Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

S25-107-Stormwater Report

of 64

Page text read automatically using OCR, there may be inaccuracies

                                       Table 2 – Maintenance of ESC measures

                                                                                 Timeframe for Completion of
              ESC Measure                       Maintenance Trigger
                                                                                          Maintenance

                                        When settled sediment exceeds the
            Sediment basins                                                      Within 7 days of the inspection.
                                       volume of the sediment storage zone

                                         The capacity of ESC measures falls
           Other ESC measures                                                         By the end of the day.
                                                    below 75%.


Sediment accumulation on ESC devices is to be removed and disposed of to the satisfaction of Noosa Council.

5          CONCLUSION

This SWMP outlines how stormwater runoff from the site will be managed in order to not adversely impact the
receiving environment.
The proposed lawful point of discharge for the proposed development is to an existing stormwater grate located on
the northeastern corner of the allotment. Stormwater detention is not considered to be required as the proposal is
for a residential duplex on an existing lot. Stormwater runoff from the development site will need to be collected on
site and directed to the stormwater grate at the built phase to ensure no adverse impacts to neighbouring properties
as a result of the development.
The site is not impacted by flooding or tidal inundation.
Stormwater treatment should be managed through the implementation of best management practices on site. Based
on the scale of the proposed development, and typical pollutants produced, these measures are considered adequate.
By implementing the proposed stormwater management system, and providing adequate maintenance, the
downstream environment and neighbouring properties will not experience any adverse deterioration of water quality
as a result of the proposed development.




 S25-107                                      Stormwater Management Report                                Page 5 of 6
                                                Uncontrolled When Printed

Log in to download the original (S25-107-Stormwater Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.