Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail MCU18/0097 - Response to Further Advice - Traffic and Stormwater - 115 Eumundi Noosa Rd, Noosaville.
The original of this document is very large (13.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 34, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn NOTE:
FOR STORMWATER DETENTION AND BIORETENTION DETAILS
REFER P010
LEGEND
N
STORMWATER CATCHMENT BOUNDARY
A STORMWATER CATCHMENT I.D.
PROPOSED 100m² STORMWATER LPOD LAWFUL POINT OF DISCHARGE
DETENTION OVER BIORETENTION 3.0m WIDE MAINTENANCE FLOW ARROW
BASIN. TOTAL VOLUME 133m³ ACCESS RAMP
EUMU PROPOSED STORMWATER DRAINAGE
A SUBSOIL DRAIN FROM PERMEABLE NDI N
OOSA PROPOSED EDGE RESTRAINT ERZ IN
CONNECT TO EXISTING P010 PAVING TO OUTLET INTO GULLY PIT ROAD ER ACCORDANCE WITH IPWEA STD DRG RS-080.
GULLY PIT CONCRETE EDGE RESTRAINT TO BE USED
ON ALL TRAFFIC ISLANDS
PROPOSED 20m² PROPOSED BARRIER KERB & CHANNEL
BIORETENTION BASIN 1 B1 TYPE 'B1' (450 CHANNEL)
CONNECT TO REFER IPWEA STD. DRG. NO. RS-080
EXISTING GULLY PIT
PROPOSED KERB IN-LINE GULLY PIT
WITH 2.4m LINTEL
EXISTING SURFACE CONTOURS
B1
EXISTING STORMWATER PIPE
EXISTING TELSTRA
B1 KERB GULLY PIT
PERMEABLE 150m² PERMEABLE 69m² EXISTING WATER MAIN
WITH 2.4m LINTEL
ER
PAVEMENT 2 PAVEMENT 1
EXISTING OVERHEAD ELECTRICAL
EXISTING SEWER MAIN
CONCRETE KERB B1 IN
ACCORDANCE WITH IPWEA
ER
ER
ER ER ER ER PROPOSED TREES
STD DRG RS-080
ER ER ER ER TREES TO REMAIN
C
WALTER HAY
PERMEABLE PAVEMENT
DRIVE
LOT 30
B A2 A1 BIORETENTION BASIN
B SP170751
P010
STORMWATER CATCHMENT
B1 ER ER TABLE
STORMWATER
ER
SUBSOIL DRAINS FROM AREA (m²)
PERMEABLE PAVEMENT TO OUTLET CATCHMENT I.D.
ER
INTO BIO RETENTION BASIN A1 2133
ER
A2 1440
100mm HIGH WEIR EXT A B 1181
CONNECT TO ER C 260
EXISTING GULLY PIT ER TOTAL 5014
PROPOSED PIT TO
EXT A 449
CAPTURE EXTERNAL
FLOWS
ER
PROPOSED 4m²
BIORETENTION BASIN 2
EGRESS
LOT 1
SP228052 1:250 AT A1 0 5 10 15 20m
NO ENTRY
1:500 AT A3
REPORT ISSUE
NOT FOR CONSTRUCTION
CONTRACTOR TO CONFIRM AND
LOCATE ALL EXISTING SERVICES PRIOR
TO COMMENCEMENT OF WORKS
Rev. Date Revision Details Drn App.
Builders Name Client Name Project Details Drawing Title: Drawn Signed Date Scale: Sheet Size
A1
DKC Project Number
Odyssey Consulting Group Designed Signed Date
K4277
Structural and Civil Engineers
PROPOSED CAR PARK
GOOD SHEPHERD STORMWATER AJP
E 14-02-19 ISSUED FOR REPORT EG AJP 115 EUMUNDI ROAD
Odyssey Consulting Group
Suit 5 Corporate House
ABN 81 246 994 126 Telephone: +61 7 5575 7744
Facsimile: +61 7 5641 7992 LUTHERAN COLLEGE MANAGEMENT PLAN
Checked Signed Date
D 05-11-18 ISSUED FOR REPORT SS AJP 155 Varsity Parade Varsity Lakes Q 4227
PO Box 4579 Robina Town Centre
w:odcconsulting.com.au
Email: [email protected]
NOOSAVILLE
C 19-10-18 ISSUED FOR REPORT MGD AP Drawing No. Rev.
Queensland Australia 4230
Approved Signed Date
B 18-10-18 ISSUED FOR REPORT MGD AP
A 14-03-18 ISSUED FOR REPORT DKC AT
P007 E
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.