NrereKwiwe Checklist - Applications Involving Land
Development & Land Use Sections

a

 

IDAS APPLICATION

This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.

1. APPLICATION FORMS"
1.1. Form’ PartA

1.1.1 Ensure that the form is fully completed. 1
1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required.

 

 

 

 

1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 — If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form’ Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. ral
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [7
2. REFERRALINFORMATION ~  — , , Be
2.1. Ensure that items 1-23 have been Checked and/or completed with regard to referrals. cf

3.“ ENVIRONMENTALLY RELEVANT ACTIVITIES Te ~
3.1 Ensure that Part G is completed if EPA referral is required.

 

 

3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.

 

4. " FORM 2~-REQUESTTO.CHANGE APPROVAL. | vt
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.

 

 

 

. i ore ewe oo : -

5. PLANS‘, eo ae a a Gea ee

 

 

 

 

 

5.1 Ensure that at least 6 sets of the Plan of Development {5 for Reconfiguration and Operational 3
Works) accompanies the application. In addition ensure that each set is complete.

5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or Ad format and is |
unbound.

"SUPPORTING INFORMATION * _ ~~ . ee . . — ~ woe ce

6.1. Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration | ; 4
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction. [Y]

6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.

To REBOOT eC ee
7.1 Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.

7.2 Ensure that the fee which has been paid is recorded on the application form.

Receiving Officer (2 Date PB BU OD vores

Having completed this form and accepted the apftfcation, please deliver both to the following IDAS Application Receiving

trays:-

© Ifthe application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section.

¢ Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section.

* Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.

*  Inafl other circumstances — AOP1's desk in the Land Use Section.

Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.

 

 

 

 

 

 

 

  

 

 

 

 

SEP g.\ant\forms\application checklist.doc

{ <300807—contex1—142423—004f
Full text of the other 22 pages

Page 2

GARY G=ORG= DESIGN GROUP

27" August 2007.

Mr Daniel Smith.
Planning Department.
Noosa Shire Council.
Pelican Street.
TEWANTIN QLD 4565.

 

Dear Daniel ,
RE :- LOT 817 THE PROMONTORY NOOSA WATERS.
Further to your recent conversation with our client , Mr David Snowden , we enclose

the following details for application for a relaxation in site cover :-

*** 3 copies of plans and elevation of proposed residence.

Note :- Ground floor site cover 44.3%.
Level 1 site cover 31.5%.
Total site cover 75.8%.

*** Signed applicaton form.
*** Cheque for $650.00 being for application fees.

Please address all future correspondence to our Melbourne office viz :-

PO Box 1039.
ST KILDA VIC 3182.
Phone 03 9593 9594
Mobiles 0447 642 866.
0411 642 866.
Email [email protected]
Yours faithfully.
v

Gary R George.

ARCHITECTURE INTERIORS LANDSCAPING

3/31 PICTURE POINT CRESCENT NOOSA HEADS Q 4567 TELEPHONE 617 5474 5264 FACSIMILE 617 5474 5294 MOBILE 0411 642 866
EMAIL [email protected] WEB www.garygeorgedesigngroup.com.au
BONNAY HOLOINGS PTY LTD ABN 95 011 040 805

Page 3

INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006

AS Form 1 Development Application

 
  

Common details &

QO.

 

The completion of afl applicable on Part A Is mandatory for all appfications. Part A must be accompanied by the completed 1DAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www.ipa.aid.gov.au.
( Any information requested In the form may be provided in an attachment to the appfication. For further information about completing the following details, refer to Guide 1,

 

 

 

i Description of land 1. Street address: (nctudinghouse number, street name, suburbocality name & postcade) (if applicable)

* Allland the subject of the application, must be —

ened. However, a decepion of be land st R N WE
eee eee 2. Name of water body or watercourse, within which the development is proposed: (i eppiicable)

 

EE a ate vty Linpcme Nir
nt is proposed within a water body or
watecourse. 3. Coren description (eg. Lot 123 on RP 4567)! GPS coordinates:

mpletin: - Most land can be
@ denied by lot on plan description These dtas (\p- \o
can be obtained from title documents or through the

 

 

 

 
  

 

S

 

 

 

 

local government. 4. The above deacipton is for: (tick applicable box)
+ However, ifthe land on which the development is [4(i) the land on which the development is proposed; or
nce cognate na ian aceon fie. [4A (ii) the tand adjoining the water body or watercourse, within which the development is
1 | watercourse) provide - proposed; or
‘0 afotingodacent io ne CL (iii) the water body or watercourse.
im sdonigiadacen nd (ee hr aoton Bay). 5. Shop / tenancy number: 6. Storey / level: 7. Total area of land: (my or ha):
, Advice for completing Q7 - Q7 does if th
development is within a water body or retake ° L = - L um _| ws nn
«Ailee for coma Ae Re aes a2. {8 Local government area in which the land js situated: (eg. Esk, Hervey Bay, Woocen etc.) (i applicable)
1 Note: Aroas below high water mark are not withi .
| pcal governments aa lose paneer under the > ae
| Local Goverment Act 1993. 9. Port authority for the strategic port tand or strategic port land tidal area on which the
| advice for completing Qs - 29 applies i development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)

| putlon! Oda! nea Fare datas ake a
{portland Sal area For mora details refer to Guide 11. |

 

 

 

 

Ffpoam details 10. Existing use of the land: (eg. vacant, single house, shop etc.)
' there is insufficient jailabt details be
_ provided in an attachment tothe application. my | Nee. |

 

t 11. Proposed use of the land: (eg. 6 unit apartment building, 30 lot residential Subdivision, ERA for aquacutture in
i ponds with a total area of 7 ha for which wastes are released into waters etc).

: L2 \exen Res Sence.

 

 

 

 

 

 

{Other applicable parts of Form 1 12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part , etc)

‘Part A must afways be accompanied by other —_—
(Pannen be matey ot Senex =>
{when a part of Form 1 may apply refer to Guide 1,
fApplicant details 13. Applicant's name: ‘15. Contact person:
| Clearly identify who is making the application. The

sritintnced abe eae lta [Dares  Sesomna~ |] [Dies Seconpan |
; When signing and todaing this application 14. Contact number: 16. Facsimile number/e-mail address:

 

i The responsible for ensurl r :

emai pot Kare Teen . [OX Sut Sosa Sauidlsoonlen @ agent tam,
referral agency & the Chief Executive

+ ere eplicel) wl ty on ths formation when 17. Postal address:

pp secntis acme ortat gene Tp Ban WW Neos Sens. ASE

{must be shown, 18. Signature: 19. Date:

1 \E dW a

 

 

 

 

 

 

 

Page 4

INTEGRATED PLANNING ACT 1997

j Land owner's consent (if applicabie)

Section 3.2.1(3) of the [PA prescribes that an
‘application must contain, or be supported by, the
‘wiltien consent of the land owners, if the application
Hnvolves:

|) a material change of use;

(8) reconfiguration of a jot;

(i) work on land below high-water mark & not within a
1 Canal as defined under the Coastal Protection and
: int Act 1995;0r

4) work on rail corridor land defined under the

- Transport Infrastructure Act 1994.

