Council archive · source document
Referenced Document MCU13/0171
With the exception of downpipes which discharge to the adjacent creek, there is very little drainage infrastructure servicing the hardstand pavements and open surfaces around the factory. There is no upstream catchment for the factory site as it is effectively bordered by the adjacent creek and road reserve drainage along Lake MacDonald Drive. 6.2 Post Developed Drainage The developed site will remain largely unchanged. There will be no increase to roof area and minimal, if any, increase to impervious driveway / car park area. The existing amenities block & staff offices near the site entry at ‘Gate 2’ is to be demolished and replaced with carpark and landscaping. The carpark near the site entry will drain via overland flow to the central landscaping rain- garden in the middle of the car park. The garden discharges into a Fox brand GPT, which is connected to the existing drainage pipe flowing east. Minor rehabilitation works to the existing vegetation buffer along the site frontage provides the opportunity to prevent the erosion of garden beds and transportation of sediment off-site. The adjacent delivery truck driveway along the side of the factory will be reinstated as necessary where it is currently damaged and sloped eastward to drain onto the existing grassed hardstand between the factory and the creek. A grassed or vegetated swale, as described in section 5.2, will be established in the grassed area to convey and naturally filter most sediments and hydrocarbons from the delivery driveway surface wash-off. The length of the swale will also lengthen the time of concentration for the factory site catchment, helping to reduce the peak stormwater discharge flow rate into the creek and off site. Rainwater harvesting tanks provide a nominal volume of detention storage both in the remainder volume required to top up the tank and in the overflow volume between the invert of the overflow pipe and tank lid. Again, this increases the time of concentration for the catchment and reduces the peak discharge flow rate of stormwater leaving site. We believe these nominal control measures for both stormwater quality and will reduce peak stormwater discharge flow rates below that of the current site, thereby satisfying the non-worsening of flows condition in section 3.01 of the Queensland Urban Drainage Manual (QUDM). 1014-ENG-01_Version 1.0 (September 2013) Page 5 of 8 TS/cl
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT MCU13/0171Related documentApplication case desk ↗
About this file
- File size
- 4.4 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.