BM: NAIL IN KERB
RL: 1.600
43
1. 47
57
1. .40
1. .35
57
5
58 4
61
1.
51 1.5
1. 1.4
48
54
1.
1.
1.
1
1
PP PP
56
1. 1.50
54 59
55 5
54 .54
1. 1.
1. 1.5
51 1.
1.
PP
1. 1
410. 0
54
56
50
1.
1. 1.4
60
1.
1.
66
55
75
2 1.
67
58 69
1.
7
1.
1.
1.
WM
1. 1.
HY WM 69
58
66
1. .76
1.
62
53
1.
1.
54
03
1
1.
1.
19.36
2.
20.49
58
58
59
1.
1.
64
1.
57
1.
Easement for access & services
1.
36
COMMON PROPERTY
2.
GTP395
37
42
2.
2.
92
97
1.
1.
75
94
1.
Boundary.
79
1.
75
1.
66
1.
78
1
17.10
22.93
64
1.
1.
1.
RP78252
2 STOREY
2 STOREY
BRICK UNITS 2
RENDERED HOUSE GTP395
Easement for access & services
72
Original
1.
74
1.
97
3
1.
69
GTP395
3
35.46
1.
97
50
59
50
1. .77
6.09
1.
87
2.
81
1.
67
Original Boundary.
2.
1
1.
1.
85
86
66
54 1. 2
1. 7
1.
1.
66
1.
77
686m²
1.
1.
01
35.46 1.94
2
94
2.
9
1.
6
73
SHED 1.
1.
8
1 .7
89
35.46
1. 2 STOREY
686m² 6
BRICK & TIMBER
UNITS
2
.0
68
2
GTP156216
1.
00
4 SINGLE STOREY
2.
TIMBER & FIBRO 5
12.99
68
RP78252 HOUSE 87
1.
78 1. GTP156216
90
1.
18.36
1.
DECK
54
1.
LINETYPE LEGEND
83
02
89
70
DECK
1. 1.
2.
90
1.
55
1.
1.
IO 54
54
IO 1.
CP
75
54
49
1.
1.
1.
53
47
1.
MH
1.
1.
49
LL: 1.53 GTP156216
49
1.
6
IL: 0.52 56 54
47
.5
1.
57
99
1. .65
1. 1. 17.90
17.86
64 71
50
1.
50
58
1.
1.
65
D
1. 1.4
1
1.
1.
1.
S
60
0
62
6
88
1.
1.
E
1.
1.
52 80
1. 1.
4 6
DECK
2 STOREY
BLOCK & H'PLANK GTP671
SINGLE STOREY RP72986
BLOCK UNITS
49
46
BLOCK UNITS
1.
1.
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
LOTS 2 & 3 ON RP 78252
Level Datum AHD
N Level Origin PM 56277, RL 1.635m
www.dialbeforeyoudig.com.au
SA) DIAL1100
“Wed BEFORE YOU DIG
BM: NAIL IN KERB
© S 6 A oy «KERB & RL: 1.600 A
a ws?) X 2?
N PP 2 a “
E E Og E E
E 8 2 ra
w— Pony cee a Wwesss== w Ww ay 2 W
Moe © Y WM +
[ee oe R.A BOUNDARY an
-—- NF 4 *T04 -—- Bo RQ ee
} 19.36 ty
a= a:
ig | iy i| COMMON PROPERTY
ah |S SS \H 8 GTP395
‘ +
ico | a aw
y |i Hl 9°
iE ’ \ 3 — pt
fH ih ae M 5 6 + A
A + wp! ge 3 Ne !
1 NO |i} ea Ss
|= ae 5 3 / :
RP78252 Hee 5 “ ‘|| 3. | 2storky
2 STOREY i] \ 8 is / : | BRICK UNITS 2
RENDERED HOUSE! a uw poN / GTP395
! ol _ / ‘ /
# 3 \& z/ NN /
I aS 2) \ /
f oe) gS 5 / \ / My
I g \2 / SY / ot
i ‘ A g \ ° 2 / / 3
. /8 oes / wv , GTP395
SK “a (PS 8 \B / x
O° Original Boundary, Z 2 / « s of + -
eri. 5 \ 4 \ a ” 2 ed
~ a . N
| “8 & \s 686m? | > $
& \ \ ~ 7 ~ “ ¥
+ yo eto
\ ‘. 8 cor OREY
\ 686m? ‘ fo” wt & TIMBER
aaa i ° y bie 6 UNITS
we el L Bis
4 SINGLE STOREY \, Be a | | GTP156216
\ 7 +
TIMBER & FIBRO ' \ & lL @
RP78252 HOUSE \ eee , ty Oa >
ae © —- / ee | ai] & ‘s z GT
ot at Men IF NIB ® 1s
< . / \ \ a ‘ 2
g © / \ 2 S
2 1 4 a |= 1
yO \ ~ ss Py a os
N. \ SS NPL ,
ui NS * ! ~T = ‘
> k a
¥ a SEX, SeP PN él ~! CP
? N LOK :
a Ray . We ~y GTP156216
Ni Pd ok o 2
_ 4 17.86 8 SS SPN el s
Sf ~ R.P. BOUNDARY ~~-~--<
Y a th
© a x 4 . 6
< 2 STOREY
oO /
wu ‘BLOCK & H'PLANK GTP671
SINGLE STOREY
BLOCK UNITS
EXISTING HCB’s & NEW SW DRAINAGE
LINE TO BE PROTECTED AS PER
SEWER/STORMWATER PROTECTION
DETAILS ON DRG 26281-OW1.
