Original source · versioned page text
Development Application - Vegetation Removal - OPW13/0506
1!1) [.:,
1 1O;~4l ~ lO’/v,)igf J 00Vb
L llil~II~~lijlniIII~~lij~lr ~~-~~~~p;rtment of State Development, Infrastructure and Plann ing -
X0029050
~ 1.7
IDAS form 1~Application details A
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
RECEIVED
-9 JUL
This form must be used for ALL development applications. 2013
SCRC C -
0.9 ’^ R aloundra
You MUST complete ALL questions that are stated to be a mandatory requirement unless othe .s~ id rllHfed Or\:’f
form. .9 r 1- <j..
V
For all development applications, you must:
.
complete this form (IDASform 1-Application details)
.
complete any other forms relevant to your application
.
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
:
, :
\
All terms used on this form have the.meaning given in the Sustainable Planning Act 2009 (SPA)or the Sustainable
Planning Regulation 2009.
"",’,,,,,, ............ ............ ......._,......,’..........-.".....’._...._................’..............’ ........_, .........................’........._,..............-......’.,
,.’...,,~_.’ ~.."_.....,,.~_.-’--...-.’._,"-, - _.... ..........................._..._.’._...._..._._,.._.........’............-’.""’.......-..............-.............-.............-.............,...............’"..........-..............
! This form and any other IDAS form relevant to your application must be used for development applications relating to
! strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the
i Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land
: use plan for the strategic port land, Brisbane core port land or airport land.
,
PLEASE NOTE: This form is not required to accompany requests for compliance assessment.
This form can also be completed online using MyDAS at www.dsdip.gld.gov.au/MyDAS
I Mandatory requirements
Applicant details (Note:the applcant is the pers n responsible for making the application, and need not be the owner
oJ the land,.The ~pplic, nt is res onsible for ensuring the inf0rmation provided on alll,DAS application forms is correct.,.,
Any d velopmentperm t or preliminary approval thal ma be ssued’as a ’’Consequence of ’this app’lcation will be issued"
.
.
toth’,appli aQt.) ., ,~
Name/s (individual or company name in full) I Michael Mikkelsen
For companies, contact name
Postal address 220 Gumboil Rd
;:,uourb Tinbe erwah
Deve\Opmen ~Gun{1:aId I Postcode 14563
Country . .f>~str lia
..
.
.. 5 JU II 1.’\ \ ,.:
Contact phone number
.
-I,",
.
. ’.
07-5442 73~t~::
. .
;-1..
t’ .
.’
.
..
.’il’ ,
Ir dat8j ~~quirertatNa li~\. 615 053
Mobile number (non-ma
Fax number (non-mandatory requirement)
Great state. Great opportunity.
Queen.stand
i\\-.~~l~t!.\;"i:""~~~~~,I’~ .:I.$l.~~,..~,.. ,.., ,:. .,’
.i;F’h;"ffi.,~..~’-, ".*~~Government ~~
[OCR of page images]
SCC CORRESPONDENCE Fre 2tGlO Ly 6 nw
ll
WMNAIWN Department of State Development, Infrastructure and Planning
X0029050
IDAS form 1—Application details
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for ALL development applications.
form.
For all development applications, you must:
¢ complete this form (/DAS form 1—Application details)
¢ complete any other forms relevant to your application
¢ provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the-meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
Planning Regulation 2009.
This form and any other IDAS form relevant to your application must be used for development applications relating to
strategic port land and Brisbane core port land under the Transport Infrastructure Act 1994 and airport land under the
Airport Assets (Restructuring and Disposal) Act 2008. Whenever a planning scheme is mentioned, take it to mean land
use plan for the strategic port land, Brisbane core port land or airport land.
PLEASE NOTE: This form is not required to accompany requests for compliance assessment.
This form can also be completed online using MyDAS at www.dsdip.qid.gov.au/MyDAS
Mandatory requirements
Applicant details (Note: the applicant is the person responsible for making the application and need not be the owner
of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is correct.
Any development permit or preliminary approval that may be issued as a consequence of this application will be issued
to the applicant.)
Name/s (individual or company name in full) Michael Mikkelsen
For companies, contact name
Postal address 220 Gumboil Rd
Suburb | Tinbderwah
re
&2QU nt Rid Postcode 4563
Developmen
Country | Australia
-5 Jun sal
Contact phone number 07 5442 7a:
Mobile number (non-mai atory csqurerl@wva wy 615 053
Fax number (non-mandatory requirement)
Great state. Great opportunity.
Government
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Development Application - Vegetation Removal - OPW13_0506.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 12 pages
Page 2
s
..). ’~
Email address (non-mandatory requirement)
I [email protected]
Applicant’s reference number (non-mandatory
requirement)
1, What Is tbe n.ture oHhe,developmentproposed’and what type’ofappr:ovaNs’being sought? >!i joP,:!~:
Table A-Aspect 1 of the application (If there are additional aspects to the application please list in Table B-Aspect 2.)
a) What is the nature of the development? (Please only tick one box.)
o Material change of use 0Reconfiguring a lot 0Building work I{] Operational work
b) What is the approval type? (Pleaseonly tick one box.)
o Preliminary approval o Preliminary approval Development permit
under s241 of SPA under s241 and s242
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g.six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
I REMOVAL OF VEGETATION
d) What is the level of assessment? (Please only tick one box.)
o Impact assessment Code assessment
Table B-Aspect 2 of the application (If there are additional aspects to the application please list in Table C-
Additional aspects of the application.)
a) What is the nature of development? (Please only tick one box.)
o Material change of use 0Reconfiguring a lot 0Building work 0Operational work
b) What is the approval type? (Please only tick one box.)
o Preliminary approval o Preliminary approval o Development
under s241 of SPA under s241 and s242 permit
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g.six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
d) What is the level of assessment?
o Impact assessment 0Code assessment
Table C-Additional aspects of the application (If there are additional aspects to the application please list in a
separate table on an extra page and attach to this form.)
o Refer attached schedule 0Not required
/DAS form f.---.-Applcat on detai!s
V~)(sjon 3JJ.---.1 .lufy 201;]
, ,.". ’j’]l
~~~_~~~~~~1~ ,
,;,..~’1:’.’.,. .
