Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.
The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 16, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnGOOD SHEPHERD LUTHERAN COLLEGE ODYSSEY CONSULTING GROUP Lot 30 on SP170751 Conceptual Stormwater Management Plan 115 Eumundi Noosa Road, Noosaville Project No: K4277 5.3.5 Reporting An inspection report shall be written by a suitably qualified and experienced scientist/engineer following each water quality monitoring episode. The report shall include at least the following information. Name, address and real property description for the development site; Council file reference number (if known); Monitoring locations; Performance criteria; Results for each monitoring location, identifying any breaches of performance criteria, and Recommended corrective actions to be taken and additional sediment and erosion controls, if required. Inspection reports shall be provided to the contractor for their action and compilation in an on-site register. If the above-mentioned performance criteria are exceeded and results from the downstream monitoring stations show significant deterioration from upstream results (if applicable), the contractor shall implement all recommendation of the inspection report within (1) working day of receipt of the report. 5.4 Operational Phase The following sections provide details of the stormwater quality improvement devices (SQID’s) proposed for the operational phase of the development. Odyssey Consulting Group, Stormwater Management Plan (Ref: K4277/P007/E) and Odyssey Consulting Group, Stormwater Detention and Bioretention Details (Ref: K4277/P010/D) included as Appendix F illustrates the size and location of the proposed SQID’s. MUSIC Version 6.3.0 has been used for modelling of the proposed treatment train. 5.4.1 Stormwater Quality Improvement Devices Site runoff from Catchment A1 and Catchment B will be directed onto permeable pavements before draining into two bio-retention basins located at the West (basin 1) and South (basin 2) of the site respectively. Catchment A2 will bypass permeable pavement and be directed into bio-retention basin 1 on the west of the site. Catchment C will bypass treatment and discharge direct to Council stormwater infrastructure. For further details see Odyssey Consulting Group, Stormwater Management Plan (Ref: K4277/P007/E) included in Appendix F. The proposed treatment train for the development is shown in Figure 4. Figure 4: Music Modelling Treatment Train K4277-0002-D 14 February 2019 Page 12 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.