Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

07/1728 - MCU - Detached House [As Published] · 132007.1728

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Works that take overland flow water | 12.
The relevant wild river declaration will state

works that take overland flow water are either

self assessable of assessable, or are exempt

from wild river requirements. 43.

Ifyou ticked Q13 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

if you ticked Q13 il) an application is not required
to be made however the works must comply with
the relevant sel-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

Ifyou Gcked Q13 fil} your application is not
subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

IDAS Assessment Checklist, Version 20, 2 April 2007
Dees the application involve works that take overland flow water in a HPA or an FMA?

fkINo CL YES (ensure you have completed Part Ky of Form 1)

IFYES, is the application for works stated in the relevant wild river declaration to be?
(Ji) assessable works ,

(7 ii) self-assessable works

oO iti) exempt works

 

Works that interfere with overland 1
flow water

The relevant wild river dectaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.

Hf you ticked Q15 i), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

ityou ticked Q45 i} an application is not required
to be made however the works must comply with
the relevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

if you ticked Q15 iii) your application is not
Subject to wild river requirements.

Applications for development that is other than
that stated to be assessable, self-assessable or
exempt wilt not be accepted.

5.

Does the application involve works that interfere with overland flow water in a FMA?
xno | YES (ensure you have completed Part Kio of Form 1)

If YES, is the application for works stated in the relevant wild rivers declaration to be?
(1) assessable works .

(J ii) set-assessable works

CD iil) exempt works

 

 

Waterway barrier works 1
Applications for building or raising waterway
barrier works in a HPA will not be accepted.
Ifyou answered YES to Q16, your apptication
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

6.

Does the application involve building or raising waterway barrier works in a PA?
KINo O YES (ensure you have completed Part Oz of Form 1)

 

 

Aquaculture (non ERA) 1
Applications for aquaculture in a HPA will not be
accepted,

If you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

Does the application involve aquaculture in a PA?
PxTNo Clyes (ensure you have completed Part O; of Form 1)

 

 

Works that interfere with waterina | 1
watercourse

Note: If the development is proposed in a HPA,
applications for all works that interfere with water
in @ watercourse {including dams or weirs,
stream realignment or stream diversion) will not} 4
be accepted.

In a PA, applications for instream dams and
weirs may be accepted in nominated waterways,
if you licked box ii) in Q49, your application will
not be accepted.

Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.

More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
www.nnw.qid.gov.au or contacting the
department by email on:

wild [email protected],au.

 

Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

ENo YES (ensure you have completed the relevant Part K of Form 1):

IF YES,
oO i) The application is for an instream dam or weir: or

o il) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

 

Page 13

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1728 - MCU - Detached House [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.