AS PUBLISHED Minor Change Existing Approval 51983 3225 19 (1) · 51983.3225.19
• 7am to 10pm: Maximum level allowable = background + 5dB(A)
• 10pm to 7am: Maximum level allowable = background + 3dB(A)
b. Pumps/spa equipment
• 7am to 7pm: Maximum level allowable = background + 5dB(A)
• 7pm to 10pm: Maximum level allowable = background + 3dB(A)
• 10pm to 7am: No audible noise.
15 The certification must be submitted to Council at the completion of the building works, which
certifies that operational noise from any fixed plant and equipment complies with the
requirements of this Decision Notice.
Landscaping Works
16 The Cocos palm on Lot 17 must be removed prior to construction works commencing on site.
17 The Hills Fig tree on Lot 17 may be removed as part of preparing the site for construction.
18. The development site must be landscaped generally in accordance with Planning Scheme
Policy PSP03 – Landscaping Plants and guidelines and the following requirements:
a. Lot 17 - 2 x 45L Small Leaf Lilly Pilly’s (Syzygium luehmannii) planted in the general
location of the vegetation approved for removal.
b. Lot 17-3 x 45L trees listed in the PSP03 suitable for the Noosa Heads locality must be
planted between the building and the northern boundary and north western corner of
Lot 17 that grow to a maximum height of 7 metres.
c. Lot 19 - the works as generally shown on the approved Landscape concept plan as
prepared by Louise Custance except for the usage of exotic species and include 2
advanced local native tree species in a pot size of no less than 45L that grow to a
maximum height of 7 metres.
d. Lot 19 – Landscaping must be provided between the building and western boundary
that grow (on average) to a maximum height of 5 metres in order to soften the built
form where viewed from the west.
19. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
20. Landscape works must be completed prior to the commencement of the approval use.
21. Vegetation to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are
already cleared
d. using low impact construction techniques around vegetation.
Damage to Services and Assets
22. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
Page 10 of 18
Document Set ID: 23327583
Version: 5, Version Date: 01/11/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
AS PUBLISHED Minor Change Existing Approval 51983 3225 19 (1).pdfRelated documentApplication case desk ↗
About this file
- File size
- 209 KB (small file)
- File type
No other editions are linked here.