Appendix D - Civil Engineering Report

Attached to the e-mail Multiple Housing – Type 3 Retirement & Special Needs (10 units) - MCU17/0551.

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 9, section 1. The text section number identifies this passage in the reader.

3 Water Reticulation

3.1    Existing Infrastructure

A review of Dial Before You Dig (DBYD) data has confirmed the location of existing water reticulation mains
within the Trading Post Road and Prospect Place road reserves to the south of the subject site.

An existing 150mm uPVC water main is located with the Trading Post Road reserve to the south of the subject
site with additional water mains currently under construction within the surrounding stages of the Palm Lake
Resort, Cooroy.

The design documentation for the existing Palm Lake Resort stages is included within Appendix E with the
DBYD data included within Appendix D.


3.2    Development Water Reticulation Demand

The proposed development’s water reticulation demands on the existing potable water infrastructure were
established using the methods described in the SEQ WS&S D&C Code. These demands were used to
determine the consumption rates for the proposed development. Potable water demand factors and flow
parameters have been taken from Table 4.1 and Table A17, respectively, to determine the potable water
consumption rates for the proposed development.

The results are presented in Table 3.1.

Table 3.1: Water Demand Factors and Consumption Rates (Palm Lake Resort, Cooroy – Stage 6 Only)

                    Design Parameter                                 Stage 3 Potable Water Factors
 Area of Land                                          0.5796 Hectare
 Development Type                                      Multiple Housing – Type 3 Retirement and Special Needs
 ET                                                    10
 EP/ET Conversion factor                               2.7
 EP                                                    27 EP
 Estimated Non-Revenue Water (NRW)                     30 L/EP/day
 Average Day Flow (AD)                                 230 L/EP/day + NRW (260L/EP/day)
 Mean Day Max Month (MDMM) / AD                        1.5
 Peak Day (PD) / AD                                    2.0
 Peak Hour (PH) / PD                                   2.0
 PH / AD                                               4.0
 AD                                                    7,020L/day or 0.0813L/sec
 MDMM                                                  10,125L/day or 0.1172L/sec
 PD                                                    13,230L/day or 0.1531L/sec
 PH (Maximum)                                          25,650L/day or 0.2969L/sec
 Fire Flow                                             15L/sec for 2 hours
 Peak Hour Demand                                      15.297L/sec

The maximum hour demand of 0.2969L/sec plus the fire flow demand of 15L/sec equals a total flow demand
of 15.297L/sec. With a maximum velocity of 2.5m/s, the proposed multiple housing would require a minimum
internal diameter of 88mm. Therefore, it is proposed to utilise the proposed 100mm diameter potable water
mains to service the proposed development.




Palm Lake Resort, Cooroy – Stage 6 – Engineering Services Report                                     Page 9 of 21
File Location: 171108_PEG0360_20 Trading Post Rd, Cooroy_ESR_R002.docx
Log in to download the original file

Appendix D - Civil Engineering Report.pdf · 14.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.