Council archive · source document
Development Application Part 3 - Construction Management Plan, Floor Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (10.1 MB): may take a few minutes to open.
GENERAL NOTES:
I. ALL WOK ON THIS CONTRACT 61D BE (ARM OUT N A((NE)AIII WITH THE JOB SPECIFICATION AM TO THE SAMMIT110111
DRAWING SCHEDULE
OF THE LOCAL AUTHORITY AND THE OKWIL ASPHALT TYPE 061
Z. THE CONTRACTOR 6 TO CONTACT EMERIDL IEISTRA, (0M0 AID OTHER SUM AUTI1*IES AND LOCATE EX61115,
MMLM (MALTED DEPTH
90r ON HOT NTNIN
10525-C1 avL WORKS NOTES AND
PRIMER 0UI/.M. DRAWING SCHEDULE
IAOERCROUD SERVICES PRIOR TO (N6TNET0I.
3. CONDUIT LOCATIONS F SHORN ON THE PLANS ARE PAOV WIL ONLY AND THE CONTRACTOR 6 TO LIAISE WITH THE DOW, 10525-C2 SITE FRONTAGE WORKS
TELSTRA AND THE ELECTRICAL, CONSULTANT FOR THEIR FINAL PIA16 NEDMIELY POOR TO LAYNS ROAD AND FOOTPATH PLAN
CONDUITS
I
A. THE 00(0015 DESIGN 6 BASED PARTLY ON A DATA TE0RA1 MODEL (OPLDER GENERATED FROM TIE SITE SURVEY AND SOME 10525-C3 FRONTAGE WORKS
ELDENTS OF THE SURVEY DATA ARE INTERPOLATED AND MAY VARY FROM THE ACTUAL SITE (ONI11TMG THE (RNIRA(TOI DETAILS
SMALL LASE WITH THE DOE& AND ARVE1OI AND SET OUT TIE WORKS ONLY FROM APPROVED MOM PEGS AND LEVEL
RE1101 MARKS.
10525-C4 BILK EARTHWORKS
S. THE CONTRACTOR 6 TO ORGAIRSE HIS WORKS SO THAT EROSION, DEPOSITOR OF T. AND STOHNAIEO RUNOFF FROM THE 190 COMPACTED SUBGRADE TO PLAN SHEET 1
SUE DOES LOT EXCEED THE PRE (O6TRULTON RATES AT ANY POW AS A RESULT OF HIS AC106. LEAN NIX PAVEMENT 9S% RELATIVE D06111
6. (FEAR ALL VEGETATION FROM T00SE AREAS TO BE EXCAVATED OR FLIED. N OTHER AREAS MERE (FEARING 6 SP((FED, COMPACTED N Mm LAYERS
SELECTED (1EA01 ONLY 6 10 BE TARRED OUT BY RETAINING HOSE TREES W01(0 BY THE DOtER AND LEAVING THE AREA 1010% RELATIVE DENSITY
. EIOSTOG PAVEINI TO BE
(UT BANK UNTIL FIAT DEPTH
10525-CS BULK EARTHWORKS
N A CONDITION SUITABLE FOR SLASHING. PAVEMENT EXPOSED, PLAN SHEET 2
7. THE CNTRACTW 6 TO PRESENT W THE )90 FOR (II- MAINTENANCE AND Of-P01ENAINE Ngww WHEN DIRECTED BY 10525-C6 BULK EARTHWORKS
THE ENf1EER WITH ALL PIPES, ROADS AND ALLOTMENTS FREE OF NRB6N 01 Al AID WITH FOOTPATHS AND PARK AREA PAVEISENT JOINT DETAIL DETAILS
SLASHED OR HON, AND UNDERGROUND SERVICES OPENED FOR INSPECTION.
ROAD WIDENING - DAVID LOW WAY
R. NO WORK 6 TO (100110 ON THE SITE UNTIL 14 APPROVAL OF THE (11900 HAS BEEN RECEIVED IN WRITING AND AN OFFKIAL 10525-C1 LIEMARKING AND SIGNAGE
PRE-START MEETING WITH A REPRES(NTATM O (OIM(L AND THE ENGINEER HAVE KEN HELD. THE CONTRACTOR 5 TO OBTAIN
A COPY OF THE MINUTES OF THE PRO-START MD TOG AND SHALL COMPLY WITH ALL REMAREIENTS THOM.
PLAN
l71
9. ALL CONSTRUCTION 6 TO K SET OUT BY THE CONTRACTOR FROM PEGGNi OF ROAD WITEREIE, MANHOLE Pww, LOT
SIAM AND TNk PROVIDED BY THE PRINCIPALS LICENSED SURVEYOR
THESE DRAWINGS ARE TO BE READ N WN1AEI101111
METH GEOTEON(AL REPORT N1. M7-IRA
EARTHWORKS NOTES
BY BUTLER PARTNERS PTY. LTD.
t CLEAR ALL VEGETATION FROM THOSE AREAS TO BE EXCAVATED OR FILLED. ALL RUBBISH NELL11G DEBRIS FROM CLEARING 6 TO DATED APRIL 20110
K DISPOSED IN ACCORDANCE WITH THE STAIOARDS Of THE LOCAL AUTHORITY. BURNING WILL NOT K ALLOWED
2. ALL ORGAN( MATERIAL, TOPSOIL, AM IA6UTABLE SUBGRAOES ARE TO K STRIPPED FROM THE AREA 10 Of FILLED AM
REMOVED FROM THE SITE EXCEPT THAT SUFFICIENT TOPSOIL 6 TO BE RETAINED FOR RESPREACN0 TO A Will DEPTH OF NOr
ALL OVER THE SITE AFTER FILLING TO LEVEL WITH IMPORTED FILL AFTER STRIPPING AS ABOVE THE MOLE SITE 6 TO K
ID PACTED AND PROOF ROILED TO THE SATISFACTION OF THE GiEO1EDN AL CONSULTANT PRIOR TO PLACING Of IMPORTED FLL.