Section 3.8.1(2}(a) of the IPA provides that
‘landowner's consent is pot required for a mobile or
temporary ERA

fromore information refer to Guide 1

| 20. Land owner's consent to the making of this application:

Part A, Version 2.4, 29 May 2006

 

\Sjanature

 

 

 

Name
 Qaeeye Seemed
(ii
wo
Wo

 

 

 

 

 

 

 

 

 

 

 

 

; Resource entitlement ( applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
j Ceglon 3.2.18) of the IPA requires evidence of quarry materia! on State coastal land under the Coastal Protection and Management Act 1995)?
| valve a pesorbed Slae resouror NO -g0 to. 024 (IYES - goto 22
 pplcaion ae habianiten propery made 22, This application is accompanied by evidence: (tick applicable box)
nwitiout evidence of the neue enttement (J (i) of the allocation of, or entitlement to, the resource — attach evidence and go'to Q23(v)
Refor 1 schedule e10 of the iioreted Planning sence (i) the chief executive of the department administering the resource is satisfied the
i i nature of ev it -
ry eerie RI Sekonehe development is consistent with an allocation of, or entitlement to, the resource ~ go
lopment application, :
: C1 (ii) the chief executive of the department administering the resource is satisfied the e@
’ development application may proceed in the absence of an allocation of, or
. entitlement to, the resource —go to Q23 . :
: Advice for completing Q23 __.___ | 23. Evidence of the resource entitlement:
‘rauedunderQ2s(aerGeboe = | —()-Resource entitlement / authority detail (vii) Official stamp of the department
‘The official stamp of the Department of Natural administering the resource (
, Resources, Mines and Water is mandatory where the a &pplicable)
| application involves any water or riverine quarry (i) Name of “aac Officer
* material under the Water Act 2000.
: Section 32.1068) allows the resource manager eto
| re icrantionce may be used. 25 (w) (iii) Position of — Officer
(iv) = of — Officer
(v) Date
(vi) pen date of evidence =—
! Assessment triggers 24. Is the IDAS Assessment Checklist completed and attached to this application?
; This checklist does ot apply ifthe application requires YES (CI NO = the assessment manager may refuse to accept this application on the
{ the completion ‘And B of the F Ul : ger sg
st be complied tor al ter copes : grounds that the eppiication has not been property made ;
25. Plans/drawings/reports accompanying this application: aa

{plans T drawings / reports
| Am applcabon should be accompanied by detalls to

{ support the proposal & enable the assessment

+ Manager, refetral agencies and any person viewing
* the application during public scrutiny or public
notification to understand the scope of the proposal
Bnd any potential impact.

 

 

 

 

 

 

Plan / Drawing / Report Number Title Date
Nekovne feo GA | Aus ‘on.
Ver NMA. Mo.
fil) wend /stH Bueamion | Mo.

(WheExss AdEse u, ‘

 

 

 

PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by Part A
and any other relevant part of Form 1.

 

OFFICE USE ONLY (applicable fo assessment manager's}

 

 

 

 

 

“DATE RECEIVING OFFICER'S v REFERENCE
| FeEe B&O | RECEIVED | 2a/efer 2 oe WANES eel prvre—| Sane | 7] [7128
Notification of Engagement of Private Certifier (Optional format’
To, Couneil. | have been engaged as the private certifier for the building work referred to in this application.

 

 

Date ofengagement / /

Accreditation Number.

Name:

Signature:

 

 

Page 5

INTEGRATED - ACT 1997 _

Part D, Version 2.0, 4 October 2004

  

AN aU 1 pabcia lad hail

_ Material change of use

assessable against a local government’ s planning scheme

 
 
  

 

 

Compietion of afl applicable questions on Past D is mandatory for all applications involving assessment of a

Nature of the application
A development permit authorises

evelopment to occur, while a prefiminary
@pproval fs a step in the approval process
and does not authorise development to occur.

1.

material change of use (MCU) assessable against a local governments planning scheme.

This application is for: (tick 1 or both # appiicable)

Al Pretiminary approval for a material change of use of premises including conceptual
design for any associated works that require approval under the planning scheme (ie.
consideration of the proposal concep)

"AND RC

* (A Development permit for a material change of use of premises including conceptual
’ design for any associated works that require approval under the planning scheme.

 

 

 

 

 

 

 

 

 

 

 

The subject'land 2. How the subject land is identified in the planning. scheme (name the zone, precinct efc.)
For the definition of ‘gross floor area” go t
fhe planning scheme against wich the. [R65 Wen AL . _ ]
application will be assessed. :
3. Existing gross floor area: (# applicable) [ i
4. Are thiere any existing easements on the land?
BNO
C1 Yes- attach plans ofthe locaton and details ofthe purpose of the easement
Material change of use details 5; Details of the change to the use of the land: (eg. vacant land to shopping centre, house to apartment building,
vacant land to industiy (lyre manufacturing) etc.)
at z Pics.
6. Number of employees: . [ ‘|
7. Operating days. andhours: _! : . ; : |.

 

 

teaas building works details (f |g.

. eve .
For the definition of “site cover", “gross floor |g
area’ and “storey” go to. the planhing scheme | “*

. against which ‘the application wil be
assessed. ,

 

Site cover (one eon Bt fom 19-82
Gross floor area: 626.8? - — i . .

Number of on-site car parking spaces: [a = |

 

 

 

 

 

 

 

 

 

~ 110.
4. Number of storeys /' maximum height above natural ground: ;
ee ec
43. Hours and days the use will operate [ mao : ]
* (Associated operational works details |14. Details of associated Operational works (eg. landscaping, cut and ffl, drainage, road works etc.) ~
(if applicable) - : -
PLEASE NOTE

This application cannot be accepted: unless acconipanied by Part Aof Form 1.

The’ assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide’ all applicable information
- fequested by Part A and any ¢ other relevant part of Form 1.

 

 

OFFICE USE ONLY (eppicable to assessment manager)

 

 

 

DATE RECEIVED

NUNBERIS

 

 

 

 

Page 6

   

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007

AN ele DAE 6) ase yeierltey eels

 
 
  

   

_IDAS Assessment
Checklist

(Formerly the “Referrals Checklist’)

 
 

 

IMPORTANT NOTE FOR ALL APPLICANTS:

1

This checklist was formerty referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.

 

 

 

 

2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Council etc.}.

3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application. :

4. — Therefore, the completion of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B onty).

5. tis the responsibility of the applicant to accurately complete this checklist.

6. — Section 2 is mandatory only if the proposed development is located in any part of a wild river area dectared under the Wild Rivers Act 2005.

7, Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.

8. The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.

9. To assist you in answering the following questions a series of guides are available free from the IPA website www.ipa.gld.gov.au. Guide 25 explains the role of the IDAS
Assessment Checkiist in the IDAS application process, and its relationship to the Form 1 development application.

10. Any other parts of Farm 1 that this checklist fequires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www.ipa.did.gov.au.

11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.

SECTION 1 - STATE ASSESSMENT (completion mandatory) -
Note: The following state assessment triggers apply.to development other than for building work assessable against the Building Regulation 2006. wt,

Environmentally relevant activity 1. The application involves: (tick applicable box/es)

For more information refer to Guide 4, Oi) an environmentally relevant activity (ERA) for which a code for environmental compliance

Unless you answered “none of the above” to Qi, \ has not been made - complete Part G of Form 1

the application requires assessment by the i” — . . .

ad¢ninistering authority?, C1 (it) a mobile or temporary ERA for which a code of environmental compliance has not been

If an entity, other than the administering made - complete Part G of Form 1
authority, is the assessment manager for the x (iii) none of the above

application, the administering authority is a
concurrence agency for the application in relation
to this matter.

Note: An application involving ERA 19 and/or 20
will also require completion of Part Kr of Form 4
for approval where an allocation under the Water
Act 2000 is required.

 

 

Continued overleaf

 

PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).

 

OFFICE USE ONLY (applicable to assessment manager)

 

| DATERECEIVED REFERENCE NUMBERIS |

 

 

 

The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.

For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’. .

The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local goverment (for a devolved ERA) or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).

Page 1

Page 7

INTEGRATED PLANNING ACT 1997

State-controlied road matters

For more information refer to Guide 3.

Unless you answered “none of the above” to Q2,
the application triggers referral to the Department
of Main Roads (DMR) as a referral agency.

In Certain circumstances DMR will be an advice
agency, while in other circumstances DMR will
be a concurrence agency.

Schedule 2 of the IP Requlation will assist you to
determine where DMR is an advice or
concurrence agency for the application.

 

2.

IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves: (tick applicable box/es)
C1 (i) development on land contiguous’ to a State controlled road and for -
LD (a) material change of use assessable against the planning scheme;

C1 (b) reconfiguring a fot unless -
« the total number of lots is not increased; and
« the total number of lots abutting the State-controlied road is not increased;

(J (c) operational work (not associated with a material change of use assessable against the

planning scheme or reconfiguring a lot mentioned in (b) above)}—

« associated with access to a State-controlled road; or

« for filling or excavation; or

+ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road. ,

C1 (ii) development on land not contiguous to a State-controlled road and -

1 (a) material change of use -
* assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
(1 (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
~ and exceeding the thresholds set by that schedule;
(1 () operational work (not associated with a material change of use assessable against eo
planning scheme or reconfiguring a lot mentioned in (b) above)-
« assessable against the local government's planning scheme; and
mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.

FE (ii) none of the above

 

~ Clearing vegetation
For more information refer to Guide 12.

Unless you answered “none of the above” to Q3,
the application requires assessment by the
Oepartment of Natural Resources and Water
(NRW).

\f an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in relation
to this matter.

If you ticked Q3(i) or (ii), your application requires|
referral to NRW for assessment regardless of
whether vegetation clearing is proposed or not.

 

The application-involves: (tick applicable box/es)

OO (i) material change of use -

(a) assessable against the planning scheme;

(b) on a lot containing —

* acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« ifthere is no property map of assessable vegetation for the lot - remnant vegetation;

(c) where the existing use of the land is a rural or environmental use; and

(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1

reconfiguring a lot — ,

(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation; @

(b) where the size of the lot before the reconfiguration is 2 hectares or larger;

{c) where 2 or more lots are created; and .

(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1

Oi)

OD (ii) operational work -

(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and

(b) not associated with a material change of use assessable against the planning
scheme mentioned in {i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1

Ri (iv) none of the above.

 

Strategic port land
For more information refer to Guide 11.

Ifyou ticked (i) - the relevant Port Authority is the
assessment manager for the application.

Ifyou ticked (ii) Queensland Transport is a
concurrence agency for the application.

 

The application involves:

C1 (i) development on strategic port land as defined in the Transport infrastructure Act 1994 (TI
Act) - complete Part! of Form 1

(ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 1

mw {iii} none of the above

 

4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - -ifpatot the land is within 100m of the State-controlled road; or that is part of a future State

contolled road.

> Page 2

Page 8

INTEGRATED PLANNING ACT 1997 : IDAS Assessment Checktist, Version 20, 2 April 2007

Acid sulfate soils 5. The application involves development on land situated in an identifiedS local government area
For more information refer to Guide 10. and where the surface of the land is: (tick applicable box)

Unless you answered “none of the above" to 5, (i) below 20m AHDE and the development will involve the excavation of 1000m? or more of
Oona Natural Resources a soil or sediment at or below 5m AHD, or :

(NRW). * (1 (ii) ator below 5m AHD and the development will involve filling the site with 1000m? or more
It an agency other than NRW is the assessment of material :

manager for the application, NRW is an advice

agency ote ppcaton in lation to is [XI (iti) none of the above

matter.

 

 

’ Major hazard facilities or possible 6. Does the application involve a material change of use for a major hazard facility or possible

major hazard facilities major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
For more information refer to Guide 17. KINO

if you answered "YES" to Q6, the application

fequires assessment by the Department of oO YES - complete Part L of Form 1
Emergency Services (DES).

if an agency other than DES is the assessment
manager fos the application, DES is a
Concurrence agency for the application in
Telatlon to this matter.

 

 

Water related development under the |7. The application involves:

Water Act 2000 (1 () operational work, for taking or interfering with water under the Water Act 2000, that is:
For more information about items (a) - (f), refer (tick applicable box/es)

to Guide 15. For more information about item . . ay Aire adi 7
(g), refer to Guide 14 Does my appiication (1 (a) ina watercourse, take or spring, (eg. @ pump, gravity diversion, stream re-direction, weir or
favolve assessment of a referable dam? dam) - complete Part Kz, Ks, Ks, Ke, or Ke of Form 1 whichever is applicable;

Unless you answered “none of the above’ to Q7, 1 (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
the application requires assessment by the .

Department of Natural Resources and Water Ks of Form 1; .

(NRW). (J (c) fora subartesian bore, in declared subartesian area’, or in a certain area covered
It an agency other than NRW is the assessment by a water resource plan, for use for purposes other than stock and/or domestic

Manager for the application, NRWis a .
concurrence agency for the application in USe - complete Part K1 of Form 1;

relation to this matter. C1 (d) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Part K; of Form 1;

(J (e) for taking overland flow water in certain areas covered by a water resource plan
— complete Part Ks of Form 1;

C1 (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kioof Form 1

(1g) for constructing a referable dam or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1: or

iii) none of the above.

