        Electrlclty and Telecommunlcatlon Services
 30.    A connection to reticulated electricity and telecommunlcallon services must be
        provided to each lot In accordance with an approval for Operational Works and the
        standards and requirements of the relevant service provider.
31.    Unless otherwise stipulated by telecommunlcalions legislation at the time of
       construction, the development must be provided with all necessary conduits, pits and
       pipes to accommodate the future connection of optic fibre technology
       telecommunlcatlons.
32.    Certification must be submllted from all relevant service providers which certify that
       the development has met the requirements of this Decision Notice and all applicable
       legislation at the time of construction.
       Easements
33.    Unless otherwise agreed In wriling by the relevant service provider, any public or third
       party infrastructure located on the subject site must be placed within an easement
       registered against the title of the property. All easements must be designed In
       accordance with the planning scheme and granted at no cost to the Grantee. Where
       the Grantee Is Council or a service authority, the easement documentation must be in
       accordance with the Grantee's standard easement terms.
34.    Draft easement documentation must be submitted to Council for endorsement.
35.    All works must be kept clear of any existing or proposed easements on the subject
       land, unless agreed otherwise In writing by the Grantee.
       Earthworks and Retaining Walls
36.    All fill and associated ballers must be must be undertaken In accordance with an
       Operational Works approval and contained entirely within the subject site, unless
       written permission from the respective landowner(s) Is provided to Council.
       Damage to Services and Asset~
37.    Any damage caused to existing services and assets above or below the ground must
       be repaired:                                                         '
       (a)     where the damage would cause a hazard to pedestrian or vehicle safety,
               Immediately; or
       (b)     Where otherwise, upon completion of the works associated with the
               development.
       Any repair work Which proposes to alter the alignment or level of existing services
       and assets must first be referred to the relevant service authority for approval.
ENVIRONMENT
       Reserves
38.    The land areas identified as uPark" on the approved plans (as amended) must be
       dedicated to the Crown as Reserve(s) for Environmental Purposes. The land to be
       dedicated Is "non-trunk infrastructure• for the pu1poses of the Integrated Planning Act
       1997.
39.    The land areas to be transferred must be unencumbered by services such as pump
       stations, services, easements or slmllar operational uses.
40.    Those areas wbhin the land areas identified as "Park" on the approved plans (as
       amended) which are required for stormwater infrastructure must be dedicated to the
       Crown as Reserve(s) for Drainage.
       The Energex power line easements EMT •a· RP177295 and EMT •c RP177294
       within the land areas Identified as "Park" on the approved plans (as amended) and
       exclusive of areas required for Reserves for Drainage must be dedicated to the
       Crown as Reserve(s) for Open Space.


                                                                                             7
Log in to download the original file

Appendix C - Ecological Assessment.pdf · 15.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.