RP72986
SITE PLAN — SITE SURVEY & EXISTING SERVICES
Scale 1: 200
CONTRACTOR TO LOCATE ALL SERVICES PRIOR TO
COMMENCING WORKS ON SITE. ALL SERVICES ARE
TO BE PROTECTED IN ACCORDANCE WITH THE
AUTHORITY RESPONSIBLE FOR THE SERVICE
ALL LINE MARKING TO BE IN ACCORDANCE
WITH THE QUEENSLAND MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES & A.S 2890.1
PARKING FACILITIES PART 1: OFF-STREET CAR
PARKING
/
LEGEND
» EXISTING SURFACE SPOT LEVELS.
— INDICATES OVERHEAD ELECTRICITY
SUPPLY LINE
INDICATES EXISTING SEWER LINE
J ————_ INDICATES TELSTRA LINE APPROX
ALIGNMENT, BUILDER TO CONFIRM
EXACT LOCATION PRIOR TO WORKS
INDICATES EXISTING STORMWATER
SW/EX
CONSTRUCTION NOTES
GENERAL:
1. DO NOT SCALE FROM THIS DRAWING.
2. ALL DIMENSIONS IN MILLIMETRES
3. SETTING OUT DIMENSIONS ARE 10 BE OBTAINED FROM THE ARCHITECTURAL
DRAWINGS.
4. ANY DISCREPANCIES BETWEEN THESE DRAWING AND THE ARCHITECTURAL
DRAWINGS ARE TO BE REFERRED TO THE ENGINEER IMMEDIATELY.
5. THE BUILDER IS RESPONSIBLE FOR LOCATING ALL EXISTING SERVICES
WITHIN AND ADJACENT THE ALLOTMENT AND SHALL ENSURE THAT ALL NEW
WORKS ARE IN ACCORDANCE WITH THE ATTACHED CRITICAL DEPTH LINE
DIAGRAM.
FOOTPATHS AND DRIVEWAYS:
1. EXISTING FOOTPATHS TO BE SAW CUT PRIOR TO REMOVAL
2. CROSSINGS ARE NOT DESIGNED FOR COMMERCIAL VEHICLES
3. CONCRETE DRIVEWAY TO BE 125mm THK. EXCLUDING ANY FINISHED
TREATMENTS, EG. STAMPING
4. CONCRETE SURFACE TOLERANCE +5.0mm OVER 3.0m
5. CONCRETE N25 IN ACCORDANCE WITH AS 1379 AND AS 3600
6. REINFORCEMENT FABRIC TO AS 1304, PLACED CENTRAL SLAB DEPTH.
7. EXPANSION JOINTS TO BE 10mm WIDE WET TOOLED WITH EVERY 2ND MESH
WIRE CUT ALONG JOINT.
8. ONE ACCESS POINT PERMITTED FOR EACH ALLOTMENT.
9. FOR CURVED DRIVEWAYS, MAXIMUM GRADES APPLY TO INSIDE EDGE OF
CURVE
10. ALL SERVICES TO BE LOCATED AND PROTECTED AS REQUIRED PRIOR TO
WORK COMMENCING
FILLING NOTES:
—THE SITE IS TO BE SCRAPED CLEAR OF ALL ORGANIC MATERIAL AND
DEBRIS.
— THE SUBGRADE |S TO BE ROLLED WITH A VIBRATING STEEL DRUM
ROLLER TO ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 95% THE
COMPACTION IS TO BE SUFFICIENT TO ACHIEVE A BLOW COUNT OF 7
BLOWS PER 300mm WITH AN APPROVED PERTH SAND PENETROMETER
FOR A DEPTH OF 1.0m BELOW EXCAVATED LEVEL. COPIES OF
COMPACTION TEST RESULTS SHALL BE PRESENTED TO SCG CONSULTING
ENGINEERS FOR APPROVAL.
— THE FILL MATERIAL CLEAN GRANULAR MATERIAL (|.E. SAND TO A
CLAYEY SAND IN ACCORDANCE WITH AS1726) BE FREE OF ANY
ORGANIC MATERIAL AND HAVE A CLAY CONTENT OF LESS THAN 12%
(PLASTICITY INDEX LESS THAN 25%, LINEAR SHRINKAGE OF 15%). THE
PROPOSED MATERIAL IS TO BE INSPECTED BY SCG CONSULTING
ENGINEERS PRIOR TO ITS REMOVAL TO ENSURE ITS COMPATABILITY.
— THE FILL IS TO BE PLACED AND COMPACTED IN ACCORDANCE WITH
AS3798-1996 TO A LEVEL SUFFICIENT TO ACHIEVE A LEVEL 1
CERTIFICATION WITH A MINIMUM RELATIVE FIELD DENSITY OF 95%.
COPIES OF COMPACTION TEST RESULTS SHALL BE PRESENTED TO SCG
CONSULTING ENGINEERS FOR APPROVAL.
— FILLING AND COMPACTING ADJACENT EXISITING STRUCTURES IS TO BE
IN STRICT ACCORDANCE WITH THE ASSOCIATED DETAILS AND
SPECIFCATIONS.
— AREAS WHERE EXISTING STRUCTURES OR TREES ARE REMOVED SHALL
BE BACKFILLED WITH THE APPROVED FILL MATERIAL COMPACTED IN
ACCORDANCE WITH AS2870-1996 TO ACHIEVE A MINIMUM RELATIVE
FIELD DENSITY OF 95%.
— ANY LOOSE OR SOFT MATERIAL UNCOVERED IN THE SITE
PREPARATION SHALL BE REMOVED AND REPLACED WITH THE APPROVED
FILL MATERIAL COMPACTED IN ACCORDANCE WITH AS2870-1996 TO
ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 95%.
— SITE DRAINAGE AND SILT PROTECTION MEASURES MUST BE ISTALLED
PRIOR TO CONSTRUCTION COMMENCING.