Removal of quarry material from a 8. Does the application involve development for the removal of quarry material from a watercourse?

watercourse requiring an allocation notice under the Water Act 2000?
For more information refer to Guide 16. BIN fe)

If you answered "YES" to Q8, the application
requires assessment by the Department of [DYES - complete Parts K; and G of Form 1
Naturat Resources and Water (NRW).

If an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
felation to this matter.

Note: Part G of Form 1 is required to be
completed as the activity of removing quarry
material from a watercourse is also an
Environmentally Relevant Activity (ERA).

 

 

 

 

5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Cairns, Calliope, Caloundra, Cardwell, Carpentaria, Cock,
Cooloata, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vate, Momington, Noosa, Pine Rivers,
Redcliffe, Redtand, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.

Austrafian Height Datum (AHD).

The declared ground water areas are Iisted in Guide 13 Development ip a declared catchment area,

Referabte dam is defined under the Water Act 2000. .

Watercourse is defined in sch 10 of the IPA.

wan.9

Page 3

Page 9

INTEGRATED PLANNING ACT 1997
Operational work that is tidal work or
work in coastal management district
For more information refer.to Guide 18. For
more information about prescribed tidal work in
locat govemment tidal areas refer to Guide 24.

 

Untess you answered “none of the above” to 09,

the application requires assessment by the
Environmental Protection Agency (EPA).

ff an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
felation to this matter.

Local government is the assessment manager
for all prescribed tidal work.

Operational work below high water
mark

For more information refer to Guide 18. For
more information about prescribed tidal work in
local goverment tidal areas refer to Guide 24.
Unless you answered “none of the above" to
Q10, the application triggers referral to
Queensland Transport (QT) (Maritime Safety
Qig) as a concurrence agency.

Local govemment is the assessment manager
for ail prescribed tidal work.

 

9.

IDAS Assessment Checklist, Version 20, 2 Aprit 2007

The application involves operational work that is: (tick the applicable box/es}

Di

Oi
D iii

XS civ)

tidal work" as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF

tidal work that is prescribed tidal work" other than in a canal’? -complete Part P of Form 1; oF

carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) to {i) below are ticked.

(1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;

constructing a canal12 intended to be connected to tidal waters;
constructing an artificial waterway;
reclaiming land under tidal water;
disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark,
removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
@

OD (b)
Ci)
Od)
Hee)
mG)
Dig)

On)
Di

constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

none of the above.

10. The application involves operational work that is: (tick the applicable box/es)

Ot

tidal work") as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; or

C1 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; OF .
OO (ii) carried out within a coastal management district'S under the Coastal Act and for -

KE tiv)

(1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
M of Form 7;

CD (b) reclaiming land under tidal water - comptete Part M of Form 1; oF

LJ (©) constructing a canalt2, if the canal is associated with reconfiguring a lot -

complete Part M of Form 1;
none of the above.

 

 

Coastal management

For more information refer to Guide 18.

Unless you answered “none of the above” to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).

if an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.

 

10 Tidal work is defined in sch 10 of the IPA.

 

11.

The application involves: (tick the applicable box/es)

Oi
ii)

Dai
Ow)
Kw

a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district*® 5

a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is —

« the construction of a new premises with a GFA'® of at least 1000m2
« the enlargement of the GFA of existing premises by more than 1000m2

reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district

reconfiguring a lot’? assessable under schedule 8 of the IPA and in connection with
the construction of a canal12 - complete Part M of Form 1

none of the above

11 Prescribed tidal work is defined in the Coastal Protection and Management Requiation 2003 and includes certain tidal wosks completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Requiation 2003 and includes certain tidal works completely or partly within a local government Udal area.

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coasta) management district under section 47(2) of that Act.

16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an atticial waterway, must be
accompanied by the application for the operational works to construcl the artificial waterway.

Page 4

Page 10

&

INTEGRATED PLANNING ACT 1997

Development within the limits of a

port

For mose information refer to Guide 18. For

information about prescribed tidal work refer to

Guide 24.

H you answered “YES” to Q12, the application

tiggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is —

© within 200m of a shipping channel or an enty
and exit shipping corridor for the port _

* within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds; -

© within 1000m of a planned port facility
identified in a land use plan approved under
the Transport Infrastructure Act 1994,

{mall other situation the Port Authority is an

advice agency.

IDAS Assessment Checklist, Version 20, 2 April 2007
12. Does the application involve development below high water mark’? and within the limits of a port
under the Transport Infrastructure Act 1994?

NO
[1 YES - complete Part M of Form 1, or Part P of Form 4 if the work is prescribed tidat work

 

 

Marinas

For more information refer to Guide 18, For
information about whether a marina is prescribed
tidal work refer to Guide 24, The local _
goverment is the assessment mahager for all
prescribed tidal work.

{fyou answered "YES" to Q13, the application
triggers referral to Queensland Fire and Rescue

Sesvice as an advice agency.

 

 

13. Does the application involve operational work that is tidal work for a marina’? with more than 6

esse! berths?
NO
YES - complete Part M of Form 4, or Part P of Form 1 if the tidal work is prescribed tidal work

 

 

Tidal works in strategic port Jand tidal
areas

For rhore information refer to Guide 18,

Unless you answered "NO to Q14, the retevant
Port Authority is the assessment manager for the

application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the apptication.

Heritage
For fusthes information refer. to Guide 19.
lf you answered "YES’ to Q15, the application

triggers referral to the Queensland Heritage
Council as concurrence agency for the
application.

Unless you answered "none of the above” to
Q15(b), the application involves referral to the

Environmental Protection Agency as an advice
agency for the application

NO

14. Dogs the application involve tidal works within a strategic port land tidal area20?
Bro. - complete Part M of Form 1

15. Does the application involve development in a heritage registered place as defined under the -
Queensland Heritage Act 1992?

yw NO
[YES - complete Part C of Form 1

15(b)The application involves: (tick applicable boxes) .

C(i) — amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992; :
reconfiguring a lot if the lot shares a common boundary with a protected area or
Tegistered place under the Queensland Heritage Act 1992;
none of the above.

ow
Kl diy

 

 

Declared catchment areas

For more information, including a list of the
declared catchment areas withln Queensland,
fefer 10 Guide 13.

Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

lf an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

 

16, The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
D(i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;

Dii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;

Bi (ii) none of the above :

 

 

18 High water mark.is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mask at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pottution) Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Page 11

INTEGRATED PLANNING ACT 1997
Contaminated fand

Applications involving material change of use
and/ or reconfiguring a lot may trigger this
feferral.

For more information refer to Guide 5.

Unless you answered “none of the above” to
Q17, the application requires assessment by the
Environmental Protection Agency (EPA). ff an
agency other than EPA is the assessment
manager for the application, EPA will be a
concurrence agency for the application in
felation to this matter.

