Minor Change Existing Approval - MCU21 0231 02 (As Published) · MCU21/0231.02

of 11

Text shows just the words. Original shows the document exactly as it was published.

                                                                                     Officer:            Georgina Schramm
                                                                                     Direct Telephone:   07 5329 6245
                                                                                     Our Reference:      MCU21/0231.02
                                                                                     Your Reference:     0283

               9 September 2025


               Mark Bain Constructions Pty Ltd
               C/- Pivotal Perspective Pty Ltd
               3/93 Hilton Tce
               TEWANTIN QLD 4565
               [email protected]



               Dear Sir/Madam,
                                            Decision Notice – Minor Change
                                                         Planning Act 2016

               I refer to your application received on 28 August 2025, requesting a minor change to an existing
               development approval. Council decided your requested changes.
               Details of the decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:              MCU21/0231.02

                   Street address:              10 Natasha Ave Noosa Heads Qld 4567
                                                24 Katharina St Noosa Heads Qld 4567

                   Real property description:   Lot 2 RP 122891 & Lot 135 RP 92518

                   Planning Scheme:             Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               The following type of approval was issued on 30 August 2022.
               •       Development Permit for Material Change of Use – Multiple Dwelling.
               In relation to the request to make a minor change to the existing approval, Council on 9 September
               2025, decided to approve the requested changes. The changes are detailed below.
                     A.    Approve the change.
                     B.    Amend conditions 2 & 20.
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.




               ABN 97.969.214.121                                                              PO Box 141
               noosa.qld.gov.au                                                         Tewantin QLD 4565
               [email protected]                                                         07 5329 6500
                                                                                                         Page 1 of 11
Document Set ID: 24107281
Version: 5, Version Date: 09/09/2025
Full text of the other 10 pages

Page 2

               4.     ASSESSMENT MANAGER CONDITIONS

               PLANNING
                      When Conditions must be Complied With
               1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                      the use commencing, and then compliance maintained at all times while the use continues.
                      Approved Plans
               2.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                        Plan No.           Rev.    Plan/Document Name                          Date

                        S1.0                 -     Site Plan prepared by Chris Clout Design 2 February 2023

                        S1.3                 -     Landscaping prepared by Chris Clout 2 February 2023
                                                   Design

                        C1.0                 -     K1, 2 & 3 Basement Plan prepared by 2 February 2023
                                                   Chris Clout Design

                        W9.1                 B     K1, 2 & 3 GF Plan prepared by Chris 2 February 2023
                                                   Clout Design
                                                                                       (resubmitted with
                                                                                       amendments on
                                                                                       28 August 2025)

                        C1.2                 -     K1, 2 & 3 UF Plan prepared by Chris 2 February 2023
                                                   Clout Design

                        C1.4                 -     K1, 2 & 3 Elevations prepared by Chris 19 August 2022
                                                   Clout Design

                        C1.5                 -     K1,2 & 3 Elevations prepared by Chris 19 August 2022
                                                   Clout Design
                                                                                         (resubmitted with
                                                   Annotated by Council                  amendments on
                                                                                         28 August 2025)

                        C1.6                 -     K1, 2 & 3 Sections prepared by Chris 2 February 2023
                                                   Clout Design

                        C2.0                 -     K4, 5 & 6 GF Plan prepared by Chris 19 August 2022
                                                   Clout Design

                        C2.1                 -     K4, 5 & 6 UF Plan prepared by Chris 19 August 2022
                                                   Clout Design

                        C2.2                 -     K4 Elevations prepared by Chris Clout 19 August 2022
                                                   Design

                        C2.3                 -     K5 & 6 Elevations prepared by Chris 19 August 2022
                                                   Clout Design

                        C2.4                 -     K4, 5 & 6 Sections prepared by Chris 19 August 2022
                                                   Clout Design



                                                                                                      Page 2 of 11
Document Set ID: 24107281
Version: 5, Version Date: 09/09/2025

Page 3

                        C3.0                  -    N1 & N2 LF Plan prepared by Chris Clout 19 August 2022
                                                   Design

                        C3.1                  -    N1 & N2 GF Plan prepared by Chris Clout 19 August 2022
                                                   Design

                        C3.2                  -    N1 & N2 UF Plan prepared by Chris Clout 19 August 2022
                                                   Design

                        C3.3                  -    N1 & N2 Elevations prepared by Chris 19 August 2022
                                                   Clout Design

                        C3.4                  -    N1 & N2 Elevations prepared by Chris 19 August 2022
                                                   Clout Design

                        C3.5                  -    N1 & N2 Sections prepared by Chris 19 August 2022
                                                   Clout Design

