Council archive · source document
Bushfire Info Kit PR22034_BIK_Settlers Cove Covenant E_VerA · OPW22/0166
Bushfire Information Kit
2 Bushfire Management Requirement
The BIK was prepared in accordance with:
• The approved Fire Management Plan for Settler’s Cove (the FMP) (WMB, 2005);
• The approved Ecological Restoration Plan (ERP) (C&B Group, 2005);
• The Landscape Master Plan (LandGraphics Landscape Architects, 2005);
• The approved Fauna Management Plan (C&B Group, 2005); and
• Recently prepared Fauna Management Plan for Stage 4 (Green Tape Solutions, 2018);
This section should be read in conjunction with the above-mentioned reports.
2.1 Asset Protection Zones
All vegetation removal must be in accordance with Council approval in covenant areas. Covenant E are
composed of the following zones Figure 2):
• Fuel control area
• Private Open Space for Conservation and Waterways Protection (POSCWP) Area (composed
of sclerophyll vegetation and littoral rainforest/non-flammable vegetation)
Figure 2: Cross section of the covenant areas (Extract from WMW, 2005)
2.1.1 Fuel control area
A fuel control area of 3 m in width is created adjacent to the covenant area, paths and building
envelopes. An additional fuel control area of 2.5m will be located within the covenant area (as illustrated
PR22034_BIK_Settlers Cove Covenant E Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Bushfire Info Kit PR22034_BIK_Settlers Cove Covenant E_VerA.pdfRelated documentApplication case desk ↗
About this file
- File size
- 574 KB (small file)
- File type
No other editions are linked here.