FINAL Response to Information Request_ 03.05.2016
Attached to the e-mail MCU15/0109 - Response to Information Request - Email 1 of 6.msg.
This correspondence and attachments represent a response to all the information requested, in accordance with
s278 of the Sustainable Planning Act 2009.
We trust the above and enclosed information satisfactorily addresses Council’s Information Request
requirements.
Yours faithfully,
GRAEME BEWS
Associate Director – Planning & Urban Design
JFP URBAN CONSULTANTS PTY LTD
Encl:
1. Amended architectural drawings and landscape concept plans prepared by Blackburne Jackson architects
2. Letter dated 21 April 2016 and amended engineering drawings prepared by Morgan Consulting Engineers
3. Vegetation Management Plans M12652L VM01 G– VM05 G prepared by JFP Urban Consultants
4. Amended Bushfire Management Plan Rev.2 dated April 2016 prepared by Duke Environmental
5. Bushfire Management & Evacuation Plan Rev 1.0 dated 3 May 2016 prepared by Altum Constructions
CC: Altum Constructions
JFP Ref: M2652 Page 13