Report Name: Community Title Report
Project Name: Noosa on Weyba
(b) comply with all requirements of any authority having jurisdiction including without limitation
the Local Government (including without limitation all approvals issued under the Into
grated Planning Act (Qld 1997));
(c) comply with the orders of the Planning and Environment Court (Maroochydore) in the
mailer of 802703 of 2005 to which the Original Owner was a co-respondent including
without limitation the order of Judge Dodds DCJ of 16 December 2005;
(d) comply with the provisions contained in the Coolum Ridges Master Planned Community
Master Plan and Maroochy Plan 2000, Maroochy Plan 2000 Planning Scheme Codes and
Policies, and the Coolum Ridges Koala Sensitive Urban Development Code (as is
applicable); and
(e) take into account the plans and statements (as are current from time to time) provided to
the Original Owner including without limitation:
(1) environmental management plans;
(2) engineering management plan;
(3) fauna management plan;
(4) vegetation management and retention plan;
(5) landscaping management plan; and/or
(6) acoustic plans.
The PSC CMS governs all lots within the site and in particular to the extent that any lot or subsidiary
scheme may not be consistent with the PSC CMS, the PSC CMS will prevail as per the Body
Corporate and Management Act 1997 Section 58 which states:
58 Community management statement for higher scheme prevails
(1) If a community titles scheme (schemeA) is a subsidiary scheme, scheme A’s
community management statement (other than the unaffected provisions) has effect
subject to the community management statement for each community titles scheme
for which scheme A is a subsidiary scheme.
(2) In subsection (1)-unaffectedprovisions means-
(a) the lot entitlement schedules in scheme A’s community management
statement; and
(b) the provisions of scheme A’s community management statement prescribed
under a regulation applying to scheme A.
Example- The community management statement for the principal scheme in a layered
arrangement of community titles schemes prevails over the provisions (other than the lot entitlement
schedules and the provisions prescribed under subsection (2)(b)) of the community management
statement for each other community titles scheme forming part of the layered arrangement..
The relevant planning authority must endorse each CMS under Section 60 of the Body Corporate
and Community Management Act. The endorsement process is an assurance that all provisions of
the Development Approval obligations, management plans or operational requirements under the
approval are enshrined in the prevailing PSC CMS. The further endorsement process for any new
CMS after the First CMS is approved ensures the CMS provisions do not change.
strata managers I community experts
Page 6 of 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Part 24 of 37 Appendix 22 - Community Title Report MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 14.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.