Skip to the record
Every meeting, every word.

Council archive · source document

51993.766.2 Request to change existing approval (TPC 2613)

of 28

Text shows just the words. Original shows the document exactly as it was published.

    16. List below all of the forms and supporting information that accompany this application (include all IDAS forms,
    checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this question
    does not apply for applications made on-line using Smart eDA)


    Description of attachment or title of attachment                                                  Method of lodgement to
                                                                                                      assessment manager




    27. Applicant`s declaration
       7
        By making this application, I declare that all information in this application is true and correct (note: it is unlawful to
    provide false or misleading information).


Notes for completing this form

Question 8:
•    Section 263 of the Sustainable PlanningAct20o9 sets out when the consent of the owner of the land is required for an
     application. Section 26o(1)(e) of the Sustainable PlanningAct2009 provides that if the owner's consent is required
     under section 263, then an application must contain, or be accompanied by, the written consent of the owner, or
     include a declaration by the applicant that the owner has given written consent to the making of the application.
•    Owner's consent is not required for a mobile and temporary ERA.

Question 9:
«    Section 264 of the Sustainable Planning Act 20og provides that if a development involves a state resource, a
     regulation may require the application to be supported by certain evidence prescribed under the regulation. Schedule
     14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be
     given, and the evidence required, to support the application.

Question 13:
« The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
  service leave levy is payable.
• The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy are
  prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and Construction
  Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued.
• Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or
  agency, on request from QLeave, or can be completed on the QLeave website at www.gleave.gld.gov.au. For further
  information contact QLeave on i8oo 803 481 or www.gteave.gld.gov.au.




                                                                                                   Version 2.o13Oecernher2or?

Used in these records

About this file

File size
3.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

51993.766.2 Request to change existing approval (TPC 2613).pdf · 3.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.