3. FLING 610 K (ANTED OUT N (0(100100 LAYERS NOT TO EXCEED 2N9r DEPTH BY 2501.'. EACH LAYER 6 TO BE
COMPLETELY COMPACTED TO
A MINIMUM OF 95% RELATIVE DRY 006ITY FOR COHESIVE SELLS OR A 10NIM DENSITY INDEX O 70% FOR NN-COHSME SIDES AND
TESTED AND APPROVED BY THE GEOTFON(AL CONSULTANT P00R TO THE PLACEMENT OF NNE NEXT LAYER. THE TO[ 30000 OF
THE ROAD A.OGRADF IS TO BE COMPACTED TO A MKM O 90% RELATIVE CRY DENSITY.
A. THE WHOLE O THE MATERIAL N ANY PARTICULAR LAYER SHOULD BE HOMOGENOUS. AND F NECESSARY MALL QUANTITIES OF
FILL OFFERING FROM THE REST SHOULD BE SPREAD AS A TON LAYER OVER THE WHOLE STTE AND INCORPORATED INTO A FULL
LAYER. N A M/FLU SITUATION THE IROTEOENAL CONSULTANT MAY DREG THAT ANY EXISTING SELL WITHIN AEON OF THE
FINISHED SURFACE LEVEL BE REMOVED AND REPLACED WITH FBI EOIIVAIEHI TO THE MENU F LL MATERIAL THE MATERIAL SO
REMOVED MAY, F IT OTHERWISE MEETS THE SPECfAlO0, K USED AS MCA FILL AS ABOVE.
S. IMPORTED FLL N ALLOTMENTS 5 TO CONSIST OF 100111OUS MATERIAL CONTINUOUSLY GRADED WITH A MAXIMUM PARTICLE SQE
DE 111.., A MAXIMUM LINEAR SHRINKAGE OF 0%, AND A MOISTURE (ONTENI BETWEEN -2% TO -2% O OPTIMUM MG511RE
CONTENT AT THE THE O COMPACTION. !PORTED FILL N ROADWAYS 6 TO (O66T OF HOMOGENOUS MATERIAL CONTINUOUSLY
GRADED WITH A MAX" PARTICLE SIZE OF 1046, A MURAL (BR O 1, AND A MOISTURE CONTENT BETWEEN .7% 10 .2% OF
OPTIMUM MOISTURE (ORIENT AT THE THE O COMPACTION(
A. THE CONTRACTOR SHALL ENURE THAT ALL WOK 6 CARRIED OUT. TESTED AND CERTIFIED AS CONTROLLED FILL N (OPLNANCE
WITH A53T91 'O.OELN ON EARTHWORKS FOR (NIOCL4 AND RESIDENTIAL DEVELOPMENTS'. ALL TESTING AND INSPECTKNIS
ARE TO BE CARRIED OUT BY A RATA CERTIFIED LABORATORY APPOINTED BY THE GEOTEDIKAL CONSULTANT IN ACCORDANCE TOPSOIL
WITH LEVEL ONE TESTING AS SET OUT N APPENDIX B OF AS319L THE CONTRACTOR SHALL PROVIDE LERTFCATDN TO THE DOW TOPSOIL 6 10 BE REMOVED, STOCKPILED, AND R06ED 10 COYER ALL 01100(0 EARTHWORKS TO A NU (0PA(TED DEPTH OF
ON COMPLETION O THE EARTHWORKS. 7511. AND GLASSED.
im-
7. ALL 'UNCONTROLLED RL' OENTFI0 ON SITE TO N MOVED TO NATURAL SURFACE LEVEL AND, F S1ATAlLE, REMISED ARID ALL PAVEMENT WORK 6 TO BE CARRIED WI N ACCORDANCE WITH 91101E COAST REGIONAL (OTC GUIDELINES AND
PLACED AS SPECIFIED MOVE. SPECIFICATIONS.
PAVEPENT DETAIL
ROAD EXTENSION - LANEWAY
TOO CONMLTNO M. LTD.
PROPOSED ACCOMODATION AND CIVIL WORKS NOTES 20
.u.osr
stmt, Rw,AF.
PA Br 61, Nw"vf4 OLD 45"
COMMERCIAL DEVELOPMENT AND DRAWING PNn. (17) 5449 0001 9e. Hi) SAGE %%
EM.L
W.k
rykYAt.keWtYym.
-.t.1[eNthltr
'ESSENCE OF PEREGIAN' SCHEDULE ENGINEERS
'PI. PRYSTWA ' A. VOESS tr. MAY 901
DAVID LOW WAY (( \1 1 STAGE 1 AND 2 STRUCTURAL CIVIL. o.e..( GEORGE Oldll
M GRAY
PEREGIAN BEACH for essence D
C
R
2L.N.O
3Ln1
1.1.1
CONSTRUCTION STAGING ISSUE
OPERATIONAL WOKS ISSUE
OPERATINAL WORKS 65UE
9...
1 . 7
......r
SCANLON PROPERTY GROUP A 2X(5.1
..
PRN1NR1' SAE
.-...v. 10525 I Cl
I -
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 3 - Construction Management Plan, Floor PlansRelated documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.