FOR APPROVAL
B AMENDED FOR NEW ARCHITECTURALS | 09.04.17
A EXTRA SURVEY POINTS ADDED 06.03.17
Revision Description Date
Issue:
DO NOT SCALE FROM THIS DRAWING
The design and associated details contained on this and associated
drawings are copyright and are not to be used or reproduced without
DRAIN
KEY
EX. SWPT EXISTING STORMWATER MANHOLE /PIT
EX. SCP EXISTING SEWER CONNECTION POINT
RC. HW. = REINFORCED CONCRETE HEADWALL
EX. SMH — EXISTING SEWER MANHOLE
EX. SWMH EXISTING STORMWATER MANHOLE
SWMH NEW 1050 STORMWATER MANHOLE
E.0.B. EXISTING EDGE OF BITUMEN
K&C EXISTING KERB & CHANNEL
N.S.L. NATURAL SURFACE LEVEL
F.H. FIRE HYDRANT
TP TELSTRA PIT
EP. ELECTRICAL POWER POLE
KERB EXISTING KERBING
fann—1__?——)_'m1:100 © Al
1:200 @ A3
| S888, § |26281-0wl | B.
the written permission of SCG Consulting Engineers.
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
email:[email protected]
web:www.scg-engineers.com
‘ABN 40 098 484 699,
C) Ste
DEBUILD TA
Title:
OPERATIONAL WORKS:
SITE SURVEY & SERVICES
Project
Lots 2 & 3 RP/8252
Elizabeth St, NOOSAVILLE
Date: Drawn
Nov 16 CSK
Checked: Drg No. Rev
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 8 pages
Page 2
BM: NAIL IN KERB
RL: 1.600
55 57
1. 47
7
1. .35
0
44
43
54
61
5
1.
4
1.
48
8
1.
1.
1.
1.
1.
1
1.
5
1.
PP PP
51
1. .59
56
1.
55
54
50
1
4
1.
5
1.
1.
1.
55
40
WM
1.
1.
WM
66
54
1.
03
1.
58
20.92 20.92
58
2.
1.
59
64
1.
1.
1.
COMMON PROPERTY
94
1.
66
1.
RP78252
17.10 2
2 STOREY
74
BRICK UNITS
1.
35.46
67 2 GTP395
59
1. 630m²
1.
6.09
7
72
3
66
.7
1.
1
1.
742m²
SHED
35.46
GTP156216
68
1.
18.36
DECK
IO
MH
LL: 1.53
CP
49
IL: 0.52
1.
65
50
47
1.
1.
1.
14.83 20.92
60
1.
2 STOREY 6 GTP671
SINGLE STOREY
4 RP72986 BLOCK & H'PLANK
BLOCK UNITS
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
| LOTS 2 & 3 ON RP 78252
‘ Level Datum AHD
N Level Origin PM 56277, RL 1.635m
|
\
www.dialbeforeyoudig.com.au
———
DIAL1100
BEFORE YOU DIG
80-120mm AGGREGATE
(NO FINES) HARD STAND
OVERLAY FOR DELIVERY'S. \
DURING CONSTRUCTION. \
CREATE BUNDING IN TEMPORARY
HARDSTAND FOR DIVERISION INTO
SILT FENCES.
|
{
le
i%
3
8
1283
yl 3
: a
' 2 ‘
fit =|
I |
id | |
‘| e |
lle EXISTING SEWER CONNECHION
io PONT TO BE RELOCATED! cLEAR |
[hes OF PROPOSED STRUCTURES 10
iL UNITY WATER STANDARDS AND Td.
% ia DEVELOPERS EXPENSE. |
a EX. SMH il 1
|
HBX. sop |
— Le H
bk [eee
re
EX. SCP
SINGLE STOREY 4 RP72986
SITE PLAN — SILT & SEDIMENT EROSION CONTROL
Scale 1: 200
CONTRACTOR TO LOCATE ALL SERVICES PRIOR TO
COMMENCING WORKS ON SITE, ALL SERVICES ARE
TO BE PROTECTED IN ACCORDANCE WITH THE
AUTHORITY RESPONSIBLE FOR THE SERVICE
‘SITE DRAINAGE — CONSTRUCTION
ENSURE GROUND PROFILE DURING CONSTRUCTION FALLS
TOWARDS THE CENTRE OF THE ALLOTNENT THEN TOWARDS
THE FRONT BOUNDARY NHERE RUNOFF WLL DRAIN THROUGH
THE SILT FENCES, IN NO INSTANCE SHALL THE ALLOTMENT
RAIN INTO NEIGHBOURING ALLOTMENTS,
SITE_ORAINAGE — CONSTRUCTION
CONSTRUCTED STORM WATER PITS WITHIN THE SITE ARE TO
BE COVERED UNTIL THE SITE IS CONPLETED OR TO BE
FITTED WTH SILT PROTECTION MEASURES TO THE APPROVAL
OF THE ENGINEER
FALL SITE TOWARDS
\'& SILT FENCES.
PROPOSED
GTP395
aye roges
R.P. BOUNDARY
= SLE- — SLE
DUST MOBILISATION FROM WIND ACTION
SITE CONTROL TO INCLUDE PROTECTION AGAINST THE
CARRIAGE OF SOIL SEDIMENT FROM WIND ACTIONS. SITE
FOREMAN TO COVER ALL STOCKPILES WITH HESION OR
SIMILIAR, PROVIDE SILT FENCING AROUND BASE OF
STOCKPILES
MAINTENANCE OF SILT PROTECTION
‘SITE FOREMAN TO MAINTAIN ALL SILT AND SEDIMENT
PROTECTION MEASURES THROUGHOUT THE DURATION OF
THE PROJECT. ANY BREACHING OF THE PROTECTION
MEASURES MUST BE REMEDIATED IMMEDIATELY AND
REPORTED TO THE ENGINEER FOR CORRECTION MEASURES.
SILT RUNOFF PROTECTION IS TO BE MAINTAINED UNTIL
‘SUCH POINT THAT LANDSCAPING IS COMPLETED AND NOT
SUSCEPTABLE TO STORMWATER SCOUR.
