       (a}     traffic management during all aspects of the construction phase including:
               (0      a Traffic Management Control Plan in accordance with the Manual of
                       Uniform Traffic Control Devices (MUTCD) detailing all temporary
                       slgnage and traffic control measures prior to construction;
               (ii)    maintenance of safe access along Hollett Road both during dally
                       construction and after dally construction has ceased;
               (Ui)    proposed fencing to the site during the conslruclion phase of the
                       development; and
               (Iv)    approval of the Traffic Management Control Plan by the Department
                       of Main Roads (DMR) for any works on State controlled roads;
       (b)    maintenance and protectfon of water quality and existing drainage fines
              through the construction site, through the implementation of appropriate
              erosion and sediment control measures;
      (c}     works programme Identifying key components of the works and their
              respective durations;
      (d)     establishment of a communication protocol with the general public, adjoining
              owners, emergency services and local businesses to advise of agreed
              construction times, impacts on traffic and services and other relevant issues;
      (e)     Identification of complaint management procedures including:
              (I)      contact details for the on-site manager; and
              (ii)    dispute resolution procedures:
      (f)     details on the location of external fill sites/sources, the haulage route, type of
              vehicle to be utlllsed during fllllng operations and frequency of usage. ~
              any damage to the existing road system as a result of haulage operations
              shat► be fully repaired at the applicant's expense; and
      (g)     it ls acknowledged that the Construction Management Plan wlll be a draft
              document requiring flnallsallon upon appointment of the Principal Contractor
              employed to construct the works and a final document will be required to be
              submitted at the Pre-Start Meeting for the project.
      Lawful Point of Discharge
7.    The applicant is advised that a lawful point of discharge for the development Will need
      to be determined and demonstrated as part of a detalled design solution Included with
      the Operational Works application.
      Works within a Watercourse
8.    The applicant is advised that the proposal will involve wotks within a watercourse
      which will require referral to the Department of Environment & Resource
      Management under the Water Act 2000 and Sustainable Planning Act 2009 at the
      time of making an application for operational works.
      Quallfled Person
9.    For the purpose of preparing an Acid Soll and Groundwater Management Plan, a
      qualified person is considered to be either:                   ·
      (a}     a Registered Professional Engineer of Queensland (RPEQ); or
      (b}    a soil scientist with a minimum of 5 years experience.
10.   For the purpose of preparing a Flood Study and cer1lfying flood levels for the
      development, a qualified person is considered to be a Registered Professional
      Engineer of Queensland {RPEQ) experienced In hydraulics and hydrology.
      For the purpose of certifying acoustic treatments for the development, a qualified
      person Is considered to be either:


                                                                                             15
Log in to download the original file

Appendix C - Ecological Assessment.pdf · 15.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.