Skip to the record
Accept no substitutions.

Original source · versioned page text

2017-10-10 Planning & Environment Committee Agenda

of 128

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (21.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 10 OCTOBER 2017


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 10 October 2017 regarding Application No. MCU17/0024 for a
Development Permit for a Material Change of Use – Entertainment and Dining Business Type 1
Food & Beverages and Type 2 Recreation Amusement & Fitness (extensions and alterations to a
Surf Club) situated at Sunshine Beach Surf Life Saving Club, located at 4 The Esplanade
Sunshine Beach Qld 4567 and:
A.   Approve the application in accordance with the following conditions:
     PLANNING
     When Conditions must be Complied With
     1.      Unless otherwise stated, all conditions of this Decision Notice must be complied with
             prior to the use commencing, and then compliance maintained at all times while the
             use continues.
             Approved Plans
     2.      Development undertaken in accordance with this approval must generally comply
             with the approved plans of development. The approved plans are listed in the
             following table unless otherwise amended by these conditions.
      Plan       Rev.   Plan/Document Name                                           Date
      No.
      0000       A      Cover Page, drawn by Andrew Bock Architecture                February 2017
      1002       B      Proposed Site Plan, drawn by Andrew Bock Architecture        March 2017
      1003       B      Proposed Site Plan – Aerial Photo, drawn by Andrew Bock      March 2017
                        Architecture
      1004       B      Proposed Roof Plan, drawn by Andrew Bock Architecture        March 2017
                 B      Proposed Upper Floor Plan, drawn by Andrew Bock              March 2017
                        Architecture
      1006       C      Proposed Ground Floor Plan (from IR response) , drawn by     July 2017
                        Andrew Bock Architecture
      1007       A      Proposed Lower Floor Plan, drawn by Andrew Bock              March 2017
                        Architecture
      1008       B      Proposed Landscape Plan, drawn by Andrew Bock                March 2017
                        Architecture
      2001       B      Proposed Elevations, drawn by Andrew Bock Architecture       March 2017
      2002       B      Proposed Elevations, drawn by Andrew Bock Architecture       March 2017
      2003       B      Proposed Sections A & B, drawn by Andrew Bock Architecture   March 2017
      2004       B      Proposed Sections C & D, drawn by Andrew Bock                March 2017
                        Architecture
      2005       B      Proposed Sections E & F, drawn by Andrew Bock Architecture   March 2017
      3001       A      Perspective Views North and North West, drawn by Andrew      February 2017
                        Bock Architecture
      3002       B      Perspective Views West and South West, drawn by Andrew       March 2017
                        Bock Architecture
      3003       A      Perspective Views East and North East, drawn by Andrew       February 2017
                        Bock Architecture
      3004       A      Perspective Views View to Entry and Deck Lounge, drawn by    February 2017
                        Andrew Bock Architecture
      3005       B      Aerial View showing Height line, drawn by Andrew Bock        March 2017
                        Architecture
      3006       B      Views showing Height line, drawn by Andrew Bock              March 2017
                        Architecture
      4001       A      Colours and Textures of Sunshine Beach, drawn by Andrew      February 2017
                        Bock Architecture
      4002       A      Proposed Material Palette, drawn by Andrew Bock              February 2017
                        Architecture


                                                                                     Page 77 of 128
Log in to download the original file

2017-10-10 Planning & Environment Committee Agenda(PDF, 21MB).pdf · 21.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.