LOT 26 EARTHWORKS QUANTITIES
SP151406 cur. e228

FILL - 25,861m

PROPOSED EARTHWORKS
CONTOURS
(0.2m INTERVALS)

PROPOSED SED
IMPORTED FILL OF 11,119m [CUT BASIN CONTOURS
VOLUME) WILL BE OBTAINED FROM (0.2m INTERVALS)
GATEWAY RISE SITE

Ss

Ee
5 SRS
SSSR RRS
SSeS es

<5

eS
<x
<j

 

SILT FENCE

SEE 3 STRAND POST & WIRE FENCE

SS Om WITH SAFETY MESH

SaaS
—_——— co —— o—— ©
{ NOTE:- ROCK EROSION PROTECTION
1 FOR DETAILS OF EXISTING GROUND CONDITIONS
REFER TO.
A) REPORT PREPAREO BY COFFEY CONSTRUCTION EXIT/ENTRY
GEOSCIENCES No. B17974/01-8 OATED
06.07.2004
le B) REPORT PREPARED BY DOUGLAS TRAFFIC CLEANING FACILITY

PARTNERS No. 33986 DATED 16 08.2006
2) FOR DETAILS OF METHODOLOGY FOR
PROPOSEO IN SITU GROUND IMPROVEMENT OF
THE UNCONSOLIDATED FILL ON THE SITE, REFER CATCH DRAIN
DIMENT BASIN 1 TO REPORT BY LANDPAC TECHNOLOGIES No
> . P748-03.11A) DATEO AUGUST 2007.

 

 

 

 

ROCK CHECK DAMS

 

RIN Sen we -
NOGA SPrUHE Cg iy” TEMPORARY SEOIMENT BASIN

cateange aca fom —¥ eV LOPMa IT PERMIT OPERATIONAL OP? BW25- fut

ExiZ/.0..) 2007 —

“ Z.

foros EL... | 2008 NOTE

r CA APPROVAL LOCATION & LEVELS OF ALL EXISTING SERVICES
TO BE CONFIRMED ON SITE BY CONTRACTOR

tteteseeeeees . PRIOR TO THE COMMENCEMENT OF CONSTRUCTION,

IT IS THE CONTRACTOR'S RESPONSIBILITY TO
CIRCUM S$ PERFORM A DIAL BEFORE YOU DIG SEARCH PRIOR
TO COMMENCEMENT OF WORKS

 

 

PNS BE DEPARTED F AN -
SEQUENT BASIN LiTYPE F/D' } 1 TH. a
TOTAL CATCHNENT IA) = 2.76h0 i A ROVAL Of th MANAGER LAND DEvELponae

ASSUME > 33% OF SOW < 0020

TRUCTION PHASE SEQUENCE

= 100 x S105 «276 } : 1, CONSTRUCT SEDIMENT BASIN, SEDIMENT FENCES AND DIVERSION BUNDS.
» 13a!

SETTLING DEPTH « 1.0m
BASIN DIMENSIONS AT BASE (1:2 RATIO)
a

Cv 2 OS
SETTLING VOLUME IVs} x 100 x Wax Cv A

 

7 LOMMENCE CLEARING AND CONSTRUCT CATCH DRAINS.

“E."COMMENCE FLING AND EARTHWORKS INCLUDING COMPACTION
t 30.0
0 40m - 4. CONSTRUCTION OF STORMWATER LINES AND GULLIES INCLUDING BACKFILLING AND
COMPACTION

®
Wn 19.00

 

Vs 2 722A"
STORAGE VOLUME © 0.5 » Vs
= 3610"

ANT vues CRE ot EC

TURF STRIPS 900mm WIDE SHALL BE LAID TO BASE OF ALL DOWNSTREAM

DEPTH = 0Sm EARTHWORKS BATTERS - AND THE REMAINDER OF THE BATTERS SHALL BE TOPSOILED
AND GRASS SEEQEO IMMEDIATELY UPON COMPLETION OF EARTHWORKS. AND AT THE
SATISFACTION OF SUPERINTENOENT. EIGHTY PERCENT (80%) GRASS COVERAGE SHOULD
BE ACHIEVED PRIOR TO REMOVAL. SEOIMENT FENCES TO BE REMOVED AFTER
CONSTRUCTION OF ROADS.