LEGEND CONSTRUCTION NOTES.
GENERAL:
‘ 1-00 NOT SCALE FROM THS ORAMNG
< 2. ALL DMENSONS I MLLWETRES
EXISTING SURFACE SPOT LEVELS. 3, SETTING OUT DIMENSIONS ARE TO BE OBTAINED FROM THE ARCHITECTURAL
ORAWNCS.
4. ANY OISREPANDES BETWEEN THESE DRAWNG AND THE ARCHTECTRAL
—sur—_ SILT RETENTION FENCE TO DETAIL ORAWNGS ARE TOBE REFERRED TO HE ENGREER MUEDATELY
Sr BADER RESPONSI 0% ICATG AL XSTNG SERVES
———— E ————_INDICATES OVERHEAD ELECTRICITY WITHIN AND ADJACENT THE ALLOTMENT AND SHALL ENSURE THAT ALL NEW
SUPPLY INE fe ATM Me TCD es OP
A
FOOTPATHS AND DRIVEWAYS:
INDICATES EXISTING SEWER LINE 1VERSING FOOTPATH CUT ROR 7 RENOVA
2 aso Ae HOT DESENED FOR COMEGAL VOLES
5: GONE OVEN TO 5m I ELON ANT NSD
———— \y —————__ INDICATES WATER MAIN APPROX TREATMENTS, e STAPH : Re CEN A INSH
ALIGNMENT, BUILDER TO CONFIRM POOR SAFCE TOLRINE 45cm MER 3.0m
ARON OGATION PROS 40 WORKS 5 COE 3 N-ACOOME WT HS TTe A BS 360
6. REINFORCEMENT FABRIC TO AS 1304, PLACED CENTRAL SLAB DEPTH
7, EXPANSION JONTS TO BE 10mm WDE WET TOOLED WTH EVERY 2ND MESH
WRE CUT ALONG JONT.
SW/EX INDICATES EXISTING STORMWATER 8. ONE ACCESS POINT PERMITTED FOR EACH ALLOTMENT.
DRAIN 8 FR CURVED ORVENAN, MAM RIDES APPLY TO MSDE EDGE OF
10, ALL SERWGES TO BE LOCATED AND PROTECTED AS REQUIRED PRIOR 10
WORK COMMENCING
FILLING NOTES:
THE STE I TO BE SCRAPED CLEAR OF ALL ORGANIC MATERIAL AND
DEBRIS.
— THE SUBGRADE 1S TO BE ROLLED WTH A WBRATING STEEL DRUM
ROLLER TO ACHEVE A WINMUM RELATIVE FELD DENSITY OF 95% THE
COMPACTION IS TO BE SUFFICIENT TO ACHIEVE A BLOW COUNT OF 7
BLOWS PER 300mm WITH AN APPROVED PERTH SAND PENETROMETER
FOR A DEPTH OF 1.0m BELOW EXCAVATED LEVEL. COPIES OF
‘COMPACTION TEST RESULTS SHALL BE PRESENTED TO SOG CONSULTING
ENGINEERS FOR APPROVAL.
THE FILL MATERIAL CLEAN GRANULAR MATERIAL (IE. SAND TO A
CLAYEY SAND IN ACCORDANCE WITH ASI726) BE FREE OF ANY
ORGANIC MATERIAL AND HAVE A CLAY CONTENT OF LESS THAN 12%
(PLASTICITY INDEX LESS THAN 25%, LINEAR SHRINKAGE OF 15%). THE
PROPOSED MATERIAL IS TO BE INSPECTED BY SCG CONSULTING
ENGINEERS PRIOR TO ITS REMOVAL TO ENSURE ITS COMPATABILITY.
~ THE FIL 1S TO BE PLACED AND COMPACTED IN ACCORDANCE WITH
‘AS3798—1996 TO A LEVEL SUFFICIENT TO ACHEVE A LEVEL 1
CERTIFICATION WTH A MINMUM RELATIVE FELD DENSITY OF 95%
COPIES OF COMPACTION TEST RESULTS SHALL BE PRESENTED TO SCG
CONSULTING ENGINEERS FOR APPROVAL.
— FILLING AND COMPACTING ADJACENT ENSIMNG STRUCTURES IS TO BE
IN STRICT ACCORDANCE WTH THE ASSOCIATED DETALS AND
SPEOFCATIONS.
— AREAS WHERE EXISTING STRUCTURES OR TREES ARE REMOVED SHALL
BE BACKFILLED WTH THE APPROVED FILL MATERIAL COMPACTED IN
ACCORDANCE WTH AS2870-1996 TO ACHIEVE A MNMUM RELATE
FELD DENSITY OF 95%
~ ANY LOOSE OR SOFT MATERIAL UNCOVERED IN THE STE
PREPARATION SHALL BE REMOVED AND REPLACED WITH THE APPROVED
FILL MATERIAL COMPACTED IN ACCORDANCE WITH AS2870-1996 TO
ACHEVE A MINMUM RELATIVE FELD DENSITY OF 95%
— SITE DRANAGE AND SILT PROTECTION MEASURES MUST BE (STALLED
PRIOR TO CONSTRUCTION COMMENCING
900(W) GEO-FABRIC SILT
FENCE, FIXED TO SPIKES AND -—§
BURIED 300 INTO STABLE
GROUND.
SILT RETENTION
THE CONTRACTOR IS TO INSTALL APPROVED SILT
RETENTION FENCES PRIOR TO COMMENCING ANY
EARTHWORKS. THE FENCE IS TO BE CONSTRUCTED
ALONG THE LOWEST BOUNDARY AND RETURNED UP
SIDE BOUNDARIES TO ENSURE FULL STORMWATER
ENTRAPMENT. SURFACE RUNOFF FROM WITHIN THE
ALLLOTMENT MUST DRAIN TOWARDS THE FENCE AND
SHALL NOT ENTER NIEGHBOURING ALLOTMENTS
THROUGH THE USE OF SURFACE BUNDING OR
SCOUR PROTECTED DRAINS. THE FENCE MUST
\f wl re REMAIN IN PLACE UNTIL SUCH TIME THAT FINISHED
Fy LANDSCAPING AND DRAINAGE MEASURES ARE.
