Working in close proximity to overhead powerllnes or underground         r,.
power cables has its hazards. Every year workers die or suffer
serious injuries as a result of unsafe work practices. Contact with
underground power cables can not only result In injury or death, but
                                                                         This brochure is:r+ot an exhaustive; HSt of aM sefery matters:
                                                                         that need to be considered. Whr►stcare:is.taken in the;
                                                                         preparatioa:of this material, ENERGEX does-not guerontse-
                                                                                                                                          you dig
costs to repair the damage can be expensive.
                                                                         theaccuuraCy and completenessof the.htlormetion.
This brochure Is designed to inform you about safe work practices
                                                                         ENERGEX will not be,esponsible for any bas; damage
                                                                                                                                          Working near power cables
for working around underground power cables.
                                                                         or costs lneumed as a result of any errors or omissions
All machinery operators and other workers conducting work near           in relation to fhe material in this documeAt or for any
underground power cables should also be aware of their safety            possible actions ensuing. from Information contained In. the
obligations under the Electrical Safety Act 2002 and adopt safe work     document;
practices in accordance with the Code of Practice V4orking Near
Exposed Live Parts". Copies of these publications can be obtained
from the Queensland Government's Electrical Safety Office at
www.delr.gld.gov.aulelectncal safety.




      Identify all electrical hazards, assess the risks, establish
      control measures and review these periodically. Control
      measures may include, but may not be restricted to:

          applying appropriate signage at least 8 to 10 metres either
          side of powerilnes and using visual Indicators such as tiger
          tails fitted to the powerilnes
          using ground barriers, where appropriate
          Informing workers of required work practices.
                                                                         ENERGEX Limited
      Ensure operators are aware of the height of their machinery in
                                                                         GPO Box 1461, Brisbane OLD 4001
      both stowed and working positions.
                                                                         Telephone 1312 53
      Lower all machinery to the transport position when relocating.
                                                                         Facsimile (07),3401-4609
     Work away from powenines, not towards them.                         energex.c om.au
     Contact us about placing Identifiers on powerllnes and power        ABN 40 078849.055
     poles at your worksite and any further control measures.




                                                                         energex                                                                           energex
                                                                         positive energy

Used in these records

About this file

File size
10.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 3 - Construction Management Plan, Floor Plans.pdf · 10.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.