Original source · versioned page text
Consolidated Endorsed Amended Plans - MCU24 0141 & OPW24 0184 (As Published)
Plans and drawings: the text below has words only, no drawings.
Very large file (23.5 MB): may take a few minutes to open.
Original PDF page 17, section 1. The text section number identifies this passage in the reader.
4. MAINTENANCE MANAGEMENT ANNUAL MAINTENANCE REGIME - SCHEDULE FINISHES SCHEDULE
PRACTICAL COMPLETION TAS RE UEN ER ORMAN E IN I ATOR CODE ITEM PRODUCT / DESCRIPTION SIZE / PATTERN FINISH COLOUR
· The landscape contractor shall consolidate the landscape orks and ake ood eekly: No e er e ruary Maintain turf to present consistent I ported site topsoil: Refer to Top Soil Soil preparation As S ooth unifor eed free
all defects for practical co pletion. ortni htly: March April i orous appearance o to Top soil per Specification per plan topsoil ulch surfaces ith no As supplied
specifications
· At practical co pletion the landscape contractor shall ad ise SU ER for an 'on' Mo in Monthly: May Au ust 30 hi h no inated areas. deleterious aterials.
aintenance inspection ith LA. Unifor finish 00 deep free of deleterious
eekly: No e er e ruary Maintain turf neatly a ainst any
· The annual aintenance re i e schedule descri es the aintenance tasks ortni htly: March April ed e around any ser ice or Street Tree arden pt and ardens 25 co posted aterials. Install pinned coir esh o er io retention As supplied
Or anic Mulch
fre uencies and key perfor ance indicators that the aintenance contractor is to Tri in Monthly: May Au ust respecti e co er o posted orest Litter attered ulch areas pro ect entry atter and
follo . stor ater o erland flo path lo flo s ales.
· Maintenance period of t el e 2 onths fro the date of practical co pletion Sprayin ick E ery 2 eeks Octo er March No eeds or rass taller than plant
ipin E ery 4 eeks April Septe er ithin 500 of plants Unifor finish 00 deep free of deleterious
on aintenance of landscape orks to streetscape and parks. Or anic Mulch Street Tree arden pt and ardens aterials. eneral arden areas As supplied
25 co posted
00 ini u re uired depth or oop ine
MONITORING ulch ade uate to suppress eed
· Re ularly inspect all landscape orks to onitor durin construction Re ulchin Once durin M once per year ro th aintain soil oisture. Min 20 50
Inor anic Mulch Ri er ra el ashed Unifor inish O er eofa ric As Supplied
esta lish ent and aintenance. Inspect plantin at the start of 50 eep
· Re ie periodically to ad ust in consultation ith SU ER to suit chan in Sprin assess da a ed dead To achie e ini u desi n
or unhealthy plants. Replant as plantin densities and arden inter reen ouch Ber uda rass Top Soil as per eneral notes
conditions. S ooth flo in e en positi ely Bri ht reen
Re plantin re uired. co er Turf A rade free of pests and eeds 50 deep
· Any trees ith irdled or poor root ro th identified durin the aintenance period Turf Rolls Sod drainin rades
ill e replaced at the contractors expense. E ery 2 or 3 days durin E
eekly durin M or as re uired lants exhi it healthy ro th
· Report i ediately any stolen or dead or dyin plants to SU ER and al ays TE As er etail
aterin to aintain ade uate soil oisture. no si ns of drou ht stress Ti er Ed e As er etail As er etail As er etail
confir direction on su stitution or replace ent ith a si ilar si e and identical
species or ariety of the plant s ertilisin re uired
· Maintenace period of t el e 2 onths fro date of practical co pletion o here hen plants
are not respondin to Once durin M or as re uired lants appear healthy exhi it
aintenance of landscape orks to streetscape.
slo release fertiliser ood rate of ro th.
applied at plantin
OFF MAINTENANCE PLANT SCHEDULE 1 - STREET TREES Mature
· At the end of the aintenance period the landscape contractor shall arran e for an As re uired here plants re uire O E ENUS species o on Na e ty x Si e Staked
support. Allo to stake 20 of
'off aintenance' inspection ith Superintendent. Only co pliance of site lants ro in in an upri ht anner
trees durin E . Allo to stake STREET TREES
inspections and instructions y Superintendent achie es 'Off aintenance' further 20 of trees durin M
Stakin A Ri p A RON IA i perforata rase Island Apple 5 6x3 45 L
ollo in stor e ent hea y TOTAL 5
BIO-RETENTION BASINS - MAINTENANCE & HANDOVER Inspection for stor Any da a e noted and recitifed
rainfall or hi h inds
· here te porary turf is installed re o e turf soil eofa ric. Turf o er edia da a e
All trees to e 'AS 2303:2015 tree stock for landscape use'
surface ith 20 soil on turf sla s rolls lants ha e desired natural for
runin to pro ote Monthly durin E e ery 3
· here plants ha e een installed re ularly re o e silt uildup y hand and healthy plant ro th onths M eyond display healthy ro th
aintain ulch.