E] INSTALLED
SILT FENCE DETAIL
1200(L) 50 SQ. HOWD
SPIKES, 1800 CTRS DRIVE
600 INTO GROUND.
| AVENDED FOR NEW ARCHTEGTURATS [0B 047
Rsion | Deserition Date
Tssue:
FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
KEY “re desin ond osaited detlscetained on this ond asoitd
ovis cy endo foe ede eye iat
EX. SWPT EXISTING STORMWATER MANHOLE /PIT ‘the witten permission of SCG Consulting Engineers.
EX SOP EXISTING SEWER CONNECTION POINT -———
RC. HW. REINFORCED CONCRETE. HEADWALL es SCG Noosa Heads’
EX SMH EXISTING SEWER MANHOLE
EX. SWMH EXISTING STORMWATER MANHOLE 5 ) tolsengsegargrscon
‘SWMH NEW 1050 STORMWATER MANHOLE 2 Nee: web: ww sog-engineers.com
£08. EXISTING EDGE OF BITUMEN H
K&C EXISTING KERB & CHANNEL Tue
NISL NATURAL SURFACE LEVEL
FH FIRE HYDRANT OPERATIONAL WORKS:
TP TELSTRA PIT
EP. ELECTRICAL POWER POLE SILT & SEDIMENT CONTROL
KERB EXISTING KERBING oe
Project
Lots 2 & 3 RP78252
Elizabeth St, NOOSAVILLE
Pate Nov 16 | gk
| Fass. t 26281-0W2| A.
Page 3
BM: NAIL IN KERB
RL: 1.600
55 57
1. 47
57
1. .35
40
44
43
54
61
1. 1.
48
8
1.
1.
1.
1.
1.
1
1.
5
1.
PP PP
51
1. .59
56
1.
55
54
50
1
54
1.
1.
1.
1.
5
40
5
WM
1.
1.
WM
66
4
1.
5
03
1.
58
20.92 20.92
58
2.
1.
9
64
1.
5
1.
1.
COMMON PROPERTY
94
1.
66
1.
RP78252
17.10
2
2 STOREY
74
BRICK UNITS
1.
35.46
67 2 GTP395
59
1. 630m²
1.
6.09
77
72
3
66
1.
1.
1.
742m²
SHED
35.46
1.73 GTP156216
68
1.
1.
18.36
DECK
IO
MH
LL: 1.53
CP
49
IL: 0.52
1.
65
50
47
1.
1.
1.
14.83 20.92
60
1.
2 STOREY 6 GTP671
SINGLE STOREY
4 RP72986 BLOCK & H'PLANK
BLOCK UNITS
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
LOTS 2 & 3 ON RP 78252
Level Datum AHD
I Level Origin PM 56277, RL 1.635m
7
REFER DRG OW4 FOR
SEWER PROTECTION
DETAILS
ENISTING STRUCTURE /OWELLING
INCLUDING NEIGHBOURING
‘ALLOTMENTS
THE BUILDER /CONTRACTOR
SHALL CONFIRM ALL
RELEVANT LEVELS PROR TO
COMMENCING WORKS.
“HS FOOTNG WTHOUT
Sy F “PIERS 1S FOUNDED
1H FOOTNG 1s FOUNDED ‘Xe, |! ‘BOVE CRTCAL DEPTH
BELOW CRITICAL DEPTH smae * G02 LUNE AND 1S UNSTABLE.
UNE AND IS STABLE eS
LUNE OF PROPOSED TRENCH
— EXCAVATION. OR EXISTNG
i
tot
PIERS OR UNDERPINNING FOUNDED Lad.
Ss SERWCES TRENCH
BELOW THE CRITICAL DEPTH LUNE
‘WOULD BE NEEDED TO SUPPORT
ANY FOOTING THAT IS FOUNDED
CRITICAL DEPTH LINE Tes DET aso apUES To exsNe FOMDKTONS
(ON NEIGHBOURING PROPERTIES. SHEET PLING MUST
BE INSTALLED WHERE BNSTING FOOTINGS WL BE
FOUNDED ABOVE ANY EXCAVATION CRITICAL DEPTH
UNE
www.dialbeforeyoudig.com.au
———
DIAL1100
w
~-~-f = = = =RP. BOUNDARY
w— w
SHE
Ee
REFER DRG OW4 FOR Ze scP
SEWER PROTECTION
os - ~ 7
Fiu-o.am RW | | BENPET rom
~L|
\to™
\ | tT PROPOSED TIMBER
\! LANDSCAPING WALLS Ca
\ ADJACENT PROPOSED $
{ DRIVEWAY IF REQUIRED. N
2. i\ 3
FILL=1.11m APPROX. FILLI VOLUME 1495m 2
| \~ 28
z
é Paton ‘ “
FILL-1.0m 1.3 son
Ks 2 je J STPs%e
~| @
‘gl ob
g iN Io
=| C
aon 2! ¥ g
_ $ | | e 2 GTP 1p
ly . FILL-O.1.2m &
me ! lg a
g &
ze | 15
I |
ec scP | |
2 ' FILL-0.9m
Lg FILL-0.9m fo RW TIPE 1 a ---- 70S
q T —__ RP? BOUNDARY
DETAILS
snoiesroney 4
SITE PLAN ~ EARTHWORKS & RW SETOUT
Scale 1: 200
CONTRACTOR TO LOCATE ALL SERVICES PRIOR TO
COMMENCING WORKS ON SITE. ALL SERVICES ARE
TO BE PROTECTED IN ACCORDANCE WITH THE
AUTHORITY RESPONSIBLE FOR THE SERVICE
ALL LINE MARKING TO BE IN. ACCORDANCE
WITH THE QUEENSLAND MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES & AS 2890.1
PARKING FACLITIES PART 1: OFF-STREET CAR
PARKING
RP72986 [
{!PLANK
LEGEND
+ EXISTING SURFACE SPOT LEVELS.
