Appendix D - Civil Engineering Report
Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.
The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
3 Water Reticulation
3.1 Existing Infrastructure
A review of Dial Before You Dig (DBYD) data has confirmed the location of existing water reticulation mains
within the Trading Post Road and Prospect Place road reserves to the south of the subject site.
An existing 150mm uPVC water main is located with the Trading Post Road reserve to the south of the subject
site with additional water mains currently under construction within the surrounding stages of the Palm Lake
Resort, Cooroy.
The design documentation for the existing Palm Lake Resort stages is included within Appendix E with the
DBYD data included within Appendix D.
3.2 Development Water Reticulation Demand
The proposed development’s water reticulation demands on the existing potable water infrastructure were
established using the methods described in the SEQ WS&S D&C Code. These demands were used to
determine the consumption rates for the proposed development. Potable water demand factors and flow
parameters have been taken from Table 4.1 and Table A17, respectively, to determine the potable water
consumption rates for the proposed development.
The results are presented in Table 3.1.
Table 3.1: Water Demand Factors and Consumption Rates (Palm Lake Resort, Cooroy – Stage 6 Only)
Design Parameter Stage 3 Potable Water Factors
Area of Land 0.5796 Hectare
Development Type Multiple Housing – Type 3 Retirement and Special Needs
ET 10
EP/ET Conversion factor 2.7
EP 27 EP
Estimated Non-Revenue Water (NRW) 30 L/EP/day
Average Day Flow (AD) 230 L/EP/day + NRW (260L/EP/day)
Mean Day Max Month (MDMM) / AD 1.5
Peak Day (PD) / AD 2.0
Peak Hour (PH) / PD 2.0
PH / AD 4.0
AD 7,020L/day or 0.0813L/sec
MDMM 10,125L/day or 0.1172L/sec
PD 13,230L/day or 0.1531L/sec
PH (Maximum) 25,650L/day or 0.2969L/sec
Fire Flow 15L/sec for 2 hours
Peak Hour Demand 15.297L/sec
The maximum hour demand of 0.2969L/sec plus the fire flow demand of 15L/sec equals a total flow demand
of 15.297L/sec. With a maximum velocity of 2.5m/s, the proposed multiple housing would require a minimum
internal diameter of 88mm. Therefore, it is proposed to utilise the proposed 100mm diameter potable water
mains to service the proposed development.
Palm Lake Resort, Cooroy – Stage 6 – Engineering Services Report Page 9 of 21
File Location: 171108_PEG0360_20 Trading Post Rd, Cooroy_ESR_R002.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.