Council archive · source document
Minor Change Existing Approval - MCU21 0231 02 (As Published) · MCU21/0231.02
Car Parking
27. A minimum of 17 car parking spaces must be provided and marked on the site. The works
must be undertaken in accordance with an Operational Works approval and must include in
particular:
a. one (1) visitor parking spaces within the total, which are clearly marked for that purpose
and accessible at all times for visitor use;
b. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities.
Pedestrian and Bicycle Facilities
28. Pedestrian and bicycle facilities must be provided for the development. The works must be
undertaken generally in accordance with TOD Consulting’s plan 21617-SK200, Rev B
“Preliminary Design – General Arrangement” and in accordance with an Operational Works
approval and must include in particular:
a. a 1.5 metre wide concrete footpath within the road verge for the entire length of the
site’s frontage to Natasha Avenue, alignment to be determined at operational works
stage, with consideration given to the existing native trees in the road reserve;
b. a 1.5 metre wide concrete footpath within the road verge for the entire length of
the site’s frontage to Katharina Street.
Stormwater Drainage
29. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with TOD Consulting’s
plan 21617-SK200, Rev B “Preliminary Design – General Arrangement” and in accordance
with an Operational Works approval.
Services
30. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
31. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
32. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
33. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
34. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
35. All excavation, fill and associated batters must be undertaken generally in accordance with
TOD Consulting’s plan 21617-SK100, Rev B “Preliminary Design – Earthworks” and in
accordance with an Operational Works approval, and contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to Council.
Page 6 of 11
Document Set ID: 24107281
Version: 5, Version Date: 09/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - MCU21 0231 02 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 177 KB (small file)
- File type
No other editions are linked here.