[OCR of page images]
LT
Email address (non-mandatory requirement) [email protected]
Applicant's reference number (non-mandatory
requirement)
1 What is the nature of the development proposed and what type of approval is being sought?
| Table A—Aspect 1 of the application (If there are additional aspects to the application please list in Table B—Aspect 2.)
a) Whatis the nature of the development? (Please only tick one box.)
Cl Material change of use CI Reconfiguring a lot Cl Building work Vv] Operational work
b) What is the approval type? (Please only tick one box.)
C] Preliminary approval | Preliminary approval Development permit
under s241 of SPA under s241 and s242
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
REMOVAL OF VEGETATION
d) Whatis the level of assessment? (Please only tick one box.)
CL] Impact assessment Code assessment
Table B—Aspect 2 of the application (If there are additional aspects to the application please list in Table C—
Additional aspects of the application.)
a) What is the nature of development? (Please only tick one box.)
CO Material change of use O Reconfiguring a lot Oo Building work im Operational work
b) What is the approval type? (Please only tick one box.)
C Preliminary approval oO Preliminary approval CL Development
under s241 of SPA under s241 and s242 permit
of SPA
c) Provide a brief description of the proposal, including use definition and number of buildings or structures where
applicable (e.g. six unit apartment building defined as a multi-unit dwelling, 30 lot residential subdivision etc.)
d) Whats the level of assessment?
C Impact assessment oO Code assessment
Table C—Additional aspects of the application (If there are additional aspects to the application please list ina
separate table on an extra page and attach to this form.)
oO Refer attached schedule | Not required
IDAS form 1
Page 3
~",ru~ ’i’ 1!’k,l@l\Wi~’,!fiWIiJ’~Iw,jiMliimllit\\jI’:lW ill j~,.iIIIWiII5~~W~"ii’~
2. Location 0,1 the premises (Complete Table qt;lnd/or Table E as.applcable. ’lde,ntify"ea,chrioJ in a sep?fat row.),.
Table D-Street address and lot on plan for the premises or street address and lot on plan for the land adjoining or
adjacent to the premises (Note:this table is to be used for applications involving taking or interfering with water).
(Attach a separate schedule if there is insufficient space in this table.)
[{] Street address and lot on plan (All lots must be listed.)
o Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.)
Street address Lot on plan Local government area
description (e.g. Logan, Cairns)
Lot Unit Street Street name and official Post- Lot no. Plan type
no. no. suburb/ locality name code and plan no.
i) 220 GUMBOIL ROAD 4563 1 RP 124552 SCRC
ii)
iii)
Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zone/s for each lot in a
separate row in the below table. Non-mandatory)
Lot Applicable zone / precinct Applicable local plan / precinct Applicable overlay/s
i)
ii)
iii)
Table E-Premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not
adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient
space in this table.)
Coordinates Zone Datum Local government
(Note:place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
o GDA94
o WGS84
o other
,,3. To.tal ~rea Mhe :pr mis~,s Drt whioh the cieye!opnie"ti$.propoSed~ ndi at ’;~qyareYri tr st’"~~; .~ i i
14019M2
’4;" u"rreotuse/s<pjt. the,,:premrse~ (a.g.v~cant’.land, hO\JS ,apartment buildin~, cane farm ~tc.) ~. ~
,
!
I HOUSE
IDAS form 1......App!cat on fJtaFs
Vwsion 3.()......1 ,July 2013
~~~r~~~~~&~.(lmI!Ar~~~~~"J rt;l"%.... ~
[OCR of page images]
2 Location of the premises (Complete Table D and/or Table E as applicable. Identify each lot in a separate row.)
Table D—Street address and lot on plan for the premises or street address and lot on plan for the land adjoining or
adjacent to the premises (Note: this table is to be used for applications involving taking or interfering with water).
(Attach a separate schedule if there is insufficient space in this table.)
Street address and lot on plan (All lots must be listed.)
oO Street address and lot on plan for the land adjoining or adjacent to the premises (Appropriate for
development in water but adjoining or adjacent to land, e.g. jetty, pontoon. All lots must be listed.)
Street address Lot on plan Local government area
description (e.g. Logan, Cairns)
Lot Unit Street Street name and official Post- Lot no. Plan type
no. no. suburb/ locality name code and plan no.
i) 220 GUMBOIL ROAD 4563 1 RP 124552 SCRC
ii)
iii)
Planning scheme details (If the premises involves multiple zones, clearly identify the relevant zone/s for each lot ina
separate row in the below table. Non-mandatory)
Lot Applicable zone / precinct Applicable local plan / precinct Applicable overlay/s
i)
ii)
ili)
Table E—Premises coordinates (Appropriate for development in remote areas, over part of a lot or in water not
adjoining or adjacent to land e.g. channel dredging in Moreton Bay.) (Attach a separate schedule if there is insufficient
space in this table.)