INDICATES OVERHEAD ELECTRICITY
‘SUPPLY LINE
INDICATES EXISTING SEWER LINE
INDICATES PROPOSED SEWER LINE
—_____ | ——___ INDICATES TELSTRA LINE APPROX
ALIGNMENT, BUILDER TO CONFIRM
EXACT LOCATION PRIOR TO WORKS
sw/ex—_ INDICATES EXISTING STORMWATER
. DRAIN
RP. BOUNDARY
1/N12 TOP —
' FILLED LOT
| p GROUND LEVEL
190 BLOCK — CORE
FILLED N12-400 V & H—=
— LAP BARS SOOMM.
PROVIDE FULL HT.
MOVEMENT JOINTS AT
8.0M CTRS.
ALL CORES CLEARED =
BEFORE POUR VIA
CLEAN-OUT BLOCKS. N
GROUND LEVEL
aa —
(2 | 200MM FREE DRAINING
BACKFILL WITH AGI PIPE
2 TO OUTLET.
8
ge
2 150 THK HEEL SL82
H | 8 2 MESH TOP 40 COVER.
1500 | 1000 =
00 | oe SLITTM TOP & BOTTOM
500 | 300 R6 LIGS AT 900 CTRS
300 4,000
BLOCK RETAINING WALL - TYPE 1
TYPICAL SECTION
1
ii
|} SPOON DRAIN OR SIMILIAR
Y TO RE-DIVERT STORMWATER.
VERTICAL MEMBERS AS PER |
TABLE, 1200 CTRS, RAKE
BACK AT ANGLE SHOWN,
L__
GEOFABRIC OR SIMILIAR FOR
8 SILT/FINES RETAENSION.
= | 200X50 HORIZONTALS
g FOR DEPTHS UP TO 1600
= BEYOND USE 200X75. wd] 200X400MM FREE DRAINING
= + BACKFILL IN GEOFABRIC
z [|
cron eve, i} RAPPING WITH AGI PIPE TO
GRADE CONCRETE AWAY
FROM POSTS.
20MPA COMPACTED
CONCRETE.
DBPRAHASSSBPEFIEED.
ALL MEMBERS T0
| | BE H4 TREATED
Ly 4000 | HOWD
SLEEPER RETAINING WALL ALTERNATIVE DETAIL.
"H RETAINED ] VERTICAL MEMBER | FOOTING DEPTH
(0x 8)
600 200 x 75 400
900 200 x 75 900
1200 200 x 100 1200
1600 100 x 200 1500
2000 2/125 x 200 1800
CONSTRUCTION NOTES
GENERAL:
1. DO/NOT SCALE FROM THIS DRAWN,
2. ALL OMENSONS IN MILLIMETRES
‘3. SETTING OUT DMENSIONS ARE TO BE OBTAINED FROM THE ARCHITECTURAL
DRAWINGS,
4. ANY DISCREPANCIES BETWEEN THESE DRAWING AND THE ARCHTECTURAL
DRAWINGS ARE TO BE REFERRED TO THE ENGINEER IMMEDIATELY
5. THE BUILDER IS RESPONSIBLE FOR LOCATING ALL ENSTING SERWCES
WTHIN AND ADJAOENT THE ALLOTMENT AND SHALL ENSURE THAT ALL NEW
WORKS ARE IN-ACCORDANCE WTH THE ATTACHED CRTICAL DEPTH LINE
DIAGRAM,
FOOTPATHS AND DRIVEWAYS:
1. EXISTING FOOTPATHS TO BE SAW CUT PRIOR TD REMOVAL
2. CROSSINGS ARE NOT DESIGNED FOR COMMERCIAL VEHICLES
‘3 CONCRETE ORIVEWAY TO BE 125mm THK. EXCLUDING ANY FISHED
TREATMENTS, ES. STANPING
4. CONCRETE SURFACE TOLERANCE +5 nm OVER 3.0m
5. CONCRETE N25 IN ACCORDANCE WITH AS 1379 AND AS 3600
6. REINFORCEMENT FABRIC TO AS 1304, PLACED CENTRAL SLAB DEPTH,
7, EXPANSION JONTS TO BE 10mm WDE WET TOOLED WTH EVERY 2ND MESH
WRE CUT ALONG JONT,
. ONE ACCESS PONT PERMITTED FOR EACH ALLOTMENT.
9. FOR CURVED ORIVEWATS, MAXIMUM GRADES APPLY TO INSDE EDGE OF
CURVE
10. ALL SERVICES TO BE LOCATED AND PROTECTED AS REQURED PRIOR TO
WORK COMMENCING
FILLING NOTES:
THE SITE 1S TO BE SCRAPED CLEAR OF ALL ORGANIC MATERIAL AND
DEBRIS.
= THE SUBGRADE IS TO BE ROLLED WITH A VIBRATING STEEL DRUM
ROLLER TO ACHIEVE A MINIMUM RELATIVE FIELD DENSITY OF 95% THE
COMPACTION IS TO BE SUFFICIENT TO ACHIEVE A BLOW COUNT OF 7
BLOWS PER 300mm WTH AN APPROVED PERTH SAND PENETROMETER
FOR A DEPTH OF 1.0m BELOW EXCAVATED LEVEL. COPIES OF
COMPACTION TEST RESULTS SHALL BE PRESENTED TO SCG CONSULTING
ENGINEERS FOR APPROVAL.
— THE FILL MATERIAL CLEAN GRANULAR MATERIAL (LE. SAND TO A.
