Original source · versioned page text
2017-10-10 Planning & Environment Committee Agenda
The original of this document is very large (21.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 OCTOBER 2017 RECOMMENDATION That Council note the report by the Development Planner to the Planning & Environment Committee Meeting dated 10 October 2017 regarding Application No. MCU17/0024 for a Development Permit for a Material Change of Use – Entertainment and Dining Business Type 1 Food & Beverages and Type 2 Recreation Amusement & Fitness (extensions and alterations to a Surf Club) situated at Sunshine Beach Surf Life Saving Club, located at 4 The Esplanade Sunshine Beach Qld 4567 and: A. Approve the application in accordance with the following conditions: PLANNING When Conditions must be Complied With 1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan Rev. Plan/Document Name Date No. 0000 A Cover Page, drawn by Andrew Bock Architecture February 2017 1002 B Proposed Site Plan, drawn by Andrew Bock Architecture March 2017 1003 B Proposed Site Plan – Aerial Photo, drawn by Andrew Bock March 2017 Architecture 1004 B Proposed Roof Plan, drawn by Andrew Bock Architecture March 2017 B Proposed Upper Floor Plan, drawn by Andrew Bock March 2017 Architecture 1006 C Proposed Ground Floor Plan (from IR response) , drawn by July 2017 Andrew Bock Architecture 1007 A Proposed Lower Floor Plan, drawn by Andrew Bock March 2017 Architecture 1008 B Proposed Landscape Plan, drawn by Andrew Bock March 2017 Architecture 2001 B Proposed Elevations, drawn by Andrew Bock Architecture March 2017 2002 B Proposed Elevations, drawn by Andrew Bock Architecture March 2017 2003 B Proposed Sections A & B, drawn by Andrew Bock Architecture March 2017 2004 B Proposed Sections C & D, drawn by Andrew Bock March 2017 Architecture 2005 B Proposed Sections E & F, drawn by Andrew Bock Architecture March 2017 3001 A Perspective Views North and North West, drawn by Andrew February 2017 Bock Architecture 3002 B Perspective Views West and South West, drawn by Andrew March 2017 Bock Architecture 3003 A Perspective Views East and North East, drawn by Andrew February 2017 Bock Architecture 3004 A Perspective Views View to Entry and Deck Lounge, drawn by February 2017 Andrew Bock Architecture 3005 B Aerial View showing Height line, drawn by Andrew Bock March 2017 Architecture 3006 B Views showing Height line, drawn by Andrew Bock March 2017 Architecture 4001 A Colours and Textures of Sunshine Beach, drawn by Andrew February 2017 Bock Architecture 4002 A Proposed Material Palette, drawn by Andrew Bock February 2017 Architecture Page 77 of 128
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.