Coordinates Zone Datum Local government
(Note: place each set of coordinates in a separate row) reference area (if applicable)
Easting Northing Latitude Longitude
LI apaga
C1 wese4
CO other
3. Total area of the premises on which the development is proposed (indicate square metres)
4019M2
4. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm etc.)
HOUSE
IDAS form 1
Page 4
~\mIlli\lmS_~~~~~i~"I1I~~.’i~
5. Are there any current approvals (e.g~ a preliminary approval)associated with this applic;’3tior ? (Non~
(,;
maQdatory requirement) :,,’ ,"’
[{] No o Yes-provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
6. Is oWner’s consent required for.thls’applicati n? (Refer to notes attheendot this form for more ihforrfi tion.)
[(] No
o Yes-complete either Table F, Table G or Table H as applicable
Table F
Name of owner/s of the land
I/We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land
Date
Table G
Name of owner/s of the land I
o The owner’s written consent is attached or will be provided separately to the assessment manager.
Table H
Name of owner/s of the land I
o By making this application, I, the applicant, declare that the owner has given written consent to the making of the application.
<~ ’\"’1
".n,
7. Identify if any of the following apply to the premises (TiCk applicabll? box/es.) ~: ~~,t; }T’ X. 4.i ,~’ -:; ~N’
f;t,
~..t...t: ~"
o Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)-complete Table I
o On strategic port land under the Transport Infrastructure Act 1994--complete Table J
o In a tidal water area-complete Table K
o On Brisbane core port land under the Transport Infrastructure Act 1994 (Notable requires completion.)
o On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion)
Table I
Name of water body, watercourse or aquifer
Table J
Lot on plan description for strategic port land Port authority for the lot
IDAS form 1....Applcat oj) detai!s
Version 3J)......1 ,futy 2013
~j( ,.;\
’~ ""."j,’’-,i’ ..~<, " .’
n.’
.
[OCR of page images]
5. Are there any current approvals (e.g. a preliminary approval) associated with this application? (Non-
mandatory requirement)
No [_] Yes—provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
6. Is owner’s consent required for this application? (Refer to notes at the end of this form for more information.)
No
| Yes—complete either Table F, Table G or Table H as applicable
Table F
Name of owner/s of the land
(We, the above-mentioned owner/s of the land, consent to the making of this application.
Signature of owner/s of the land
Date
Table G
Name of owner/s of the land
O The owner's written consent is attached or will be provided separately to the assessment manager.
Table H
Name of owner/s of the land
oO By making this application, |, the applicant, declare that the owner has given written consent to the making of the application.
7. Identify if any of the following apply to the premises (Tick applicable box/es.)
C Adjacent to a water body, watercourse or aquifer (e.g. creek, river, lake, canal)—complete Table |
| On strategic port land under the Transport Infrastructure Act 1994—complete Table J
O In a tidal water area—complete Table K
[_] On Brisbane core port land under the Transport Infrastructure Act 1994 (No table requires completion.)
| On airport land under the Airport Assets (Restructuring and Disposal) Act 2008 (no table requires completion)
Table |
Name of water body, watercourse or aquifer
Table J
Lot on plan description for strategic port land Port authority for the lot
IDAS form 1
i
Page 5
~~~~.~~~~~~~~~~~~---
Table K
Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
8. Are ther~ any existing easements on the premises? (e.g.for vehicular access, electricity, overland flow,
water etc)
[Z] No D Yes-ensure the type, location and dimension of each easement is included in the plans submitted
9. Does the proposal inclUde new building wQrk or operational,work on the premises? (Including any -j!"
",
.
,
services) ,
J’
,iI!’
[Z] No D Yes-ensure the nature, location and dimension of proposed works are included in plans submitted
,10. "’stnepay.:nent of a portable long sel’~iCe!eave levy applicable t,o this application? (Refer to notes at the
~end oJ this form f r r)1ore ihformation:)
[Z] No-go to question 12 DYes
Has th~ portable long service leave;le"y been’pald?’(Refer to notes at the nd f this’form for more’ ,~~.;
,11. .
K
.
.,
~
infoJmatiotl,) ~f
j,,,,1 "
D No
D Yes---complete Table L and submit with this application the yellow local government/private certifier’s copy of the
receipted QLeave form
Table L
Amount paid Date paid QLeave project number (6digit number
(dd/mm/yy) starting with A, S, E, L or P)
. ..
’ ,. ." ,
’. \
~
.
;::,:,:.;.-\’~ ,
".
12. Has the local ,government agreed to apply a superseded planning scheme to this application under
section 96 Qf the Sustainable Plf)nning Act 20091
[Z] No
D Yes-please provide details below
Name of local government Date of written notice given Reference number of written notice given
by local government by local government (if applicable)
(dd/mm/yy)
IDAS form 1,.""Applcat on (}et fs
VfHsfon 3.r)-"", 1 ,Iii}2013
[OCR of page images]
Table K
Name of local government for the tidal area (if applicable) Port authority for the tidal area (if applicable)
8. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
water etc)
No [_] Yes—ensure the type, location and dimension of each easement is included in the plans submitted
9. Does the proposal include new building work or operational work on the premises? (Including any
services)
No C Yes—ensure the nature, location and dimension of proposed works are included in plans submitted
10. Is the payment of a portable long service leave levy applicable to this application? (Refer to notes at the
end of this form for more information.)
No—go to question 12 [] Yes
11. Has the portable long service leave levy been paid? (Refer to notes at the end of this form for more
information.)
[J No
Yes—complete Table L and submit with this application the yellow local government/private certifier's copy of the
receipted QLeave form
Table L
Amount paid Date paid QLeave project number (6 digit number
(dd/mm/yy) starting with A, B, E, L or P)
12. Has the local government agreed to apply a superseded planning scheme to this application under
section 96 of the Sustainable Planning Act 2009?
