Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Development Application Part 1 of 2 - IDAS Form 1, Form 28, Checklist, vica versa doc details of attachment 13 Cooran Court Noosa Heads · OPW10/2100

of 39

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INSTRUCTION MANUAL

Assembly Instructions
Float Assembly Sequence

Shoreline

 

 

Exhibit A

» Float corners are marked with dots to correspond to the numbers.

. =1
ee =2
coe =3
eoce =4

» Each number represents the tab height. #1 is the lowest tab and #4 is the highest tab.

> The sliding nut is inserted on the lowest tab. Typically this will be #1 but in instances where 2 or 3 floats are joined it may
be #2 or #3. Itis important to make sure that the tabs are aligned in proper order; otherwise there will be small ridges in your
assembled dock.

> Typically the side with #1 and #4 is aligned on the narrow side or the side oriented towards the shoreline to minimize the
need for spacers when using lug connectors and accessories.

5

Used in these records

About this file

File size
9.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 1 of 2 - IDAS Form 1, Form 28, Checklist, vica versa doc details of attachment 13 Cooran Court Noosa Heads.pdf · 9.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.