Minor Change Existing Approval - MCU21 0231 02 (As Published) · MCU21/0231.02
Performance Bond
4. Where the works include Council assets (construction of new or modifications to existing) a
portion of the performance bond will be retained as a “maintenance bond” as described in
Council’s Planning Scheme Policy 6 Engineering Design Standards. Alternatively the
developer may submit a separate “maintenance bond” at the completion of the works.
The bond amount will be:
a. 5% of the agreed value of the works or
b. $1500, whichever is the greater amount
Qualified Person
5. For the purpose of preparing a Landscape Plan, a qualified person is considered to be a
landscape architect, landscape designer and/or horticulturist with a minimum of 3 years
current experience in the field of landscape design.
6. For the purpose of preparing an Arborist Report, a qualified person is considered to be a
person with either:
a. ISA certification; or
b. a Diploma of Arboriculture in addition to a minimum of 3 years current experience in
the field of arboriculture.
Co-ordination of Operational Works Assessment
7. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will result
if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
8. A preliminary Construction Management Plan must be submitted with the Operational Works
application and must address the following:
a. traffic management during all aspects of the construction phase including:
i. a Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction;
ii. maintenance of safe pedestrian access for the areas affected by the works during
and after daily construction has ceased;
iii. proposed fencing to the site during the construction phase of the development;
iv. provision for worker car parking;
b. maintenance and protection of water quality and existing drainage lines through the
construction site, through the implementation of appropriate erosion and sediment
control measures;
c. works programme identifying key components of the works and their respective
durations;
d. establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic, services and other relevant issues;
e. Include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details;
f. Include signage in prominent locations on the boundaries of the site advising of the
proposed development, the expected time frames and the site contact details.
g. identification of complaint management procedures including:
Page 8 of 11
Document Set ID: 24107281
Version: 5, Version Date: 09/09/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - MCU21 0231 02 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 177 KB (small file)
- File type
No other editions are linked here.