[¥] No
[] Yes—please provide details below
Name of local government Date of written notice given | Reference number of written notice given
by local government by local government (if applicable)
(dd/mm/yy)
IDAS form 1
Ye.
Page 6
~~~’~~~~G=:rJ.!’S~::il:ft~
13. List below all of the forms and supporting information that accompany th s pplicatioh (Inclt,l’d an,lo1$
fo:msLfh~ckJists, mandatory sup ~iQ~,infqtm’ation etr th ~ ~in be,S’ b~itteJj a,S P’flrt:ot;th!~ 9P~!ic&tW~! t~;
’ ., ’.’
’’<’ ,
thIS questIon does not’apply lor app,hcatl s made onhne uSIng MyDAS)"
Description of attachment or title of attachment Method of lodgement to
assessment manager
X ID/f:S Fo M 6.
,’."
j, ~1;.."’l-~ ’;-:. ’~~". i,,:’
.,
{~!i ~:~ ~~’.
.
14.’Applicant!’sdecl r~Ji~n ,
,~~ t;
. ~
,
.~ .’~
~\;;~!:: x. ,Ii-
j
[Z]By making this application, I declare that all information in this application is true and correct (Note:it is unlawful to
provide false or misleading information)
Notes for completing this form
. Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly-made application.
Note, the assessment manager has discretion to accept an application as properly made despite any non-
compliance with the requirement to provide mandatory supporting information under section 260(1 )(c) of the
Sustainable Planning Act 2009
Applicant details
. Where the applicant is not a natural person, ensure the applicant entity is a real legal entity.
Question 1
. Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development and the type of
assessment. Where schedule 3 identifies assessable development as "various aspects of development" the
applicant must identify each aspect of the development on Tables A, Band C respectively and as required.
Question 6
. Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for
an application. Section 260(1 )(e) of the Sustainable Planning Act 2009 provides that if the owner’s consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application. If a development application relates to a state resource, the application is not required to be supported
by evidence of an allocation or entitlement to a state resource. However, where the state is the owner of the
subject land, the written consent of the state, as landowner, may be required. Allocation or entitlement to the state
resource is a separate process and will need to be obtained before development commences.
Question 11
. The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.
. The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
IDAS form t....-AppHcat on detaJis
V~m;jon 3J)......1 ,!uiy 2013
~~~~_~’!l1l~~~~~~"’~’~~~~~
[OCR of page images]
13. List below all of the forms and supporting information that accompany this application (Include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note:
this question does not apply for applications made online using MyDAS)
Description of attachment or title of attachment Method of lodgement to
assessment manager
x (AS foem 6.
14. Applicant’s declaration
By making this application, | declare that all information in this application is true and correct (Note: it is unlawful to
provide false or misleading information)
Notes for completing this form
Section 261 of the Sustainable Planning Act 2009 prescribes when an application is a properly-made application.
Note, the assessment manager has discretion to accept an application as properly made despite any non-
compliance with the requirement to provide mandatory supporting information under section 260(1)(c) of the
Sustainable Planning Act 2009
Applicant details
Where the applicant is not a natural person, ensure the applicant entity is a real legal entity.
Question 1
¢ Schedule 3 of the Sustainable Planning Regulation 2009 identifies assessable development and the type of
assessment. Where schedule 3 identifies assessable development as “various aspects of development” the
applicant must identify each aspect of the development on Tables A, B and C respectively and as required.
Question 6
Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required for
an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
required under section 263, then an application must contain, or be accompanied by, the written consent of the
owner, or include a declaration by the applicant that the owner has given written consent to the making of the
application. If a development application relates to a state resource, the application is not required to be supported
by evidence of an allocation or entitlement to a state resource. However, where the state is the owner of the
subject land, the written consent of the state, as landowner, may be required. Allocation or entitlement to the state
resource is a separate process and will need to be obtained before development commences.
Question 11
The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
service leave levy is payable.
The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.
IDAS form 1
Yers,
Page 7
~,uw~~_~~S’=~_I"!’WI.’H=’n!!!!f;i;lJ=m:;’==:,5.;;’! H:’.iiDtIIlUilIlD+=’:im.~
Ouestlon 12
The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
Building and construction industry notification and payment forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qld.gov.au. For
further information contact QLeave on 1800 803 481 or visit www.qleave.qld.gov.au.
Privacy-The information collected in this form will be used by the Department of State Development, Infrastructure
and Planning (DSDIP),assessment manager, referral agency and/or building certifier in accordance with the
processing and assessment of your application. Your personal details should not be disclosed for a purpose outside of
the IDAS process or the provisions about public access to planning and development information in the Sustainable
Planning Act 2009, except where required by legislation (including the Right to Information Act 2009) or as required by
Parliament. This information may be stored in relevant databases. The information collected will be retained as
required by the Public Records Act 2002.
OFFICE USE ONLY
Date received I Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To
I Council. I have been engaged as the private certifier for the
building work referred to in this application
BSA Certification license Building
Date of engagement Name
number classification/s
OLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if
applicable.)
Date receipted
Name of officer
QLeave project Amount paid form sighted by
Description of the work Date paid who sighted the
number ($) assessment
form
manaaer
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Old 4002
tel 13 OGOV (1374 68)
info@dsdip,gld.gov,au IDAS form t-...,Applcation d taJis
Vf-){SfOfl S.O.,...,1 .f~I}201J
www.dsdlp.qld.gov.au
~~~~~1llll ~.3jal\1lmllif~X’ .