7.

IDAS Assessment Checklist, Version 20; 2 April 2007
The application involves: (tick the applicable box/es)
[1 () reconfiguring a lot for which all of part of the premises are —
(a) premises mentioned in the IPA, schedule 8, part 1, table 2-
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
{b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
OO (ii) a material change of use ~
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
{b) assessable against the planning scheme and if all or part of the premises is in an area
. for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 7
[X{ (ili) none of the above

 

/ Electricity infrastructure
For more information refer to schedule 2of the IP
Requlation.

Unless you answered “none of the above’ to
Q18, the application triggers referral to the

agency to. which the easementis granted i in

favour of as advice agency.

18,

The application involves: (tick the applicable box/es)

(1 (i) reconfiguring a fot where any part of the lot is - :

* subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or

« situated within 100m of a substation site;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if -

« any part of the premises is subject to an easement in favour of a distribution entity or

* transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and

any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;

a material change of use, assessable against a planning scheme and not associated

with reconfiguring a lot if any part of the premises is situated within 100m of a Substation

site;

C1 (iv) operational work that is filling or excavation assessable against the planning scheme,

not associated with reconfiguring a lot, if ~

+ any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;

the work is located wholly or partly within 10m of a substation site;

[XI (v)_ none of the above.

Oil)

Di

 

 

Land designated for community
infrastructure
Applications involving development on land
designated for community infrastructure may
trigger this referral.
For more information refer to schedule 2 of the
IP Requtation.
Ifyou answered "YES" to Q19, the application
fequires assessment by the chief executive of
the department administering the Act authorising
* the development for the designated purpose.
{fan agency other than the designator is the -
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.

 

Does the application involve development assessable against the planning scheme and on lane
designated for community infrastructure?

{i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development —

{a) for the designated purpose; or

{b) carried out by, or on behalf of, the designator.
J No
OC yYes

 

Page 6

Page 12

INTEGRATED PLANNING ACT 1997

SEQ Regional Plan

For more information refer to schedule 2 of the
IP Reguiation.

Refer to Chapter 2, part 5A and schedule 10 of -

the Integrate 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.

Unless you answered “none of the above’ to
Q20, the application requires assessment by the
Office of Urban Management (OUM).

IDAS Assessment Checklist, Version 20, 2 April 2007

20. The application involves (tick applicable box/es) -
(1 (i) amaterial change of use of premises ~

(a) ina Major Development Area in the Urban Footprint for -
D) @)  anurban activity -
(1 in an area inclided in a structure plan where the IPA, section 3.1.6
applies;
. © inan area not included in a structure plan where -
« the IPA, section 3.1.6 applies to the application for the material change
of use; or

« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
* impact assessment is required under the relevant planning scheme

(2 (ii) intensive animal husbandry, or

‘D iii) residential development involving a rural residential purpose

(b) in the Regional Landscape and Rural Production Area for -
(9 (i) an urban activity and not specified irr section 2. 4(2); or
C1] (ii) residential development involving a rural residential purpose and not
. Specified in section 2.6(2)
{c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);

(d) in the Investigation Area for -
( (i) an urban activity and not specified in section 2.10(2);
OO (i) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
(J (ii) intensive animal husbandry

C1 (ii) reconfiguring a tot-

On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).

rl (iii) none of the above

 

Fisheries matters
For more information refer to schedule 2of the IP

_ Regulation.

Untess you answered “none of the above” to

* Q21, the application requires assessment by the

Oepartment of Primary Industries and Fisheries
(DPI8F),

If an agency other than OPI8F is the assessment
manager for the application, DPI8F is a
concurrence agency for the application in
elation to items (i) - (v) and an advice agency
In relation fo item (v).

 

21. The application involves: (tick the applicable box/es)

C1 (i
C1 (ii)

Oi)

an assessable material change of use for aquaculture - complete Part O; of Form 1;

assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 7;

assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;

assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part Op of Form 1;

development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;

none of the above.

Page 7

Page 13

INTEGRATED PLANNING ACT 1997
Integration of land use and public
transport

For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Requlation.
Unless you answered “none of the above”, the
appkication triggers referral to OT as a
concurrence agency.

 

IDAS Assessment Checklist, Version 20, 2 April 2007

22. The application involves: (tick the applicable box/es)—

LI (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the !P Regulation and exceeding the thresholds set by that
schedule.

D (i) reconfiguring a lot—

(a) __ onland that is completely or partly within a public transport corridor, and the
total number of lots increases; :

[1 (b) _ ontand that is completely or partly within a future public transport corridor or
an airport's public safety area;

(1 (c). ontand that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;

(0 @) _ fora residential purpose within the 25 ANEF contour for an airport;

[J (e)} fora residential purpose resulting in 100 or more allotments.

C7 (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in {i) above or reconfiguring a lot mentioned i in (ii)
above, on land that—

(1 (a) _ is completely or partly within a public transport corridor or a future public
' : transport corridor;
{1 (b) will result in work that encroaches into an airport's operational airspace.
Of civ) none of the above. . @ :

 

Railway safety and efficiency

For more information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the IP Requlation.
Unless you answered “none of the above”, the
application triggers referral to QT as a
concurrence agency.

 

23.

The application involves: (tick the applicable box/es)—
Di {i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
_ schedule.
C1 (ii) reconfiguring a lot—

C1] (a) on land that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;

(J) (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m2 or

: greater;

(1 (c) _ onland that abuts rail corridor land, commercial corridor land or future railway
{and, and the total number of lots increases;

(J (d)_— ontand that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;

Ce) _ onland that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;

[J (f for a residential purpose resulting in 100 or more allotments.

C (iii) operational work assessable against the planning scheme, but not associated nit a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—

C1 (a) is completely or partly within rail corridor land or commercial corridor tand, and
the work is not for rail transport infrastructure or other rail infrastructure;

[J (b) _ is completely or partly within future railway land, or a railway tunnel easement;

C1 (c) abuts rail corridor tand, commercial corridor land or future railway land, and

the work is within 25m of the railway boundary.
x {iv) none of the above.

 

 

Moonie to Brisbane pipeline

For more information refer to schedule 2of the IP
Regulation.

Unless you answered “none of the above", the
application triggers referral to the holder of
pipeline cence No 4 issued under the Petroleum;
‘Act 1923, currently Santos QNT Ply Ltd, for
advice.

 

24.

The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable box/es)—

LI (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.

OO (ii) reconfiguring a lot

(ili) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the

work is located wholly or partly in the easement.
Bw none of the above.

 

Page 8

Page 14

INTEGRATED PLANNING ACT 1997

Koala habitat area

For more information, refer to Guide 26 and
schedule 2 of the IP Requtation,

Unless you answered "none of the above’, the
application requires referral to the Environmentat
Protection Agency as a concurrence agency.

