Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

FINAL Response to Information Request_ 03.05.2016

Attached to the e-mail MCU15/0109 - Response to Information Request - Email 1 of 6.msg.

of 13

Page text shows just the words. Original shows the document exactly as it was published.

         With regard to Specific Outcome 09, the use of the internal roadway in wildfire events, given the site’s
          proximity to the adjacent hazardous vegetation within the Noosa National park and the Giraween
          Nature Reserve, the internal roadway may not meet this Specific outcome.

The application provides minimal compliance with Specific Outcome 09 and, given the proximity of the
site to large areas of hazardous vegetation, the width of the proposed internal roads is considered to be
insufficient.

Information Required

     13. Provide an amended bushfire assessment (and amended proposal plans as appropriate)
         addressing the following:
     a) Assessment of the bushfire hazards within and around the subject site in accordance with the
         methodology contained in the State Planning Policy of December 2013, natural hazard, Bushfire
         and compared the result with the Noosa Plan.

Response


Refer attached correspondence from Duke Environmental.



Information Required

     b) Based on the highest determined hazard within and around the subject site, the proposed development
        be repositioned to comply with the higher level of bushfire hazard.

Response


The proposal has been amended to increase the separation distance of the nearest dwellings (Building F) from the
southern boundary which represents the greatest bushfire risk. The separation distance has been increased to
20m from the boundary instead of 15m. This results in a setback to the nearest canopy of 17.861m (southern
boundary) and 15.133m (eastern boundary, although a greater setback may apply for the eastern boundary if
trees along the 3m wide path corridor cannot be retained through detailed engineering design).


Information Required

     c) A plan be provided locating all trees within and around the subject site along with their canopy
        cover and distance from the edge of these trees and proposed buildings be used to determine the
        setback distance.

Response


Refer attached Vegetation Management Plan M2652L VM01 – VM05 for details of existing trees and canopies
with building setbacks measured from the edge of canopies. We confirm that the canopies have been determined
by survey.


Note that the minimum setbacks to the edge of canopies are as follows:




JFP Ref: M2652                                                                                                Page 9
Log in to download the original file

FINAL Response to Information Request_ 03.05.2016.pdf · 741 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.