""’I ",,’
[OCR of page images]
Question 12
e The portable long service leave levy need not be paid when the application is made, but the Building and
Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
permit is issued.
¢ Building and construction industry notification and payment forms are available from any Queensland post office or
agency, on request from QLeave, or can be completed on the QLeave website at www.qleave.qid.gov.au. For
further information contact QLeave on 1800 803 481 or visit www.qleave.qid.gov.au.
Privacy—The information collected in this form will be used by the Department of State Development, Infrastructure
and Planning (DSDIP), assessment manager, referral agency and/or building certifier in accordance with the
processing and assessment of your application. Your personal details should not be disclosed for a purpose outside of
the IDAS process or the provisions about public access to planning and development information in the Sustainable
Planning Act 2009, except where required by legislation (including the Right to Information Act 2009) or as required by
Parliament. This information may be stored in relevant databases. The information collected will be retained as
required by the Public Records Act 2002.
OFFICE USE ONLY
Date received Reference numbers
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER
To Council. | have been engaged as the private certifier for the
building work referred to in this application
Date of saant || Nar BSA Certification license Building
ate of engageme' lame number classification/s
QLEAVE NOTIFICATION AND PAYMENT (For completion by assessment manager or private certifier if
applicable.)
Date receipted
form sighted by
assessment
manager
Name of officer
who sighted the
form
QLeave project Amount paid
number ($) Date paid
Description of the work
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Qid 4002
tel 13 QGOV (13 74 68)
ink ip.aid. gov. IDAS form 1
www.dsdip.qid.gov.au
Page 8
~;J~"im~~mM.iaw;;~.1&i!im:~i’ili’I; ;:.l Department of State Development, Infrastructure and Planning t~
IDAS form 6-Building or operational work assessable
against a planning scheme
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for development applications for building work or operational work assessable against a
planning scheme.
You MUST complete All questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications, you must:
.
complete IDAS form 1-Application details
complete any other forms relevant to your application
.
provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA)or the Sustainable
Planning Regulation 2009.
This form must be used for building work or operational work relating on strategic port land and Brisbane core port land
under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act
2008 that requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned,
:
take it to mean land use plan for the strategic port land, Brisbane core port land or airport land.
This form can also be completed online using MyDAS at www.dsdlp.qld.qov.au/MyDAS
I Mandatory requirements
Whatls th.e na,ture of the work. that requires assessment’against plaMi.ng sChert) ? (Tick all appH able
t’i .\. ,!ii ’"
~’"t.,.Ii. .:
.’
t""’_" boxes’.) .’ ’.’ .~’. .:IJ ,f"
.
.
.
’.~ ~<t
.’
.
’
o Building work-<:omplete Table A [Z] Operational work-complete Table B
Table A
a) What is the nature of the building work (e.g. building, repairing, altering, underpinning, moving or demolishing a
building)?
b) Are there any current approvals associated with this application? (e.g. material change of use.)
D No D Yes- provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
Great state. Great opportunity.
Quee.nsland
’~~~--~"~if1~:;:’ ’ft’=Ji{’~ Jt-J&Vl~~.=1~~"’~~.(_~~ ’\~ "",., ~ -.-" ..
t ’.>_ ..
,i Government l’~jlla
[OCR of page images]
Department of State Development, Infrastructure and Planning
IDAS form 6—Building or operational work assessable
gainst a planning sch eme
(Sustainable Planning Act 2009 version 3.0 effective 1 July 2013)
This form must be used for development applications for building work or operational work assessable against a
planning scheme.
You MUST complete ALL questions that are stated to be a mandatory requirement unless otherwise identified on this
form.
For all development applications, you must:
* complete /DAS form 1—Application details
* complete any other forms relevant to your application
¢ provide any mandatory supporting information identified on the forms as being required to accompany your
application.
Attach extra pages if there is insufficient space on this form.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 (SPA) or the Sustainable
Planning Regulation 2009.
This form must be used for building work or operational work relating on strategic port land and Brisbane core port land
under the Transport Infrastructure Act 1994 and airport land under the Airport Assets (Restructuring and Disposal) Act
2008 that requires assessment against the land use plan for that land. Whenever a planning scheme is mentioned,
take it to mean land use plan for the strategic port land, Brisbane core port land or airport land.
This form can also be completed online using MyDAS at www.dsdip.qid.gov.au/MyDAS
Mandatory requirements
1. What is the nature of the work that requires assessment against a planning scheme? (Tick all applicable
|
| boxes.)
{_] Building work—complete Table A Operational work—complete Table B
| Table A
a) What is the nature of the building work (e.g. building, repairing, altering, underpinning, moving or demolishing a
building)?
b) Are there any current approvals associated with this application? (e.g. material change of use.)
[] No [-] Yes— provide details below
|
|
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
Great state. Great opportunity.
Queensland
Government
Page 9
~~..~~~-~~~~~
Table B
a) What is the nature of the operational work? (Tick all applicable boxes.)
D Road works D Stormwater D Water infrastructure
D Drainage works D Earthworks D Sewerage infrastructure
D Landscaping D Signage 0 Clearing vegetation under the planning scheme
D Other-provide details
b) Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)
o No 0 Yes-specify the number of lots being created I
c) Are there any current approvals associated with this application? (E.g. material change of use.)
No 0 Yes-provide details below
List of approval reference/s Date approved (dd/mm/yy) Date approval lapses (dd/mm/yy)
2. ’Whatis the ’do lar~Vfllle Of the,proposed building work?
..
~:~~;~,~,~\~ ~.’ $
i>(l c GS!I m~!eJiaJs~ndlabourJ",,:, "’,,;,,;;, ,,’"
,
1~
.~ :, ,
l ’~~"~~.
