INTEGRATED PLANNING ACT 1997

Development within the limits of a

port

For mose information refer to Guide 18. For

information about prescribed tidal work refer to

Guide 24.

H you answered “YES” to Q12, the application

tiggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is —

© within 200m of a shipping channel or an enty
and exit shipping corridor for the port _

* within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds; -

© within 1000m of a planned port facility
identified in a land use plan approved under
the Transport Infrastructure Act 1994,

{mall other situation the Port Authority is an

advice agency.

IDAS Assessment Checklist, Version 20, 2 April 2007
12. Does the application involve development below high water mark’? and within the limits of a port
under the Transport Infrastructure Act 1994?

NO
[1 YES - complete Part M of Form 1, or Part P of Form 4 if the work is prescribed tidat work

 

 

Marinas

For more information refer to Guide 18, For
information about whether a marina is prescribed
tidal work refer to Guide 24, The local _
goverment is the assessment mahager for all
prescribed tidal work.

{fyou answered "YES" to Q13, the application
triggers referral to Queensland Fire and Rescue

Sesvice as an advice agency.

 

 

13. Does the application involve operational work that is tidal work for a marina’? with more than 6

esse! berths?
NO
YES - complete Part M of Form 4, or Part P of Form 1 if the tidal work is prescribed tidal work

 

 

Tidal works in strategic port Jand tidal
areas

For rhore information refer to Guide 18,

Unless you answered "NO to Q14, the retevant
Port Authority is the assessment manager for the

application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the apptication.

Heritage
For fusthes information refer. to Guide 19.
lf you answered "YES’ to Q15, the application

triggers referral to the Queensland Heritage
Council as concurrence agency for the
application.

Unless you answered "none of the above” to
Q15(b), the application involves referral to the

Environmental Protection Agency as an advice
agency for the application

NO

14. Dogs the application involve tidal works within a strategic port land tidal area20?
Bro. - complete Part M of Form 1

15. Does the application involve development in a heritage registered place as defined under the -
Queensland Heritage Act 1992?

yw NO
[YES - complete Part C of Form 1

15(b)The application involves: (tick applicable boxes) .

C(i) — amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992; :
reconfiguring a lot if the lot shares a common boundary with a protected area or
Tegistered place under the Queensland Heritage Act 1992;
none of the above.

ow
Kl diy

 

 

Declared catchment areas

For more information, including a list of the
declared catchment areas withln Queensland,
fefer 10 Guide 13.

Unless you answered “none of the above" to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).

lf an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.

 

16, The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
D(i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;

Dii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;

Bi (ii) none of the above :

 

 

18 High water mark.is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mask at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pottution) Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1728 - MCU - Detached House [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.