· At 24 onths 0 uild out de silt any planted areas replace any plants and
re ulch. E ro ide a report to SU ER Scheduled acti ities carried out. PLANT SCHEDULE 2 - INTERNAL PLANTING
· Maintain Bio Retention asins until it reaches B 4.4. 'Measures of successfully on esta lish ent pro ress at Successful esta lish ent. O E ENUS species ' o on Na e' ty Si e
Monitorin each pro ress pay ent clai . Scheduled aintenance acti ities
esta lished plants'. Ve etation co er 0 surface 0 soil isi ility fro a o e
M ro ide co pleted acti ities carried out. Successful
any areas ithout co er are ulched ini u e etation hei ht of 500 and TREES
list to SU ER after 3 onths aintenance
e etation healthy and free fro disease. A M he A MENA he ila pra Broad lea ed lily 4 300
ALE cor ALE TR ON coriaceus Beach irds eye 4 300
LU pud LUMERIA pudica E erlastin Lo e 2 300
RAN fit RAN IA fit alanii Bro n ardenia 3 300
APPROVED PLAN TOTAL 3
MCU24/0141 & OPW24/0184 FERN
BLE i BLE NUM i u Sil er Lady 2 200
NOOSA COUNCIL TOTAL 2
2 APRIL 2025 LEAFY
OR exc OR ANT ES excelsa y ea lily 200
TOTAL 7
SHRUBS
OR ru OR LINE Ru ra 4 200
PLANT SCHEDULE 4 PLANT SCHEDULE 5 AL lit ALLISTEMON i inalis Little ohn 3 200
Bio Basin Media Bio Retention Batter Planting NAN do NAN INA do estic Le on Li e 46 200
S pin S IUM australe innacle 22 200
BOTANICAL NAME POT SIZE SUGGESTED BIO BASIN 1 BOTANICAL NAME POT SIZE SUGGESTED BIO BASIN 1 TOTAL 110
SPACING Media SPACING Batter Planting
(12m²) (68m²)
GROUNDCOVERS
TREES TREES IA lit IANELLA caerulea Little ess 3 40
ACRONYCHIA imperforata 140mm - 3 Syzygium australe - Southern 25L 1/20m 2 4 A ri A ANIA ri ens Treasure lo er 2 40
TOTAL 3 TOTAL 4 VIO hed VIOLA hederacea Nati e iolet 42 40
O ten O SIA tenuifolia No o 22 40
SHRUBS SHRUBS TOTAL 335
BANKSIA robur 140mm 1/5m 2 1 BANKSIA robur 140mm 1/5m 2 2
CALLISTEMON sieberi 140mm 1/5m 2 1 CALLISTEMON Little John 140mm 1/5m 2 2
LEPTOSPERMUM petersonii 140mm 1/5m 2 1 CALLISTEMON Taree Pink 140mm 1/5m 2 2
MELALEUCA claret Tops 140mm 1/5m 2 1 1/5m 2 2
PLANT SCHEDULE 3 - SWALE PLANTING
CALLISTEMON Wildfire 140mm
TOTAL 4 LEPTOSPERMUM polygalifolium 140mm 1/5m 2 2
O E ENUS species ' o on Na e' ty Si e
MACROPHYTES & GROUNDCOVERS MELASTOMA affine 140mm 1/5m 2 2
12 LARGE SHRUB / SMALL TREE
FICINIA nodosa Tubestock 2/m
2
5 TOTAL
2
A Ms i A MENA s ithii Lilly illy 300
IMPERATA cylindrica Tubestock 2/m 5 TOTAL 8
2
JUNCUS usitatus Tubestock 3/m 9 GROUNDCOVERS MACROPHYTES
2 2
LOMANDRA hystrix Tubestock 1/m 3 JUNCUS usitatus Tubestock 8/m 160 I nod I INIA nodosa notted clu rush 25 40
2
TOTAL 22 LOMANDRA hystrix Tubestock 1/m 20 IM cyl IM ERATA cylindrica o on rass 25 40
2
LOMANDRA longifolia Tubestock 1/m 20 UN usi UN US usitatus o on Rush 25 40
Sacrificial Wintergreen Turf to Media Areas. To be Planted Out at 80% Build Out or After
TOTAL 200 TOTAL 75
2 Years.
anembo consultants
Client: Location: Project Description: Drawing Title: JOB No.: S24091289
FILE: 250203
Ridin i h ty Ltd re Birchley 4 Leo Alley Rd Noosa ille Landscape orks DWG. No. LD3
anembo consultants pty.ltd. A.B.N. 75 089 473 156
PROJECT SPECS, SHEET 3 OF 8 B 03.02.25 COUNCIL RFI CK TH This document is the copyright of anembo consultants & shall PO Box 24 Moffat Beach Q 4551 Landscape Architects
Development: Lot on Plan: Project Status: PLANT SCHEDULE
APPROVED:
A 05.11.24 COUNCIL SUBMISSION CK TH
not be copied without written approval, nor shall it be used Ph: 07 5437 0000 Project Management
T Hindley AILA 713 except for the development and the site specified. Scale can email: [email protected] Environmental
e elop ent Lot 25 M 4540 Landscape M U Operational orks & FINISHES SCHEDULE CATEGORY: IND ISSUE DATE DESCRIPTION DWN CKD ISSUE DATE DESCRIPTION DWN CKD
not be guaranteed when printing from PDF files. www.anembo.com Arboriculture
Document Set ID: 23674841
Version: 1, Version Date: 04/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.