                      Nature and Extent of Approved Use
               3.     The approved Multiple Dwellings is comprised of eight (8) dwellings, six (6) of which are small
                      dwellings, in accordance with the administrative definition under the Noosa Plan 2020.
                      Currency Period
               4.     This development approval lapses if the use has not happened by 30 August 2028, unless
                      an application to extend the currency period is approved by Council.
                      Reconfiguration of a Lot
               5.     The existing allotments are to be amalgamated into one allotment and a new Certificate of
                      Title issued to cover the newly created allotment prior to the commencement of the use.
                      Building Height
               6.     The maximum height of the development must not exceed 8 metres above the finished
                      ground level and the natural ground level except where shown on the approved plans.
               7.     Certification must be submitted to Council from a Licensed Surveyor which certifies that the
                      buildings do not exceed the maximum height requirement of this Decision Notice.
                      Performance Bond
               8.     Security in the form of a cash bond or trading bank guarantee to the sum of $25,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to the
                      issue of a Development Permit for Operational Works. The cash bond or trading bank
                      guarantee will be returned on performance of the conditions of approval less any costs
                      incurred by Council in respect of enforcing performance of this permit. Council reserves the
                      right to call upon the bond or guaranteed sum to effect compliance with conditions.
                      Water & Sewer Connections
               9.     An underground connection to reticulated water and sewerage must be provided to the
                      development site in accordance with the standards and requirements of Northern SEQ
                      Distributor–Retailer Authority (Unitywater).
               10.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
                      must be submitted to Council that certifies an underground connection to reticulated water
                      and sewerage has been provided to each the development site.
                      Building Appearance
               11.    All air conditioning units or other mechanical equipment must be located at ground level, or
                      otherwise fully enclosed or screened such that they are not visible from the street frontages
                      nor adjoining properties.


                                                                                                       Page 3 of 11
Document Set ID: 24107281
Version: 5, Version Date: 09/09/2025

Page 4

               12.    All deck and balcony areas above ground floor must not be fully enclosed by permanent
                      fixtures such as shutters, louvres, glass panelling or the like, and must remain generally open
                      on at least 1 side.
                      Fencing and Walls
               13.    Any street fencing must be set back an average of 1 metre from the front property boundary.
                      Any fencing on the front boundary must not exceed 2m in height.
               14.    The area of land between the fence and the front property boundary must be densely
                      landscaped to screen any fencing from the street.
                      Clothes Drying Areas
               15.    Each dwelling unit must be provided with access to an outdoor clothes line which is screened
                      from public view.
                      Retention of Existing Trees
               16.    An arborist’s report is to be submitted for approval as part of the Operational Works
                      application. The purpose of the arborist’s report is to identify the native vegetation to be
                      retained or removed across the two allotments, and within the road reserve, with existing
                      native vegetation retained where located outside the approved building footprints.
               17.    All existing trees in the road reserve must be retained unless otherwise approved to be
                      removed through an Operational Works application.
               18.    Any trees to be retained must be protected from clearing or construction activities by:
                      a.      clearly marking vegetation to be retained;
                      b.      installing protective fencing around the drip line of the vegetation;
                      c.      restricting stockpiling, storage and vehicle parking to those areas which are already
                              cleared;
                      d.      using low impact construction techniques around vegetation.
                      Landscaping Works
               19.    An amended landscaping plan is to be provided prior to commencing Operational Works,
                      and is to include:
                      a.      landscaping species details as annotated on the ‘Landscaping Concept Plan’ on the
                              approved Landscaping Plan of this Decision Notice; and
                      b.      adopt the findings and recommendations of the Arborist Report, to retain trees species
                              where within areas of soft landscaping.
               20.    The works must be undertaken in accordance with an Operational Works approval and
                      associated revised Landscaping Plan, the Noosa Plan and Planning Scheme Policy PSP2 -
                      Landscaping for that specific area and must include in particular:
                      a.      the works shown on the approved Landscaping Plan;
                      b.      a 1 metre wide landscaping strip within the Lot, along the Natasha Avenue and
                              Katharina Street road frontage of the subject site, exclusive of the access driveway,
                              generally uncompromised by infrastructure items;
                      c.      provision of 2 x 100 litre pot size street trees within the road reserve of both Natasha
                              Avenue and Katharina Street frontages.
                      d.      screening landscaping for the full length of all boundaries including screening plants
                              which grow to a minimum height of 5m at maturity and provided at maximum 1.5m
                              centres. The screening plants must have a minimum pot size of 200mm (except where
                              shown along the driveway from Natasha Avenue, and adjacent to Unit K1 on the
                              southern boundary).




