Council archive · source document
Development Application Part 3 - Construction Management Plan, Floor Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (10.1 MB): may take a few minutes to open.
rou. ill wq.
E
I
D MALIO ME 1a A'N041
C uxic ®E Ia NWW& i
Wl.p NBIM_ 661E d
A 1141p N__ i
SPICE CONSULTING
i CONSIMcflON M'DRMAICS CONSLLTANTS
PO BOX 1406 6IIOEFIM 0 4666 °
Tdsplwr to 5445 7666
QM Fxinb 07 5445 7624
11124618 Emal - Ia1dd*M1.pdisana AHSCA
PACIFIC PLUMBING
MATRIX PROJECTS P'L
oM•i UDG_ NO
PART SITE PLAN 2.12
WATER SU'PLY PLAN
Al- 1:200
A3- 1: 4001 zi^u o
Pam=
ESSENCE
PART S M PLAN 2 of 2 MIXED USE DEVELOPMENT
RAI I MI * DAVID LOW WAY
PEREGIAN BEACH V
20F
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 3 - Construction Management Plan, Floor PlansRelated documentApplication case desk ↗
About this file
- File size
- 10.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.