifications, diagrams and drawings of buildings and
                improvements forming part of scheme land (as built) showing water pipes,
                electrical wiring, drainage, ventilation ducts, air conditioning systems and
                other utility infrastructure;
        (c)     all policies of insurance taken out by the original owner for the body
                 corporate;
        (d)      an independent valuation for each building the body corporate must insure

                 under chapter 8, part 9;
        (e)      documents in the original owner’s possession or control relevant to the
                 community titles scheme, including, for example, the body corporate’s roll,
                 books of account, meeting minutes, registers, any body corporate manager
                 or service contractor engagement or letting agent authorisation,

                 correspondence and tender documentation;
        m        the body corporate’s seal;
        (g)      documents in the original owner’s possession or control relevant to the
                 buildings or improvements on scheme land, not including certificates of title
                 for individual lots or documents evidencing rights or obligations of the original
                 owner that are not capable of being used for the benefit of the body corporate

                 or an owner (other than an owner who is the original owner) of a            lot, but
                 including-
                 (i)       contracts for building work, or other work of a developmental nature,
                           carried out on scheme land; and
                 (ii)      certificates of classification for buildings and fire safety certificates;
        (h)      administrative and sinking fund budgets showing the body corporate’s
                 estimated spending for the first financial year;




                                                                 strata managers I    community experts
                                 Page 18 of 22

Page 20

                                                                           Report Name: Community Title Report
                                                                                 Project Name: Noosa on Weyba
                                 (i)      a   detailed and comprehensive estimate of the body corporate’s
                                          sinking fund expenditure for the scheme’s first 10 financial years
                                          that must include an estimate for the repainting of common property
                                          and of buildings that are body corporate assets.


              BCCMA 1997 Section 13 Meaning of original owner
              (1)        The original owner for a community titles scheme means each person who,
                         immediately before the establishment of the scheme, is a registered owner of a lot
                         that, on establishment of the scheme, becomes scheme land.
              (2)        If, immediately before the establishment of the scheme, land that becomes scheme
                         land is in the possession of a person acting under the authority of a mortgage or an
                         order of a court, the original owner includes the person acting under the authority


9 Definitions Used in This Report

            Term                                                 Meaning
     BCCMA                    the Body Corporate and Community Management Act 1997 (Old)

     Body Corporate           the body corporate for Noosa on Weyba
     CMS                      community management statement
     Scheme                   the community titles scheme for Noosa on Weyba CTS number
     Lot                      A part of the scheme that is allocated for separate occupation or a
                              distinct parcel of land created on-
                              (a)the registration of a plan of subdivision; or
                              (b)the recording of particulars of an instrument.
     Contribution             Proportion lot entitlement that each owner is allocated under the
     Schedule Lot             Community Management Statement. Used to calculate Administration
     Entitlement              Fund Levies and Sinking Fund Levies. Based on each individual lot
                              burden on common property
     Contribution             Proportion interest entitlement that each owner is allocated under the
     Schedule Interest        Community Management Statement. Used to calculate any
     Entitlement              Administration (Insurance)levies related to building cover only. Based
                              on value.




                                                                             strata managers I   community experts
                                                 Page 19 of 22

Page 21

                                                                          Report Name: Community Title Report
                                                                               Project Name: Noosa on Weyba
10    Conclusion              and       comment                on   practical         lessons          for
      consideration from existing schemes under management
      similar to the proposed Noosa on Weyba Project.

     Based on the current consulting plans to implement and deliver Noosa on Weyba as a Community Title
     Scheme there will be substantial sustainable outcomes for the Assessing Authority, Local Authority,
     owners and occupiers of the scheme to live in an environment that will provide the governance and

     financial system to ensure the vision created continues in perpetuity. Both Viridian Noosa and Ridges
     Peregian Springs have proven to be sustainable community title structures to facilitate the specialized
     management of both these sensitive sites.




      Yours faithfully,
      STEWART SILVER KING AND BURNS PTY LTD




        <=:2~
      Priscilla Hyde
      Development Division Manager / Consultant
      Direct 07 55042013
      Mobile 0439744439
      Email [email protected]




                                                                            strata managers I   community experts
                                               Page 20 of 22

Page 22

                                                                                                                     Report Name: Community Title Report
                                                                                                                                Project Name: Noosa on Weyba
11   Concept Master Plan

     Appendix "A"                -
                                       CONCEPT MASTER PLAN

     r                                                                                                                                                                            -,




                                                                                                                            -~r.t:

                                                                                                                            -......,.


