       particular a driveway crossover in accordance with IPWEAQ standard drawing SEQ
       R-056.
       New Roads
21.    The new roads shown on the Approved Plans must be constructed in accordance
       with the conditions of this Decision Notice and dedicated as road reserve at no cost to
       Councll.
22.    A temporary turnaround facftity must be constructed at the end of each road left
       temporarily Incomplete as a result of the development staging. The temporary
       turnaround facilities must be In accordance with an Operational Works approval and
       must be of sufficient size to accommodate the 3-polnt turn manoeuvre of a Waste
       Collection Vehicle ~CV).
23.    New roads as shown on the Approved Plans must be constructed. The works must
       be undertaken in accordance with an Operational Works approval and must Include in
       particular:
       (a)     Stage 1:
               (0         6 metre wide kerb to kerb formation within a 20 metre wide road
                          reserve;
               (ii)       sealing, kerbing and channelllng (flush kerb may be used where
                          applicable):
               (01)      a cul-de-sac turnaround area with a minimum 9 metre radius and
                          minimum 4 metre wide verge al any point on the turning circle; and
               (iv)      installation of street lighting where necessary.
              These works must be completed prior to the sealing of the Survey Plan for
              Stage 1.

       (b)    Stage 2:
              (I)      6 metre wide kerb to kerb formation within a 20 metre wide road
                       reserve;
              (ii}    a cul-de-sac turnaround area with a minimum 9 metre radius and a
                      minimum 4 metre wide verge at any point on the turning circle
              (Ill)   sealing, kerbing and channelling (flush kerb may be used where
                      applicable);
              (Iv)    a temporary turnaround facility must be constructed adjacent to the
                      to the northern boundary of Lot 36;. The temporary turnaround
                      facility must be in accordance with an Operational Works approval
                      and must be of sufficient size to accommodate the 3-polnt turn
                      manoeuvre of a Waste Collection Vehicle (WCV); and
              (v)     Installation of street lighting where necessary.
             These works must be completed prior to the sealing of the Survey Plan for
             Stage 2.

      (c)     Stage 3:
              (0      All roads - 6 metre wide kerb to kerb formation within a 20 metre
                      wide road reserve;
              (ii)    cul-de-sac turnaround areas with a minimum 9 metre radius and a
                      minimum 4 metre wide verge at any point on the turning circle; and
              (Iii)   installation of street lighting where necessary.
             These works must be completed prior to the sealing of the Survey Plan for ·
             Stage 3.
      Access Easement
      The access driveway within the access easement within Lot 52 as shown on the
      Approved Plans must be constructed. The works must be undertaken in accordance
      with an Operational Works approval and must be:


                                                                                            5
Log in to download the original file

Appendix C - Ecological Assessment.pdf · 15.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.