CLAYEY SAND IN ACCORDANCE TH ASI726) BE FREE OF ANY
ORGANIC MATERIAL AND HAVE A CLAY CONTENT OF LESS THAN 12%
(PLASTIC INDEX LESS THAN 25% LINEAR SHRINKAGE OF 152). THE
PROPOSED MATERIAL IS TO BE INSPECTED BY SCG CONSULTING
ENGINEERS PRIOR TO ITS REMOVAL TO ENSURE ITS COMPATABILITY,
— THE FILL IS TO BE PLACED AND COMPACTED IN ACCORDANCE WITH
AS3798~1996 TO A LEVEL SUFFICIENT TO ACHIEVE A LEVEL 1
CERTIFICATION WITH A MINIMUM RELATIVE FIELD DENSITY OF 95%
COPIES OF COMPACTION TEST RESULTS SHALL BE PRESENTED TO Sc
CONSULTING ENGINEERS FOR APPROVAL.
FILLING AND COMPACTING ADJACENT EXISTING STRUCTURES IS TO BE
IN STRICT ACCORDANCE WITH THE ASSOCIATED DETAILS AND
SPECIFCATIONS
— AREAS WHERE EXISTING STRUCTURES OR TREES ARE REMOVED SHALL
BE BACKFILLED WITH THE APPROVED FILL MATERIAL COMPACTED IN
ACCORDANCE WITH AS2870-1996 TO ACHIEVE A MINIMUM RELATIVE
FIELD DENSITY OF 95%
= ANY LOOSE OR SOFT MATERIAL UNCOVERED IN THE SITE
PREPARATION SHALL BE REMOVED AND REPLACED WTH THE APPROVED
FILL MATERIAL COMPACTED IN ACCORDANCE WTH AS2870-1996 TO
ACHIEVE A MINMUM RELATIVE FIELD DENSITY OF 95%
= SITE DRAINAGE AND SILT PROTECTION MEASURES MUST BE ISTALLED
PRIOR TO CONSTRUCTION COMMENCING,
KE
EX. SWPT EXISTING STORMWATER MANHOLE /PIT
EX. SCP EXISTING SEWER CONNECTION POINT
RC. HW. REINFORCED CONCRETE HEADWALL
EX. SMH EXISTING SEWER MANHOLE
EX. SWMH EXISTING STORMWATER MANHOLE
SWMH NEW 1050 STORMWATER MANHOLE
E.0B. EXISTING EDGE OF BITUMEN
kK &C EXISTING KERB & CHANNEL
NSL NATURAL SURFACE LEVEL
FH. FIRE HYDRANT
TP TELSTRA PIT
EP. ELECTRICAL POWER POLE
KERB EXISTING KERBING
‘A___ | AMENDED FOR NEW ARGHTECTURALS | 08.04.17
Revision | Deseription Date
"FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
‘The design and ossucited deals contsned on this ond associated
tawings ere expyight ond re rot to be used or reprodiced wihaut
the wiles parmision of SCE Conslng Engineers
=~ Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
a senalacnni@sepergneascon
wena sogengineers.com
“OPERATIONAL WORKS:
EARTHWORKS & RW DETAILS
Project,
f res Lots 2 & 3 RP78252
DICATES DEPTH OF CUT OR FI \eRTic .
BEFORE YOU DIG Fill-1.8m ISHOID ERTL D Elizabeth St, NOOSAVILLE
Pate Nov 16 | gk
ote ks Checked Brg No
tau —F 100 0 a3) SRS, t 26281-OW3) A.
Page 4
BM: NAIL IN KERB
RL: 1.600
55 57
1. 47
57
1. .35
40
44
3
4
61
1. 1.
48
4
5 58
1.
1.
1.
1.
1.
1
1.
1.
PP PP
51
1. .59
56
1.
55
54
0
1
54
1.
5
1.
1.
1.
55
4 0
WM
1.
1.
WM
66
54
1.
3
1.
58
0
20.92 20.92
58
2.
1.
59
4
1.
6
1.
1.
COMMON PROPERTY
94
1.
66
1.
RP78252
17.10
2
2 STOREY
47
BRICK UNITS
1.
35.46
67 2 GTP395
59
1. 630m²
1.
6.09
77
72
3
66
1.
1.
1.
742m²
SHED
35.46
GTP156216
68
1.
18.36
DECK
IO
MH
LL: 1.53
CP
49
IL: 0.52
1.
65
50
47
1.
1.
1.
14.83 20.92
60
1.
2 STOREY 6 GTP671
SINGLE STOREY
4 RP72986 BLOCK & H'PLANK
BLOCK UNITS
1.73 Issue:
1.
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
LOTS 2 & 3 ON RP 78252
Level Datum AHD
I Level Origin PM 56277, RL 1.635m
7
| GRIDE OF W0 UNO, SONS ARE TOBE CASTUCTED
REQUIREMENTS. ' f ACCORDANCE WH THE MARUFACTURERS REQUIREMENTS.
z | \ 6, SENERS 100MM DIAM. UPVC UN. AND LAD AT A MINMUM GRADE
= | IW 60
2) 7, WATER SUPPLY PPENORK BELOW GROUND TO BE;
8252 3 | MM DIAM, OR LESS — HIGH DENSITY TYPE 50
a I UNIT 1 CLASS 12 POLYETHYLENE
a \ 8. AL ABOVE GROUND AND INTERNAL WATER SUPPLY PENORK TO BE
= | FFL 2.70 2 2 TPE B COPPER.