’.,
’wb tis’U-.e d il~r’YaI of th~ pr pose(top ’:atfo~al w rk? ,if ."~ ~:f<~’ r;’"
3.
’(ln GST.materialsandlabour.,)"~
yo
f r:I ~",,’
,.,
:~" "
’I
,
,.
,Q; ~ ~ .’~p
...)In >1 ~ :~’. ~
..’ $ 500.00
I Mandatory supporting Information
..~
’I’ ’’’,
4~.~;4{},qp’~fifrpt’~~!’th ,fo Iowl.fI~;manda(or ,$ RPOrting i\’lt()~ tion,accomp~nles’thlsiappllc ’tion .
l~.’ .~J.(-i,~
Mandatory supporting information Confirmation of Method of
lodgement lodgement
All applications Involving building work or operational work
A site plan drawn to an appropriate scale (1:100, 1 :200 or 1 :500 are oConfirmed
recommended scales) which shows the following:
. the location and site area of the land to which the application relates
(relevantland)
.
-
the north point
. the boundaries of the relevant land
. the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is
required for all lots)
.
any existing or proposed easements on the relevant land and their
function
.
any access limitation strips
. all existing and proposed roads and access points on the relevant land.
IDAS form 6.....Bui! mg or opW<1tion i work !’l$sessab!e
figainst a p/wmirl[J scheme
Version 3,(},,’,,1 ,jOy 2018
~~~~~~~~$’: ~;.
[OCR of page images]
Table B
a) — What is the nature of the operational work? (Tick all applicable boxes.)
[_] Road works [_] Stormwater [_] Water infrastructure
{_] _ Drainage works [] Earthworks [| Sewerage infrastructure
C] Landscaping [] _ Signage Clearing vegetation under the planning scheme
{_] Other—provide details
b) Is the operational work necessary to facilitate the creation of new lots? (E.g. subdivision.)
No [] Yes—specify the number of lots being created
c) Are there any current approvals associated with this application? (E.g. material change of use.)
No [_] Yes—provide details below
List of approval reference/s Date approved (dd/mm/yy)
Date approval lapses (dd/mm/yy)
2. What is the dollar value of the proposed building work? $
(Inc GST, materials and labour.)
3. What is the dollar value of the proposed operational work? $ 500.00
(Inc GST, materials and labour.)
Mandatory supporting information
4. _ Confirm that the following mandatory supporting information accompanies this application
Mandatory supporting information
Confirmation of | Method of
lodgement lodgement
All applications involving building work or operational work
A site plan drawn to an appropriate scale (1:100, 1:200 or 1:500 are
recommended scales) which shows the following:
e the location and site area of the land to which the application relates
(relevant land)
the north point
the boundaries of the relevant land
the allotment layout showing existing lots, any proposed lots (including the
dimensions of those lots), existing or proposed road reserves, building
envelopes and existing or proposed open space (note: numbering is
required for all lots)
© any existing or proposed easements on the relevant land and their
function
any access limitation strips
all existing and proposed roads and access points on the relevant land.
Confirmed
IDAS form 6---£:
Page 10
~~~~~:wr~":"’~~~!’iAI"’’I!=’:~’_~M=!:.’_!II1!\ li~
A statement about how the proposed development addresses the local D Confirmed
government’s planning schemes and any other planning documents relevant
to the application.
A statement addressing the relevant part(s) of the State Development D Confirmed
Assessment Provisions (SDAP).
D Not applicable
Applications for building work (including extensions and demolition that is assessable development)
Floor plans drawn to an appropriate scale (1 :50, 1:100 or 1 :200 are D Confirmed
recommended scales) which show the following:
0Not applicable
. the north point
. the intended use of each area on the floor plan (for commercial, industrial
or mixed use developments only)
. the room layout (for residential development only) with all rooms clearly
labelled
. the existing and the proposed built form (for extensions only)
. the gross floor area of each proposed floor area.
Elevations drawn to an appropriate scale (1:100,1 :200 or 1 :500 are D Confirmed
recommended scales) which show plans of all building elevations and
[{]Not applicable
facades, clearly labelled to identify orientation (e.g. north elevation).
Plans showing the size, location, proposed site cover, proposed maximum D Confirmed
number of storeys, and proposed maximum height above natural ground level
[{]Not applicable
of the proposed new building work.
Plans showing the extent of any demolition that is assessable development. D Confirmed
[{]Not applicable
Applications for operational work involving earthworks (filling and excavating)
Drawings showing: D Confirmed
.
existing and proposed contours [{]Not applicable
.areas to be cut and filled
. the location and level of any permanent survey marks or reference
stations used as datum for the works
. the location of any proposed retaining walls on the relevant land and their
height
. the defined flood level (if applicable)
. the fill level (if applicable).
Applications for operational work involving roadworks
Drawings showing: D Confirmed
.
existing and proposed contours [{]Not applicable
. the centreline or construction line showing chainages, bearings, offsets if
the construction line is not the centreline of the road and all intersection
points
. information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if applicable) and
curve widening (if applicable)
. kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
.
edge of pavement where kerb is not constructed
.
position and extent of channelisation
. location and details of all traffic signs, guideposts, guardrail and other
street furniture
. pavement markinQs includinQ details on raised pavement markers
IDAS form 6....Buif<ihg or opilrationa! work a.ssf:n.;s:~bft?
against a plannirl[J scheme
V rsion 3.().....j ,July 2D1:3
l1t~~~’t,.~~a~~~~~;t_ "~
[OCR of page images]
A statement about how the proposed development addresses the local
government's planning schemes and any other planning documents relevant
to the application.
