S25-107-Stormwater Report
Best Practice Erosion And Sediment Control Erosion Hazard Assessment Form
[11] REQUIREMENTS:
Permission must be obtained from the owner of a road reserve before placing
any erosion and sediment control measures within the road reserve.
WARNINGS:
Few sediment control techniques work efficiently when placed on a road and/or
around roadside stormwater inlets. Great care must be taken if sediment control
measures are located on a public roadway, specifically:
• safety issues relating to road users;
• the risk of causing flooding on the road or within private property.
The construction of roads (whether temporary or permanent) will usually modify
the flow path of stormwater runoff. This can affect how “dirty” site runoff is
directed to the sediment control measures.
COMMENTS:
“On-road” sediment control devices are at best viewed as secondary or
supplementary sediment control measures. Only in special cases and/or on very
small projects (e.g. kerb and channel replacement) might these controls be
considered as the “primary” sediment control measure.
[12] WARNINGS:
Soils with a pH less than 5.5 or greater than 8 will usually require treatment in
order to achieve satisfactory revegetation. Soils with a pH of less than 5
(whether naturally acidic or in acid sulfate soil areas) may also limit the choice of
chemical flocculants (e.g. Alum) for use in the flocculation of Sediment Basins.
[13] REQUIREMENTS:
A preliminary ESCP must be submitted to the local government for approval
during the planning phase for any development that obtains a total point score of
17 or greater or when any trigger value is scored or exceeded.
IECA (Australasia) November 2008 Page 7
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (S25-107-Stormwater Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.