Wild river area
For more information, refer to Guide 27

Ifyou answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the proposed
development is “prohibited” in a wild river area.
Note: Development can be "prohibited’ in a wild
fiver area because the application cannot be
accepted by the assessment manager,

IDAS Assessment Checklist, Version 20, 2 April 2007
25. The application involves: (tick the applicable box/es}—
DO) amateriat change of use of premises in a koala conservation area or koala
. _ Sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in - / :
D1) {a) clearing of native vegetation over an area greater than 2500m?;
(2 (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;
(1 (c) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m?;
(71 (d) extracting gravel, rock or sand from an area'greater than 5000mz2,
Cle) excavating or filling an area greater than 5000m?,
C1 (f) additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.

C1 (ii) reconfiguring a tot in a koala conservation area or koala sustainability area that will

result in -
C1 (a) an increased number of lots;
[J (b) clearing of native vegetation over an area greater than 2500m?.

C1 (iii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m2.

C1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -

(J) (a) clearing of native vegetation over an area greater than 2500m?:
{1 (b) extracting gravel, rock or sand from an area greater than 5000m?;
(3 (ec) excavating or filling an area greater than 5000m2,

(v) none of the above.

26. Does the application involve development in a wild river area declared under the Wild Rivers Act
» 2005?

PaNo
YES

 

 

Preliminary Approval

Ifyou answered YES to Q27, the application
triggers referral to the Department of Local

Goverment, Planning, Sport and Recreation as
an advice agency.

27. Does the application involve a development for which preliminary approval is sought under
Section 3.1.6 of the Integrated Planning Act 1997?

Bil No
Cres

 

 

Wetlands

Domestic activity means the construction or use
of a single residence on a tot and any reasonably
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretaker’s residence, granny flat, building or
structure used for a home business.

Note: Wettand is defined in the Integrated
Planning Regulation 1998.

Unless you answered "none of the above" to
Q28, the application involves referral to the

Environmental Protection Agency as an advice

agency for the application.

 

28. The application involves: (tick the applicable boxes} -
C1 (i) a material change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;
C1 (ii) reconfiguring a lot -
In or within 100m of a wetland that will result in
(1 (a) more than 10 lots being created; or
b) lots less than 5 hectares;

Ci
ot (iii) none of the above

 

Page 9

Page 15

INTEGRATED PLANNING ACT 1997
Conservation Estate

Urban purposes is defined in the Integrated
Pianning Act 1997 as “purposes for which tand is
used in cities or towns, including residential,
industrial, sporting, recreation and commercial
purposes, but not including environmental,
conservation, rural, natural or wiklemess area
purposes”.

Unless you answered “none of the above" to
Q29, the application involves referral to the

Environmental Protection Agency as an advice
agency for the application.

 

"_IDAS Assessment Checklist, Version 20, 2 April 2007
29. The application involves: (tick the applicable box/es)—
(C1 (i) a material change of use for urban purposes that is in or within 100m of any of the
following — . .
(a) a protected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;; :
{_] (b) a State forest or timber reserve under the Forestry Act 1959;
(1 (c) amarine park under the Marine Parks Act 2004;
L) @) a tecreation area under the Recreation Area Management Act 1988;
Cle) a world heritage area listed under the World Heritage Convention;
{1 (f) Brisbane forest park under the Brisbane Forest Park Act 1977.
D1 (ii) reconfiguring alotif-
(1 (a) any part of the tot is situated in, or within 100m of, any of the following -
(i) aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
DC (ii) a State forest or timber reserve under the Forestry Act 1959;
C1 (iii) ~amarine park under the Marine Parks Act 2004;
Cl (iv) arecreation area under the Recreation Area Management Act 1988;
(1 (\)_— aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
[J (b) the reconfiguration invelves more than 10 lots being created, or any lot
resulting from the reconfiguring is less than Sha; @
(iii) none of the above.

 

Page 10

Page 16

|

INTEGRATED PLANNING ACT 1997

Wild River Area

It the responsibility of the applicant to
determine if the development is propesed in
a wild river area.

information about wild river areas including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website www.new.qld.gov.au or
contacting the department by email on:

Wild [email protected]

Note on Referrals

Referrals for development in a wild river area
(other than for agricuttural activities and animal
husbandry activities) are not changed from the
existing referral arrangements,

Notes on development assessable
against the Wild Rivers Code

For information regarding development in a wild
fiver area, see the relevant wild river declaration
and Guide 27, The relevant wild river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and in some
cases which types of development are exempt
from wild river requirements,

The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild river areas. The relevant
declaration will provide the information applying
to each witd river area.

Applications for some new developments will not
be accepted if the proposed development is in a
high preservation area (HPA). Most applications
for development activities which may be made
including those in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated in a relevant
wild river declaration,

 

Environmentally relevant activities *
({ERAs) in a designated urban area

Ifyou answered YES, your application for an
ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
Jemaining questions in Section 2.

Ifyou answered NO to Q2, please complete the
Temaining questions in Section 2.

SECTION 2 = ASSESSMENT IN A WILD RIVE
(completion mandatory if the proposed development is located in a wild river area) «

IDAS Assessment Checklist, Version 20, 2 April 2007

R AREA

 

1. Which wild river area is the development proposed in?

 

 

 

The proposed development is to.be located in: (tick the applicable boxes)

(Ji) ahigh preservation area (HPA);
Cc) ii) a preservation area (PA) ;

CO ili) a wild river floodplain management area (FMA);

O iv) a wild river nominated waterway;
Dwa designated urban area (DUA).

%

Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?

i) An ERA 28 or ERA 14: or

it) Alevel 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
oO YES (ensure you have completed Part G of Form 1)

[xt No

J

}

 

 

. development where wild river requirements

Clearing native vegetation

IFYES, there are a limited number of purposes
for which an application to clear native
vegetation may be accepted in a HPA. See
Guide 27 for a list of relevant purposes for
which an application may be made in a HPA.

If YES and you ticked Q4 box i) the application
may be made and is assessable against the Wild
Rivers Code. If YES and you ticked Q4 box ii)
the application will not be accepted.

Note: If clearing native vegetation is in a PA,
there are no wild river requirements and
provided there are no other aspects of this

apply, do not complete the remaining questions
in Section 2.

 

Is the application operational work for clearing native vegetation in a HPA?

fi] No

If YES, is the clearing?

oO i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or

oO YES (ensure you have completed Part J of Form 1)

C1 ii) in aHPA outside a registered area of agriculture?

 

Page 11

Page 17

INTEGRATED PLANNING ACT 1997

Works in tidal areas, coastal
management districts and fish habitat
areas

Ifyou answered YES to Q5, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.

you answered YES to Q5 and ticked box i) in
Q6, your application is required to be referred to
the EPA.
Note: If specified works are proposed in a local
goverment area, itis prescribed tidal work - the
relevant local government will be the
assessment manager with the EPA as a
concurrence agency
Mfyou answered YES to Q5, and ticked box ii) or
iti) in Q6, your application requires referral to
OPIF.