[_] Confirmed
A statement addressing the relevant part(s) of the State Development
Assessment Provisions (SDAP).
LC] Confirmed
LJ Not applicable
Applications for building work (including extensions and demolition that i
Floor plans drawn to an appropriate scale (1:50, 1:100 or 1:200 are
recommended scales) which show the following:
e the north point
© the intended use of each area on the floor plan (for commercial, industrial
or mixed use developments only)
e the room layout (for residential development only) with all rooms clearly
labelled
the existing and the proposed built form (for extensions only)
the gross floor area of each proposed floor area.
LC] Confirmed
[Not applicable
Elevations drawn to an appropriate scale (1:100, 1:200 or 1:500 are
recommended scales) which show plans of all building elevations and
facades, clearly labelled to identify orientation (e.g. north elevation).
CL Confirmed
Not applicable
Plans showing the size, location, proposed site cover, proposed maximum
number of storeys, and proposed maximum height above natural ground level
of the proposed new building work.
Cc] Confirmed
Not applicable
Plans showing the extent of any demolition that is assessable development.
oO Confirmed
Not applicable
Applications for operational work involving earthworks (filling and excavating)
Drawings showing:
¢ existing and proposed contours
* areas to be cut and filled
© the location and level of any permanent survey marks or reference
stations used as datum for the works
© the location of any proposed retaining walls on the relevant land and their
height
the defined flood level (if applicable)
the fill level (if applicable).
fll Confirmed
Not applicable
Applications for operational work involving roadworks
Drawings showing:
e existing and proposed contours
© the centreline or construction line showing chainages, bearings, offsets if
the construction line is not the centreline of the road and all intersection
points
¢ information for each curve including tangent point chainages and offsets,
curve radii, arc length, tangent length, superelevation (if applicable) and
curve widening (if applicable)
e kerb lines including kerb radii (where not parallel to centreline) and
tangent point changes (where not parallel to centreline)
© edge of pavement where kerb is not constructed
position and extent of channelisation
location and details of all traffic signs, guideposts, guardrail and other
street furniture
* pavement markings including details on raised pavement markers
L] Confirmed
Not applicable
IDAS form 6 uicing &
is assessable development)
Page 11
~~ ~~~~~;.i’1"~1..mllW! =!!l=.\\,/!.rjl!Ii’R__
.
catchpit, manhole and pipeline locations
.
drainage details (if applicable)
.cross road
drainage culverts (if applicable)
.concrete footpaths and cycle paths
.location and details for access
points, ramps and invert crossings
.
changes in surfacing material.
Applications for operational work involving storm water drainage
Drawings showing: D Confirmed
.
existing and proposed contou rs [Z]Not applicable
.
drainage locations, diameters and class of pipe, open drains and
easements
. manhole location, chainage and offset or coordinates and inlet and outlet
invert levels
. inlet pit locations, chainage and offset or coordinates and invert and kerb
levels.
Applications for operational work involving water reticulation
Drawings showing: D Confirmed
. kerb lines or edge of pavement where kerb is not constructed [Z]Not applicable
. location and levels of other utility services where affected by water
reticulation works
.
pipe diameter, type of pipe and pipe alignment
.water main alignments
.water supply pump station details (if applicable)
.minor reservoir details (if applicable)
. conduits
. location of valves and fire hydrants
. location of house connections (if applicable)
. location of bench marks and reference pegs.
Applications for operational work involving sewerage reticulation
Drawings showing: D Confirmed
. location of all existing and proposed services [Z]Not applicable
. location of all existing and proposed sewer lines and manhole locations
. location of all house connection branches
. kerb lines or edge of pavement where kerb is not constructed
.
chainages
.
design sewer invert levels
.
design top of manhole levels
.
type of manhole and manhole cover
.
pipe diameter, type of pipe and pipe alignment
. location of house connections (if applicable)
.sewer pump station details (if applicable).
Applications for operational work involving street lighting
Drawings showing: D Confirmed
. location of all light poles and service conduits [Z]Not applicable
. location of all other cross road conduits
.
type of wattage and lighting
.
any traffic calming devices
. additional plans for roundabouts and major roads (if applicable)
. details of any variations to normal alignment
IDAS form 6....BI/ hg or opt1!’ton !work ftssessab!e
{1gainst pl<.mnh J scheme
Versiop 3.0.....1 ,July 2M:1
~~~.~~r,~,~~~~.
[OCR of page images]
catchpit, manhole and pipeline locations
drainage details (if applicable)
cross road drainage culverts (if applicable)
concrete footpaths and cycle paths
location and details for access points, ramps and invert crossings
changes in surfacing material.
Applications for operational work involving stormwater drainage
Drawings showing:
existing and proposed contours
drainage locations, diameters and class of pipe, open drains and
easements
manhole location, chainage and offset or coordinates and inlet and outlet
invert levels
inlet pit locations, chainage and offset or coordinates and invert and kerb
levels.
CL Confirmed
Not applicable
Applications for operational work involving water reticulation
Drawings showing:
kerb lines or edge of pavement where kerb is not constructed
location and levels of other utility services where affected by water
reticulation works
pipe diameter, type of pipe and pipe alignment
water main alignments
water supply pump station details (if applicable)
minor reservoir details (if applicable)
conduits
location of valves and fire hydrants
location of house connections (if applicable)
location of bench marks and reference pegs.
