Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appendix B - Code Assessment

Attached to the e-mail MCU15/0085 Development Application.

of 33

Page text shows just the words. Original shows the document exactly as it was published.

Cooroy & Lake Macdonald Locality Code


Pedestrian and bicycle pathways
O23 Safe and convenient pedestrian and                 S23.1 Pedestrian and bicycle pathways are
bicycle pathways are provided and retained             provided and retained where indicated in the        S23.1 Not Applicable
between and around key destinations,                   Priority Infrastructure Plan in Part 15;            The Priority Infrastructure Plan does not detail any
including—                                             AND                                                 pathways to be provided in the vicinity
a) between Cooroy and Tewantin;                        S23.2 Contributions toward pedestrian and
b) between Cooroy and the Noosa Botanical              bicycle pathways are provided in accordance         S23.2 Complies
Gardens; and                                           with the Priority Infrastructure Plan in Part 15.
c) within and around the town of Cooroy.                                                                   Contributions are discussed in section 4.1 of the
                                                                                                           planning report

Protection of Lake Macdonald water supply
O24 Development does not adversely impact on           S24.1 Within the Lake Macdonald catchment           S24.1-O27 Complies
the Lake Macdonald water supply.                       area shown on Natural Resources Overlay Map
AND                                                    OM3.5, buildings and other structures are not       The proposal does not involve the establishment of
                                                       located below 98.5m AHD.                            additional waste water treatment systems and will not
                                                       No solution provided.                               adversely impact on the Lake Macdonald water
                                                                                                           supply
O25 The number and location of access points           S25.1 No solution provided
to watercourses is controlled and managed to
prevent adverse impacts on water quality in
Lake Macdonald;
AND
O26 Key nodes are established and
                                                       S26.1 No solution provided
appropriately managed at the following
locations and include facilities such as parking
and picnic areas—
a) the northern part of the lake, in the vicinity of
the water treatment plant, scouts and fish
hatchery;
b) the western part of the lake in conjunction
with the Botanic Gardens and associated picnic
areas; and
c) the eastern part of the lake, in the vicinity of
the Old Tinbeerwah School Park.
AND                                                    S27.1 No solution provided
O27 Treatment and disposal of waste water
does not have any detrimental impact on

16 Pines Road, Cooroy                                                                                                                            Page 10 of 13
Log in to download the original file

APPENDIX B - CODE ASSESSMENT.pdf · 569 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.