Skip to the record
Accept no substitutions.

Council archive · source document

Development Application Part 3 - Construction Management Plan, Floor Plans · OPW11/0335

Plans and drawings: the text below has words only, no drawings.

Very large file (10.1 MB): may take a few minutes to open.

Log in to see the plans as drawn
         energex                                                                                                    DIAL BEFORE

       positive energy
                                                                                                                    YOU DIG
                                                                                                                    www.1100.com.au
Damage Reporting
All damage to cables, conduits and pipes must be reported no matter how insignificant the damage appears to be. Even very minor
damage to cable protective coverings can lead to eventual failure of cables through corrosion of metal sheaths and moisture ingress.
All work in the vicinity of damaged plant should cease and the area should be vacated until a clearance to continue work has
been obtained from an ENERGEX officer.




ENERGEX Limited - ABN 40 078 849 055                                                                 24 Hour Loss of Supply 1362 62
26 Reddactiff Street Newstead QLD 4006                                                                24 Hour Emergencies 13 19 62
GPO Box 1461 Brisbane Queensland 4001                                                                     General Enquires 1312 53
          Contact ENERGEX DBYD Monday to Friday from 7 am to 4 pm on (07) 3664 5400 or dbvdddteneraex.com.au
                                              www.eneroex.com.au

             To resubmit or change the nominated search area contact DBYD via Phone 1100 or www.1100.com.ou

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 3 - Construction Management Plan, Floor Plans.pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.