"ff you answered NO to Q65 and ticked box i) in
Q6, the application will not be accepted.

Ifyou answered NO to Q5, ticked box ii} in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a
‘téquired permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
not be accepted.

If you answered NO at Q5 and ticked box iil) in
Q6, the application may be made if the works are
in a PA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.

For more information about specified works refer
to Guide 27

 

Residential, commercial or industrial
development

If you answered YES to Q7, your application is
not subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
river declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.

Hf you answered NO to Q7 and ticked either box
i) or ii) in Q8, the assessing agency is the
relevant local government. The application must
be assessed against and must comply with the
Wild Rivers Code.

6.

7.

IDAS Assessment Checklist, Version 20, 2 April 2007 :
Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

FXno Cres

The application is for one or more of the following:

OD i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); OF

(ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part Oz of Form 1); OF ‘

(J ifi) Building or operational works in a fish habitat area (ensure you have completed Part Oz of Form 1).

Is the application for residential, commercial or industrial development if a designated urban

area?
CIno [x] YES

if NO, does the application for residential, commercial or industrial development involve:

C] i) a material change of use made assessable in a local government planning scheme
(ensure you have completed Part D of Form 1); or

(J ii) operational works associated with reconfiguring a lot (ensure you have completed Part F

of Form 1).
@

 

Animal husbandry activities

lf you answered YES to Q9 your application
fequires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for animal husbandry
activities will not be accepted if proposed ina
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.

Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?

ReINo (1) YES (ensure you have completed Part R of Form 1 )

 

 

Agricultural activities

\fyou answered YES to Q10, your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for agricultural activities wil
not be accepted if proposed in a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
27.

The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.

 

10.

Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
a PA?

Rin jo

If YES is the application for:
(-] i) a material change of use; or
CL it) operational works.

oO YES (ensure you have completed Part Q of Form 1}

 

Page 12

Page 18

INTEGRATED PLANNING ACT 1997

Works that take overland flow water | 12.
The relevant wild river declaration will state

works that take overland flow water are either

self assessable of assessable, or are exempt

from wild river requirements. 43.

Ifyou ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

if you ticked Q13 il) an application is not required
to be made however the works must comply with
the relevant sel-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

Ifyou Gcked Q13 fil} your application is not
subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

IDAS Assessment Checklist, Version 20, 2 April 2007
Dees the application involve works that take overland flow water in a HPA or an FMA?

fkINo CL YES (ensure you have completed Part Ky of Form 1)

IFYES, is the application for works stated in the relevant wild river declaration to be?
(Ji) assessable works ,

(7 ii) self-assessable works

oO iti) exempt works

 

Works that interfere with overland 1
flow water

The relevant wild river dectaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.

Hf you ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

ityou ticked Q45 i} an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

if you ticked Q15 iii) your application is not
Subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt wilt not be accepted.

5.

Does the application involve works that interfere with overland flow water in a FMA?
xno | YES (ensure you have completed Part Kio of Form 1)

If YES, is the application for works stated in the relevant wild rivers declaration to be?
(1) assessable works .

(J ii) set-assessable works

CD iil) exempt works

 

 

Waterway barrier works 1
Applications for building or raising waterway
barrier works in a HPA will not be accepted.
Ifyou answered YES to Q16, your apptication
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

6.

Does the application involve building or raising waterway barrier works in a PA?
KINo O YES (ensure you have completed Part Oz of Form 1)

 

 

Aquaculture (non ERA) 1
Applications for aquaculture in a HPA will not be
accepted,

If you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

Does the application involve aquaculture in a PA?
PxTNo Clyes (ensure you have completed Part O; of Form 1)

 

 

Works that interfere with waterina | 1
watercourse

Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in @ watercourse {including dams or weirs,
stream realignment or stream diversion) will not} 4
be accepted.

In a PA, applications for instream dams and
weirs may be accepted in nominated waterways,
if you licked box ii) in Q49, your application will
not be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.

More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
www.nnw.qid.gov.au or contacting the
department by email on:

wild [email protected],au.

 

Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

ENo YES (ensure you have completed the relevant Part K of Form 1):

IF YES,
oO i) The application is for an instream dam or weir: or

o il) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

 

Page 13

Page 19

INTEGRATED PLANNING ACT 1997
Environmentally relevant activities

Most applications for an ERA in a HPA will not
be accepted. Applications which may be made
Tequire referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local government (see EPA website for more
information on devolved ERAs)

Wyou answered NO to Q20 you do not need to
complete Qs 21-24.

if you answered YES to Q20 and the
development is in a PA, your application must be
assessed by the administering authority?*
against the Wild Rivers Code and must comply

. with the code, unless the proposal is for
development where an appfication will not be
accepted, or is exempt from wild river
fequirements (see Q2}. You will be able to
determine if an application will not be accepted
for the development by answering Q21 - Q24.

Ifyou answered NO to Q21, you do not need to
complete Q22. if you answered YES to Q21 you
are required to complete Q22.

if you answered NO to Q22, the application will ©
not be accepted. H you answered YES fo Q22,
the application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.

Ifyou answered NO to Q23 and the development
is proposed in the HPA the application will not be
accepted. If you answered YES to 023, the
application must be assessed by the EPA or
NRW {as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.

If you answered YES to Q24 the application will
not be accepted. If you answered NO to 024,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.

Exempt ERAs in a designated urban
area

If the devetopment is proposed in a designated
urban area there may be no wild river
requirements. See Section 2 Q2.

Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code {other than exempt ERAs in a
designated urban area),

20.

21,

22.

24.

Doés the application involve an ERA?

DYNO

Is the application for an ERA 20 instream?

Xx] NO (yes

IDAS Assessment Checklist, Version 20, 2 April 2007

QO YES {ensure you have completed Part G of Form)

\s a quarry allocation notice held for the proposed ERA 20 instream?

[XI] No ClYes ©

Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, {and is for specified works or a residential complex)

ii) an ERA 19 (dredging)

iti) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)

iv) an ERA 22 (out of stream)

[XJ No Clyes

Is the proposed development for ERA 20 (out of stream) and;

— inaFMA; and
— notlow impact; and

— not for a residential complex in the area, or for specified works.

[XIno Dyes

 

 

Documentation

tfyou answered NO to Q25, your appficaton
may be subject to an information request and
processing of the application may be delayed.

 

25. Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirement my
a ne out in the relevant part/s of the Wild Rivers Code?

NO (Yes

 

11 The administering authority may be either the EPA, or if devolved or delegated, the local govemment, DPIF or NRW.

Page 14

Page 20

INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 20, 2 April 2007

 

SECTION 3- BUILDING REFERRALS (completion not mandatory” Zz o 7

a8

 

Below is a list of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the IDAS
Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an
application for building work assessable against the Building Regulation 2006 only.

