Original source · versioned page text
PR22001.PlanningReportNoosaRiverHouses.Sept2022
5. Pre-lodgement History
Initial pre-lodgement engagement was undertaken with Noosa Shire Council on 6 July 2022, involving Council
attendees Lisa Pienaar and Mark Lewis.
These discussions have assisted to guide the preparation of this planning report with relevant criteria
addressed in full and supported by the detailed attachments.
Sparks Architects have prepared an Architects Statement forming Attachment D to this report. The Statement
specifically responds to the range of design items raised during Council’s pre-lodgement meeting and is
intended to inform Council of the design background and inspiration for what is a high quality residential project
at a landmark location.
Noosa River Houses | September 2022
Page 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.