C] Confirmed
Not applicable
Applications for operational work involving sewerage reticulation
Drawings showing:
location of all existing and proposed services
location of all existing and proposed sewer lines and manhole locations
location of all house connection branches
kerb lines or edge of pavement where kerb is not constructed
chainages
design sewer invert levels
design top of manhole levels
type of manhole and manhole cover
pipe diameter, type of pipe and pipe alignment
location of house connections (if applicable)
sewer pump station details (if applicable).
[_] Confirmed
Not applicable
Applications for operational work involving street lighting
Drawings showing:
location of all light poles and service conduits
location of all other cross road conduits
type of wattage and lighting
any traffic calming devices
additional plans for roundabouts and major roads (if applicable)
details of any variations to normal alignment
CL Confirmed
Not applicable
IDAS form 6 3uing ©
Page 12
.:N :~.
~~ .,~"mW’~~~~~.~. #;, :_~~
. details of lighting levels.
Applications for operational work involving public utility services
Drawings showing: D Confirmed
.
any existing light poles and power poles [{]Not applicable
.
any existing underground services
. details of proposed services
. alteration to existing services.
Applications for operational work involving landscaping works
Drawings showing: D Confirmed
. the location of proposed plant species [(]Not applicable
.a plant schedule indicating common and botanical names, pot sizes and
numbers of plants
.
planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden
edge
.the location and type of any existing trees to be retained
.construction details of planter boxes, retaining walls and fences
.the proposed maintenance period
.
irrigation system details.
Privacy-Please refer to your assessment manager, referral agency and/or building certifier for further details on the
use of information recorded in this form.
OFFICE USE ONLY
Date received I Reference numbers
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Old 4002
tel 13 OGOV (137468) IDAS form 6.....BI/J mg or Opf;1! tional work assessable
[email protected] against p/<1nnhg schet?1&
V (SfOfl :3J]....1 .lily 2013
www.dsdip.qld.gov.au
~-",_~_l~~~l\1!&l~i~mM’m .(Wf~~~~~~:lr~
[OCR of page images]
© details of lighting levels.
Applications for operational work involving public utility services
Drawings showing:
e any existing light poles and power poles
e any existing underground services
© details of proposed services
¢ alteration to existing services.
LC] Confirmed
Not applicable
Applications for operational work involving landscaping works
Drawings showing:
® the location of proposed plant species
numbers of plants
edge
the proposed maintenance period
irrigation system details.
* aplant schedule indicating common and botanical names, pot sizes and
¢ planting bed preparation details including topsoil depth, subgrade
preparation, mulch type and depth, type of turf, pebble, paving and garden
the location and type of any existing trees to be retained
construction details of planter boxes, retaining walls and fences
CL Confirmed
Not applicable
Privacy—Please refer to your assessment manager, referral agency and/or building certifier for further details on the
use of information recorded in this form.
OFFICE USE ONLY
Date received
The Sustainable Planning Act 2009 is administered by the Department of State Development, Infrastructure and
Planning. This form and all other required application materials should be sent to your assessment manager and any
referral agency.
Department of State Development, Infrastructure and Planning
PO Box 15009 City East Qld 4002
tel 13 QGOV (13 74 68)
inf ip.qid.gov.ai
www.dsdip.qld.gov.au
Reference numbers
IDAS form 6-—-3128i9g &
Page 13
t/V-
~
VrrJ
bg
~ t~’
t .,
1~\~? Pf
10t.731 m
- 131003’
~ "
~ PRO
-
c.,\)~ . ~
x...;Q.>W- TO ~ ~~~ ,/- LOT
STORM WATER RUNOrr TO BE TAKEN o S
G,O’ EXISTING DOMESTIC SYSTEM ON SITE.
Qc,--’(ttJ""’C u
i .(~,)J’ ~
N
~~< ~~{ PAR
COL
~ I
\)
-
-At
O~ b,~ LOC~
;S
I
Q.~
fJ’
~Q..~~ PROPOSED EXTENSION (VERANDAH)V~~ 00
r.,#
0)
E
O’J
I,)Vo-
{~
~
’:’
/:t
~,.A EXISTING RESIDENCE
~
0.1J I
~~
~
-
...
3.(’’’0
17),
~ 15~OI4’
t(rfll- ~If
~ (;-
-
4\~ ~~~y
Vln;
~
t^
eiJtJJ
G
Uft,f80IL ROAD
dah
PROPOSED EXTENSION FOR CONTRACTOR ))lUST VERIFY
BRIAN HILDEBRAND DRAFTING
(
All tlEASUREIAENTS ON SITE
P. McDOWELL.
POBOX 231 NOOSA HEADS 4567 BEfORE CO"NENCING ANY WORK
’"
a;"’~
phone/fox 07 54~7 7784 No 220 GUMBOIL ROAD
Q B S A No 78055 TlMBEERWAH
6M~o ~ DR shined
--
[OCR of page images]
101.731 _m — 431003"
ot [ PRO
STORM WATER RUNOFF TO BE TAKEN TO & ae x . ~——
EXISTING DOMESTIC SYSTEM ON SITE. <RO f LOT
awe” atl! S PAR
Hors, KU" bh COL
PROPOSED EXTENSION (VERANDAH) wd A Loc:
37 EXISTING RESIDENCE 2
‘
we WF sb
ROAD
BRIAN HILDEBRAND DRAFTING | PROPOSED EXTENSION FOR | conteacroa usr verry = |-SS
P 0 BOX 231 NOOSA HEADS 4567 P. McDOWELL. ALL MEASUREMENTS ON SITE | _*
phone/fax 07 5447 7784 No 220 GUMBOIL ROAD BEFORE COMMENCING ANY WORK
DR
Q 8S A No 78055
TIMBEERWAH
signed
1