                                                                                                                           .......-                          .........-      .......
                                                                                                                                                                 ..         --


                                                                                                                                 ........1....                   ,
                                                                                                                                 fih....ft.............                          .

                                                                                                                                 ’-’W’PIIt.-tJ_u-.                               ~
                                                                                                                                 i!fI=:,.,._......._~.....       ’"

                                                                                                                                 iI.Ua.-                         In

                                                                                                                                 ~~t....1:.-                     ’"      .       ..

                                                                                                                                 ~--.t’-’~a--t.....’-:IIIp       ..      .       .

                                                                                                                                 "--.oI~,~~                              .       ..
                                                                                                                                                                         .       .

                                                                                                                                                                                 .
                                                                                                                                 --...                         ""

                                                                                                                                 Ibf......,~                     W

                                                                                                                                 ~-,.....,..                     ’..

                                                              i                                                                  61__L-..I...,.n..               ...

                                                                                                                                                                 ...
                                                          I                                                                      ~-~~                          "’~

                                                          J.                                                                     1.’tIft.t..                     II.




                                                   /
                                                   ,~
                                                                                                                                 ....._i~.h
                                                                                                                                 ....&uioo_1-.
                                                                                                                                                              .-
                                                                                                                                                               .,..



                                                                                                    NOOSA ON I’ YBA

                         .STRUCTURE PUN                                      NOR~.ROa.~ CORP PTY lroANO 1& K!-fOF"’A~N          noosa-W
                                                                                                                                  Weyba:
                                                                                                                                      on                     _
                                                                                                                                                                          .


                                                                                                                                                                       DaIiIJI
         :or.!:.        ~t,,;’~.....,_\---t...:I   ~..,~..,       ~~IMl’J_     ~.\4O’lIl"’lK        .....-.;tI’MII   "’".,q’,                             ~1~..r_I""’"
         =c::l.o._.....___.._




                                                                                                                       strata managers I                         community experts
                                                                      Page 21 of 22

Page 23

                                                                                             Report Name: Community Title Report
                                                                                                  Project Name: Noosa on Weyba
12    Concept Community Title Structure
     Appendix "B" Showing approximate dwelling numbers.
                             -




               l                 ~Mi]Qml~lfiiiit!iGlill~                                                        ,I
                             rl          Precinct B
                                        Subscheme       H      .Premium Residential Lots
                                                               .73 proposed dwellings




                             H           Precinct C
                                        Subscheme       H      .Apartment living/Mixed Use
                                                               .50 proposed dwellings




                             H           Precinct D
                                        Subscheme       H      .Gated Townhouses
                                                               .83 proposed dwellings




                                      PrecinctE
                                      Englobo Lot
                             t---     Retirement Living
                                      Aged Care
                                      120 Proposed Dwellings
      Common Property for
      PBC Scheme
                                                               .Residential Lots
                                         Precinct F
                             r--                        r--    ’Environmental amenity
      May Include the                   Subscheme
                                                               ’40 proposed dwellings
      following:

      .Resident’s Lounge                                       ’Residential Lots
                                         Precinct G
      .Common landscaping    r--                        r--    ’Environmental amenity
                                        Subscheme
      .Pedestrian pathways                                     ’124 proposed dwellings
      .Parks
      .Greenspace
      .Lake Buffer Zone
      .Roadways
                             H           Precinct H
                                        Subscheme       H      ’Residential Lots
                                                               ’52 proposed dwellings




                             H          Precinct H2
                                        Subscheme       H      ’Townhouses
                                                               ’24 proposed dwellings




                             rl          Precinct I
                                        Subscheme       H      ’Residential Lots
                                                               ’203 proposed dwellings



                                      Precinct J

                             r--
                                      Englobo Lot
                                      Rural Residential Lot
                                      1 Proposed Dwelling



                                         Precinct K            .Special Residential
                             t----i                     1--1
                                        Subscheme              ’6 proposed dwellings




                                      Precinct L
                                      Englobo Lot
                             ’---
                                      Retirement Living
                                      Aged Care
                                      100 Proposed Dwellings




                                                                                              strata managers I      community experts
                                                         Page 22 of 22

Used in these records

About this file

File size
14.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Part 24 of 37 Appendix 22 - Community Title Report MCU12_0208.pdf · 14.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.