+ 10%

= 50m

= 0.028

= %6 winutes
+ 60mm/h
207
eCxtea
© 5 Lae

 

Mer rhamse Heseartie\? Beavis

a

S
ou

 

 

SEDIMENTATION NOTES

1. ALL SEDIMENT CONTROL DEVICES (SILT FENCES, SPILLWAYS, ROCK CHECK DAMS} TO BE
CHECKED AFTER ALL MAJOR RAINFALL EVENTS AND RECTIFIED AS NECESSARY

WEIR FORHULA: @ = 08 x 166 x LA
«1228 LN

2 OSM5/11.328 x 0,166)

. IF SEDIMENT WATER IS SHOWN TO HAVE SUSPENDED SOLIOS > SOmg/L!. THEN THE USE OF
5 Ohm

A’ FLOCCULANT IS TO BE APPLIED AS DIRECTED BY SUPERINTENDENT PRIOR TO THE BASIN
BEING LOWERED.
GE ata w 276ne THE BASIN tS TO BE ORAINED BY OPENING THE VALVE OR UNPLUGGING THE END OF THE
1, + tt einutes OUTLET PIPE. ONCE DRAINED THE OUTLET PIPE WILL BE PLUGGED AGAIN.
1): Waasn ’ THE FIELD TEST 4S :- FILL A CLEAR &Smm SOFT ORINK BOTTLE WITH BASIN WATER
a Sana ° 1F YOU CAN NOT SEE CLEARLY THROUGH THE SAMPLE, THEN A
eo ; FLOCCULANT NEEDS TO BE APPLIED.
WER FLOW OEPIN than : / : THE PH OF THE WATER MUST BE IN THE RANGE 6.5 to 8.5 PRIOR TO DISCHARGE. (F THE
Te = 1850/0 ‘ RESULTS ARE OUTSIDE THESE LIMITS THE SUPERINTENCENT 15 TO BE NOTIFIED AND HE
G+ 078 WILL ADVISE ON TREATMENT.
Qe + 10¢mm/n .
MER FLOW DEPTH + 323mm “ QUTLET BAFFLE - POSTS 100mm - AT tm CRS SET GoOmm DEEP WITH SEDIMENT FENCE
: aS, FABRIC

0 —— 0 —m 77

 

 

. IWLET BAFFLE - POSTS 100mm - AT tm CRS SET 800mm DEEP WITH SEDIMENT FENCE FABRIC
WITH SOmm HOLES CUT AT 300mm CRS

Fae Rane BARrishane -Corndtag tbe colt ent

. SEDIMENT BASINS TO BE INSPECTED AT LEAST ONCE EVERY WEEK AND DE-SILTED AFTER
EACH MAJOR STORM EVENT OR AS DIRECTED BY SUPERINTENDENT

2

 

THE FINAL LOCATION OF SILTATION AND EROSION CONTROL DEVICES MAY BE ADJUSTED aS

SCALE 1:500 (Al) NECESSARY ON SITE BY THE SUPERINTENDENT.

BMD Stuctoe! Chakeers PADS BUNNINGS GROUP LIMITED
OCSA COURLIL INFORMA TION RECLEST & Project ii -

GEDTEG@SCAL COMMENTS ADDED sm roe mae BUNNINGS WAREHOUSE NOOSAVILLE
ISSUED FOR APPROVAL CONSULTING | | pane

TSSUED FOR COMMENT mun une Head Oa - Brisbane SEDIMENT BASIN 1 AND Drawing No.
Tobacco Som oe EROSION CONTROL PLAN *“cwoeaa esol ¢ |

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Pal Cate 19-Det-4P 4.53PM Weer: TPLNYDE

Used in these records

About this file

File size
1.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2125 - Approved Plans [As Published].pdf · 1.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.