Original source · versioned page text
Appendix D - Civil Engineering Report
Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.
The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 36, section 1. The text section number identifies this passage in the reader.
Conditions STATUTORY OBLIGATIONS Seqwater currently manages infrastructure which is critical to the delivery of water services within South East Queensland. Great care must be exercised when working in close proximity to this critical infrastructure to prevent any damage and any risk to supply and/or public health and safety. Works that build over, interfere with, interfere with access to, increase or reduce the cover over, or change the surface of land in a way causing the ponding of water over an access chamber for Seqwater’s infrastructure will require the consent of Seqwater in accordance with the Water Supply (Safety and Reliability) Act 2008. Failure to obtain Seqwater’s consent may be a statutory offence. WRITTEN CONSENT AND DOCUMENTATION Where works or activities: . are within a Seqwater easement; and/or . are being undertaken within five (5) metres of Seqwater’s infrastructure; and/ or . interfere with, build over, interfere with access to, increase or reduce the cover over, or change the surface of land in a way causing ponding of water over an access chamber for Seqwater’s infrastructure The constructor as a minimum must: . Contact Seqwater for further detailed information on Seqwater’s infrastructure by phone 1800 771 497 (24 hours), 07 3035 5500 (8am to 5pm Monday to Friday) or by email [email protected] requested to by an Seqwater Officer, complete and submit the attached ‘Application Form for Proposed Work/Activities Affecting Seqwater Infrastructure’ Prior to commencing the proposed works or activities requiring Seqwater written consent, the constructor must: « Apply for a permit to work and receive Seqwater’'s written consent for proposed works or activities . Provide all necessary plans and details, including Work Method Statements for construction approval « — Comply with all requests for notice as issued by Seqwater e Submit a new Dial Before You Dig enquiry should the scope of works change, or plan validity dates expire On completion of the works or activities the constructor must: . Provide all necessary ‘As-Constructed’ plans and details to [email protected] LOCATING OF SERVICES When locating Seqwater’s underground infrastructure (including communication conduits, cathodic protection, etc) non-destructive potholing techniques (i.e. careful hand excavation, hydro-vacuum or similar approved potholing practices) must be used (subject to the approval of Seqwater). DAMAGE TO SEQWATER INFRASTRUCTURE All damage to Seqwater’s infrastructure must be reported immediately on FREECALL 1800 771 497. Seqwater reserves all of its rights with respect to any loss or damage to its infrastructure. DISCLAIMERS Seqwater Seqwater makes no representation or warranty as to the accuracy, completeness, reliability or suitability of the, maps, GIS data and any other information provided by Seqwater for any specific purpose and disclaims any responsibility or liability for any expenses, losses, damages and costs which may be suffered or incurred as a result of or in connection with using or relying on the data or the Information provided by Seqwater. The user acknowledges that use of the Information is subject to the user's own investigations and due diligence to verify the accuracy, completeness, reliability and suitability for the relevant purpose. Please ensure the map attached accurately represents the location of proposed works. If you have any queries, please contact Seqwater. The information provided by Seqwater in this response is only valid for 28 days. OpenStreetMap Based on or contains map data provided by (c) OpenStreetMap contributors. Please visit http://www.openstreetmap.org/copyright to view the disclaimer. Department of Natural Resources and Mines Data Based on or contains data provided by the State of Queensland (Department of Natural Resources and Mines). Please visit www.dnrm.qid.gov.au to view the Department's disclaimer. CONTACT DETAILS For further details or queries please contact Seqwater: In writing: Seqwater, PO Box 16146, City East QLD 4002 By Phone: 1800 771 497 or 07 3035 5500 By Fax: 07 3299 7926 Email: [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.