Original source · versioned page text
Appendix D - Civil Engineering Report
Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.
The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
1 Introduction Pinnacle Engineering Group (Pinnacle) was engaged by Palm Lake Works Pty Ltd to undertake the preliminary engineering investigations to provide supporting documentation for the development approval for a Multiple Housing – Type 3 Retirement and Special Needs (10 units) retirement living development located at 20 Trading Post Road, Cooroy QLD, within the local authority of the Noosa Council (NC). 1.1 Scope This report covers the following civil engineering elements associated with the proposed development including: • Stormwater Drainage; • Water Supply; • Sewerage Reticulation; • Bulk Earthworks; and • Electrical and Telecommunications. 1.2 Site Description 1.2.1 Site Location Street Address - 20 Trading Post Road, Cooroy QLD RP Description - Lot 101 on SP287641 Total Site Area - 0.5791 Hectares Current Zoning - Rural Proposed Use - Resort Living Residential Local Authority - NC Refer to Figure 1.1 for the site location. 1.2.2 Site Features and Topography The subject site is currently occupied by an existing residence and auxiliary structures located within the eastern portion of the site. A dam is located within the western portion of the subject site with medium density vegetation being located throughout the site. All structures and vegetation will be removed from site as part of the proposed development works. An existing easement is located along the eastern boundary of the subject site. The highest elevation of the subject site of approximately RL102.79m AHD is reached at the western boundary of the subject site with the lowest elevation of approximately RL97.20m AHD reached at the northeast corner of the subject site. An existing features and topography layout of the subject site is included within Appendix B. Refer to Figure 1.2 for the existing aerial view of the site. Palm Lake Resort, Cooroy – Stage 6 – Engineering Services Report Page 6 of 21 File Location: 171108_PEG0360_20 Trading Post Rd, Cooroy_ESR_R002.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.