                                                                                                        Page 4 of 11
Document Set ID: 24107281
Version: 5, Version Date: 09/09/2025

Page 5

               21.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               22.    All landscape works must be maintained generally in accordance with the approved design
                      for the life of the development.
                      Treatment of Temporarily Vacant Land
               23.    Where some or all of the land remains vacant or undeveloped for more than 3 months, or
                      buildings are demolished and redevelopment is delayed for more than 3 months, the
                      following works must be carried out:
                      a.      the site must be cleared of all rubble, debris and demolition materials
                      b.      erosion and sediment control devices installed
                      c.      the site must be graded to prevent ponding (to the same level as the adjoining footpath
                              wherever practicable)
                      d.      the site must be maintained to ensure no nuisance to adjacent premises, roads or
                              footpaths
                      Community Management Statement
               24.    Any proposed Community Management Statement required for the development pursuant to
                      the Body Corporate and Community Management Act 1997 must be submitted to Council for
                      endorsement at the same time as submission of the Building Format Plan (or similar) to
                      Council for compliance assessment.
                      External Works
               25.    Natasha Avenue and Katharina Street must be upgraded for the length of its frontages to the
                      subject site. The works must be undertaken generally in accordance with TOD Consulting’s
                      plan 21617-SK200, Rev B “Preliminary Design – General Arrangement” and in accordance
                      with an Operational Works approval and must include in particular:
                      a.      construction of kerb and channelling and underground stormwater drainage to the
                              development side only;
                      b.      construction of a pedestrian footpath in accordance with the conditions of this Decision
                              Notice;
                      c.      removal of the existing properties’ accesses and reinstatement of the kerb, footpath
                              and verge area to match the balance of the site frontage, including the provision of
                              topsoil and turf where the existing verge is grassed.
                      Site Access and Driveways
               26.    Two sealed access driveways must be provided from Natasha Avenue and Katharina Street
                      to all parking and manoeuvring areas of the development. The works must be undertaken
                      generally in accordance with TOD Consulting’s plan 21617-SK200, Rev B “Preliminary
                      Design – General Arrangement” and in accordance with an Operational Works approval and
                      must include in particular:
                      a.      driveway crossover in accordance with council standard drawings RS-049, RS-050 and
                              respective addendums.




                                                                                                        Page 5 of 11
Document Set ID: 24107281
Version: 5, Version Date: 09/09/2025

Page 6

                      Car Parking
               27.    A minimum of 17 car parking spaces must be provided and marked on the site. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular:
                      a.      one (1) visitor parking spaces within the total, which are clearly marked for that purpose
                              and accessible at all times for visitor use;
                      b.      dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                              Parking Facilities.
                      Pedestrian and Bicycle Facilities
               28.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken generally in accordance with TOD Consulting’s plan 21617-SK200, Rev B
                      “Preliminary Design – General Arrangement” and in accordance with an Operational Works
                      approval and must include in particular:
                      a.      a 1.5 metre wide concrete footpath within the road verge for the entire length of the
                              site’s frontage to Natasha Avenue, alignment to be determined at operational works
                              stage, with consideration given to the existing native trees in the road reserve;
                      b.             a 1.5 metre wide concrete footpath within the road verge for the entire length of
                              the site’s frontage to Katharina Street.
                      Stormwater Drainage
               29.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken generally in accordance with TOD Consulting’s
                      plan 21617-SK200, Rev B “Preliminary Design – General Arrangement” and in accordance
                      with an Operational Works approval.
                      Services
               30.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               31.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               32.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               33.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               34.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Earthworks and Retaining Walls
               35.    All excavation, fill and associated batters must be undertaken generally in accordance with
                      TOD Consulting’s plan 21617-SK100, Rev B “Preliminary Design – Earthworks” and in
                      accordance with an Operational Works approval, and contained entirely within the subject
                      site unless written permission from the respective landowner(s) is provided to Council.




