Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.
The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 25, section 2. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn98
&
t 21
d x is
ff
For ground cover species noted with a (*), planting spacings and arrangements in the gardens are intended to achieve a continuous ground cover surface as they mature. 75
e
s ta
sw 49
99 22
2m
t existing 76
50
in g
telstra 100 132
LANDSCAPE LEGEND GENERAL NOTES 23
rk
pits
pa
new stormwater pit 77
51
CAR PARK 1 bioretention
nt
101 133 proposed shrub
de
Refer to survey drawings and consultants drawings for existing setback 2m from 24 & ground cover
s tu
boundry planting
services locations. 52
w
&
102 25 134
ff
s
th
s ta
78
Proposed new trees x 26 Location and extent are indicative only. EXISTING
o tp a
existing 53
refer plant palette 103 JOB:
in e
stormwater 26 BUILDING
g
135
k in
e fo
Builder shall allow to locate all existing services within builders
rl
grate 79
GSL06
we
54
ar
site area and remove or protect as required to suit proposed
cret
rp
104
se
a ll
documentation. bioretention / 27
ito
new crossing 136
in g w
in g
detention basin 80
con
v is
Proposed new shrub and ground cover
is t
105 planting
in g
28
ex
refer plant palette
tin g
retain
81 137
rk
55
pa
DATE:
e x is
106 29
nt
TOTAL AREA 1/11/18
lo c k
de
new stormwater pit 82 138
Area = 4,959m2 56
s tu
in g b
107
&
83
PROPOSED
ff
CAR PARK 57 139
s ta
Existing trees to remain x 9
e x is t
Area = 3,580m2 ( 72.2% ) 108
w
30
in g
CARPARK 1
in g
84
p a rk
58 140
rk
LANDSCAPE
pa
109 85 31
Area = 1,379m2 ( 27.8% )
nt
dent
de
59
proposed new crossing
s tu
32
& s tu
new trees
boundry line
&
110
CAR PARKS 60
ff
Existing trees to be removed x 13 141
s ta
s
Total Number = 149 s ta ff 33 existing sewer manhole
Staff & Student = 1 - 125 61
111 142
Visitor Parking = 126 - 149 34
in g
rk
ce
62
pa
TREES 143
en
112 35 general services
nt
kf
Total Number = 39
de
alignments refer
lin
63
s tu
engineer for details
a in
144 proposed new
g
w
36
k in
Tree to Car space ratio = 1 tree to 4 car spaces
ch
concrete
&
113 126
ar
ff
hardstand
in g
64
s ta
rp
is t
37 145
ito
ex
127
v is
114 65
38 146
line of See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.