 

 

 

 

 

 

Special fire services - generally 1. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For mora information go to schedule 2 table 1 and requires special fire services mentioned in schedule 2A part 1 of the integrated Planning Regulation 1998
Schedute 2A of the [P Requtation. (IP Regulation) or includes an altemative solution assessed against the performance requirements of the
Assessment period 15 days. No response is a Building Code of Australia.

deemed refusal.

Fire safety for budget accommodation |2. An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work
For more information go to schedule 2 of the IP the subject of the application requires the installation of a fire safety system for a budget accommodation
Regutation building.

Spray painting 3. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency
For more information go to schedule 2 af the IP if the application involves a workplace incorporating spray painting.

Reautation :

Retail meat premises 4, An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a
For more information go to schedule 2 of the IP retail meat premises.

Regulation

Private health facilities 5. An application may trigger referral to the Department of Health as a concurrence agency if the application
For more information go to schedule 2 of the 1P involves a private health facility.

Regulation

Workplace area less than 2.3m? 6. _ An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the
For more information go to schedule 2 of the IP application involves a work place area less that 2.3m?.

Regu lation

 

™

Land contiguous to a State-controlled An application may trigger referral to the Department of Main Roads as a concurrence agency or advice
road agency if the application involves !and contiguous to a State-controlled road.

For more information go to schedule 2 of the IP
lati

 

Pastoral workers accommodation 8. An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency

 

 

 

 

 

 

 

 

 

For more information go to.schedute 2 of the IP if the application involves pastoral workers accommodation.

Requlation

Child care centre 9. An application may trigger referral to the Department of Communities as a concurrence agency if the

For more information go to schedule 2 of the IP application involves a childcare centre.

Reautation

Coastal development 10. An application may trigger referral to the Environmental Protection Agency (EPA) as a concurrence agency

For mote information go to schedule 2 of the IP if the application involves tand completely or partly seaward of a coastal building line?2.

Heritage 11. An application may trigger referral to the Heritage Council as a concurrence agency if the application

For more information go to schedule 2 of the IP involves a heritage registered place.

Regutation :

Fisheries matters 12. An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a

For more information go to schedule 2 of the IP concurrence agency if the application involves assessable building work in a declared fish habitat area; or

Regulaton as an advice agency if the application involves assessable building work on land that adjoins a declared fish
habitat area.

Integration of land use and public 13. An application may trigger referral to Queensland Transport as a concurrence agency if the application

transport involves existing or future public transport corridors, or airport operational airspace?3.

For more information go to schedule 2 of the iP

Regulation

Railway safety and efficiency 14. An application may trigger referral to Queensland Transport as a concurrence agency if the application

For more information go to schedule 2 of the IP involves future railway land.

Requlation .

 

NOTE:. CONCURRENCE AGENCY ASSESSMENT PERIODS

The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed
time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all
other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed
refusal. However for amenity and aesthetics impact of particular building work for a single detached class 1a or class 10 building or structure (15), no
response is taken to be a deemed approval.

 

 

Amenity and aesthetic impact of 15. An application will trigger a referral to the local government if it is :

particular building work for single ¢ fora single detached class 1 building or class 10 structure; and.

detached class 1 building or class 10 «the local government has declared by resolution the following:

building or structure — the appearance of the building or structure will have an extremely adverse impact on the amenity of
For more information go ta schedule 2 table 1 of the the locality; and

IP Requlation. ~ the appearance of the building or structure would be in extreme conflict with the character of the
Assessment period 15 days. No response is a locality

deemed approval. .

 

 

2 Coastal building fines are prescribed under the Coastat Protection and Management Act 1995.
® Operational airspace is as defined in State Planning Policy 1402 “Development in the Vicinity of Certain Airports and Aviation Facilities”.
Page 15

 

Page 21

 

INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

 

 

 

 

 

 

Whether paiticular buildings may be | 16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a

occupied for residential purposes feferral to the local government as the concurrence agency.

For more information go to schedule 2.table 1 of the

{P Regulation.

Assessment period 15 days. No response is a

deemed refusal.

Design and siting 17. An application may trigger referral to the local government as the concurrence agency if the building work

For more information go to schedule 2 tabte 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.

IP Requtation. 18. An application may trigger referral to the local government as the concusrence agency if the building work

Assessment period 5 days. No response is a does not comply with the qualitative statement for building clearance and site cover.

deemed refusal. 49. An application may trigger referral to the local government as the concurrence agency if the building work
. does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland

Development Code, part 11 or 12.

Fire safety in particular budget 20. An application may trigger referral to the local government as the concurrence agency to determine the

accommodation buildings building will comply with the fire safety standard under the Building Act 1975 when the building work has

For more information go to schedule 2 table 1 of the been completed.

IP Regulation,

Assessment period 15 days. No response is a

deemed refusal. -

Higher risk personal appearance 21, An application may trigger referral to the local government as the concurrence agency to determine if the

services building work

For more information go to schedule 2 table 1 of the * complies with the performance criteria of the Queensland Development code part 15; and

{P Requiaton and the QDC part 15. ¢ the work does not comply with an acceptable solution stated in the part.

Assessment period 15 days, No sesponse is a

deemed refusall. .

Building work for residential service | 22. An application for building work for premises in which residential care service under the Residential

For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, of is proposed to be conducted, will trigger

{P Regulation and the QDC part 20. teferral to the local government as the concurrence agency.

Assessment period 15 days. No response is 2

deemed refusal,

Building work for removal or 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger

rebuilding feferral to the local government as the concurrence agency.

For mare information go to schedule 2 table 1 of the

IP Regulation.

Assessment period § days. No response is a

deemed refusal. :

Building work for rainwater tank in 24: An application may trigger referral to the local government as the concurrence agency to determine if the

designated rainwater tank area
For more information go to schedule 2 table 4 of the
IP Regulation and the QDC part 2.

Assessment period 15 days. No response is a
deemed refusal.

 

building work or structure complies with the relevant performance criteria if -

e Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and

e Under the Queensland Development Code, part 25; the rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

 

Page 16

Page 22

 

 

 

 

 

 

 

SOUTH ELEVATION

       

 

 

AL

NoertH ELEVATION

 

 

 

 

 

 

 

 

  

| PROPOSED SNOWDEN RESIDENCE
LOT 817 THE PROMONTORY NOOSA WATERS

SCALE |:1a0 LUE NOT
GAEY GEOCGE O¢Slarl GOOF

Page 23

@

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

- WEST ELEVATION,

PROPOSED SHOWDEN RESiCENCE
LOT BIT THE PROMOHTORY PlOOSA WATERS
SCALE (1100 ‘ AUG 'OT
GABE GEORGE PESIGN Groot

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1728 - MCU - Detached House [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.