                                                                                                         Page 6 of 11
Document Set ID: 24107281
Version: 5, Version Date: 09/09/2025

Page 7

               36.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               37.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               5.     REFERRAL AGENCIES

               Not applicable.
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Aboriginal Cultural Heritage Act 2003
               1.     There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the
                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.
                      You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
                      Equitable Access and Facilities
               2.     The plans for the proposed building work have NOT been assessed for compliance with the
                      requirements of the National Construction Code - Building Code of Australia (Volume 1) as
                      they relate to people with disabilities. Your attention is also directed to the fact that in addition
                      to the requirements of the National Construction Code as they relate to people with
                      disabilities, one or more of the following may impact on the proposed building work:
                      a.      the Disability Discrimination Act 1992 (Commonwealth);
                      b.      the Anti-Discrimination Act 1991 (Queensland); and
                      c.      the Disability (Access to Premises – Buildings) Standards.
                      Sustainability
               3.     In line with Noosa Council’s Corporate Plan, Council seeks to encourage sustainable building
                      design for residential and commercial development. Council encourages the use of
                      sustainable building materials, energy efficient fittings, solar hot water, photovoltaic systems
                      (including the use of inverter/charges), water saving devices and rainwater harvesting. For
                      further information go to http://www.noosa.qld.gov.au/sustainable-homes




                                                                                                            Page 7 of 11
Document Set ID: 24107281
Version: 5, Version Date: 09/09/2025

Page 8

                      Performance Bond
               4.     Where the works include Council assets (construction of new or modifications to existing) a
                      portion of the performance bond will be retained as a “maintenance bond” as described in
                      Council’s Planning Scheme Policy 6 Engineering Design Standards. Alternatively the
                      developer may submit a separate “maintenance bond” at the completion of the works.
                      The bond amount will be:
                      a.      5% of the agreed value of the works or
                      b.      $1500, whichever is the greater amount
                      Qualified Person
               5.     For the purpose of preparing a Landscape Plan, a qualified person is considered to be a
                      landscape architect, landscape designer and/or horticulturist with a minimum of 3 years
                      current experience in the field of landscape design.
               6.     For the purpose of preparing an Arborist Report, a qualified person is considered to be a
                      person with either:
                      a.      ISA certification; or
                      b.      a Diploma of Arboriculture in addition to a minimum of 3 years current experience in
                              the field of arboriculture.
                      Co-ordination of Operational Works Assessment
               7.     Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               8.     A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      traffic management during all aspects of the construction phase including:
                              i.       a Traffic Management Control Plan in accordance with the Manual of Uniform
                                       Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                       control measures prior to construction;
                              ii.      maintenance of safe pedestrian access for the areas affected by the works during
                                       and after daily construction has ceased;
                              iii.     proposed fencing to the site during the construction phase of the development;
                              iv.      provision for worker car parking;
                      b.      maintenance and protection of water quality and existing drainage lines through the
                              construction site, through the implementation of appropriate erosion and sediment
                              control measures;
                      c.      works programme identifying key components of the works and their respective
                              durations;
                      d.      establishment of a communication protocol with the general public, adjoining owners,
                              emergency services and local businesses to advise of agreed construction times,
                              impacts on traffic, services and other relevant issues;
                      e.      Include a post out to the local residents and businesses advising of the proposed
                              development, the expected time frames and the site contact details;
                      f.      Include signage in prominent locations on the boundaries of the site advising of the
                              proposed development, the expected time frames and the site contact details.
                      g.      identification of complaint management procedures including:



                                                                                                         Page 8 of 11
Document Set ID: 24107281
Version: 5, Version Date: 09/09/2025

Page 9

                              i.       contact details for the on-site manager
                              ii.      dispute resolution procedures
                      It is acknowledged that the preliminary Construction Management Plan will be a draft
                      document requiring finalisation upon appointment of the Principal Contractor employed to
                      construct the works and a final document will be required to be submitted at the Pre-Start
                      Meeting for the project.
                      Infrastructure Charges
               9.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
               7.     PROPERTY NOTES

               Not applicable.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required                    Subject of the required Development Permit

                Development Permit for Operational Works               Road work, Stormwater, Drainage work,
                                                                       Earthworks, Landscaping, Signage, Vegetation
                                                                       Clearing.

                Development Permit for Building Works                  All building work (including demolition)

               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               12.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully,




               Georgina Schramm
               Senior Development Planner




                                                                                                            Page 9 of 11
Document Set ID: 24107281
Version: 5, Version Date: 09/09/2025

Page 10

               Enc:   Appeal Rights
                      Approved Plans/Documents

               DECISION NOTICE HISTORY
               •   Original Decision Notice – 30 August 2022.
               •   Decision Notice – Minor – MCU21/0231.01 – 12 April 2023, with
                   an amendment to conditions 2 and 5.

               •   Decision Notice – Minor – 9 September 2025 – with an amendment
                   to conditions 2 and 20.




                                                                                    Page 10 of 11
Document Set ID: 24107281
Version: 5, Version Date: 09/09/2025

Page 11

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 11 of 11
Document Set ID: 24107281
Version: 5, Version Date: 09/09/2025

Used in these records

About this file

File size
177 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - MCU21 0231 02 (As Published).pdf · 177 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.