(er! UNIT 2 9, WATER SERVOES ARE NOT PERATTED W GROUND SLABS AND AL
PIERING TO RETAINING WALL \ JOS AND CEANECTONS SHALL BE MADE ABOVE THE SLAB
‘ADJ NEW SEWER BRANCH SI IS FFL 2.70 4 10. ARE HYDRANTS ARE TO BE INSTALLED ARE TO BE INSTALLED IN
— 1B yi ACCORDANCE WITH AS2419.1. HOSE REELS ARE 10 BE INSTALLED IN
REFER SECTION 3\ ACCORDANCE WITH AS2441
|2 TEA TUT, SET CORA NO CEBNG CAPS STUD W
By GTP395 VECULAR OR PEDESTRIN PAVEMENTS ARE TO BE FIED WT ETHER
2 2 he 37P395 BRASS OR CAST-IRON COVERS
—-—- 6 a p—-—-— 12. ALL IN-GROUND VALVES SHALL BE IN ACCORDANCE IN. APPROVED
e| B\ - CONCRETE PATH SOKES.
21s) x 13. ALL WASTE PPES AND WATER SERVCES PEKETRATAG SLABS TO BE
|e RIPPED Wi AN APPROVED FLBNBLEJONT JONT WRAPPG
dye aaa 1, 14 TERW SERVICE” REFERS TO THE MNMLM KTERKAL PPE
a <a DIAMETER UNLESS NOTED OTHERWISE.
| a
UNIT 4 1 &
L210 «gs | UNIT 3 2 erpyft
wy FFL 2.70 &
3 |
8 a
3 . | a
x KEY
Ss EX. SMH Heal 1 EX. SWPT EXISTING STORMWATER MANHOLE /PIT
N | EX. SCP EXISTING SEWER CONNECTION POINT
1 RC. HW. — REINFORCED CONCRETE HEADWALL
& EX. SMH EXISTING SEWER MANHOLE
—-—_-—_-—_-—_-—_8 dL EX. SWMH EXISTING STORMWATER MANHOLE
© T EXISTING STRUCTURES IN NEIGBOURING ate oe oe aru oe
EX. SOP PROPERTIES 0 BE PROTECTED AGAINST eC EXRING KERB Je CHANNEL
UNDERMINING DURING TRENCHING NSL NATURAL SURFACE LEVEL
| WORKS, REFER CRITICAL DEPTH LINE Fi FIRE HYDRANT
SINGLE STOREY € RP72986 DIAGRAM TP TELSTRA PIT
a EP. ELECTRICAL POWER POLE
KERB EXISTING KERBING
sv ‘STOP VALVE
SITE PLAN — SEWER PROTECTION PLAN EXISTING HCB DECOMISSIONED
Scale 1: 100
EXISTING STRUCTURE /DWELLING
INCLUONGWeBOURNG
ALLOTMENTS
THE BULDER CONTRACTOR g 7
SHALL ONFR ALL 3
RELEVANT LEVELS PRIOR TO 2 FOUING #00 148 TO
COUENENS WORKS SON en BLOCK RETANING WALL a DESIGN AND OETAL BY
BY THIS FIRM. Nv Sent DETAIL NA RL 2.3 APPROX. PAVEMENT DESIGN FFL THIS FIRM.
ae OTe
a PIES 1 FOUNDED { 7
pereons ano | AS Us | ae GT tn a DPT Tot zg
Ine wo IS STHIE sua Sees UNE AND IS UNSTABLE. Colo [ 33 ©_| AMENDED FOR NEW ARCHITECTURATS | 08.0417
yl ee a &5 ‘A__| SEWER/BRANCH EASEMENT RELOCATED] 08.11.17.
RL 1.4 APPROX. RL 1.4 APPROX. ~
1 | LNE oF PROPOSED TRENCH y ) sion | Deserition Date
A of vaca agoed [——t—S. , |-— REAL EE ~ a a I i ~ Tssue:
BELOW THE CRITICAL DEPTH LINE WS E FOR APPROVAL
OUD BE NEEDED” 10 SUPPORT N
ANY FOOTNG THAT 1S FUNDED Se fT
a a DO NOT SCALE FROM THIS DRAWING
vor The design nd onctd deta cntaied on hs nd escted
CRITICAL DEPTH LINE. Ni oerau aso appUES To BUSING FOUNOATINS sosme sc ue S550 COMET SEER PROTECTION emcee got oh ro wat
ON NEIGHBOURING PROPERTIES. SHEET PILING MUST — ve writen permission of -ansulting Engineers,
BE INSTALLED WHERE EXISTING FOOTINGS WILL BE 24m MAX ~ SEWER INVERT LEVELS AS SHOWN.
FOUNDED ABOVE ANY EXCAVATON CRITEAL DEPTH CENTRES ea 1am MN 1m Mi 4ysi2/FUL HT a Unit 1/11 Project Ave,
UNE SCG Noosa Heads
ae i Ns ned wwnsegergre cn
Pens FOUN See oeeTON ‘CONNECTION BRANCH. BUILDER TO 33 OPERATIONAL WORKS:
CONFRIM ROR. 10° CONSTRUCTION
- - HD ERT ES 8 Se nue wane SEWER PROTECTION DETAILS
www.dialbeforeyoudig.com.au Ni2/PUL. HT ENCOUNTERED ON SITE pS
— Project
DIAL1100 Lots 2 & 3 RP78252
(A HCB PROTECTION (CB. REAR SEWER PROTECTION Elizabeth St, NOOSAVILLE
+
BEFORE YOU DIG XT MPICAL SECTION (7 TYPICAL SECTION
Pate Nov 16 | gk
oot oe aks Checked Drg No.
hanni—t_}—1_im @ A143) apa ses
@ AS {|S Richardson 26281-OW4 B.
EXISTING DRIVEWAY
(TO BE MODIFIED T0 KERB)
48.0
MAINTAIN MIN. 1.2m DISTANCE
BETWEEN STRUCTURES AND a
SEWER LINE AS PER QDC
=
swex
LEGEND.
Qa INDICATES EXISTING SURFACE
CONTOUR AND LEVEL 10 AHD.
INDICATES OVERHEAD ELECTRICITY
SUPPLY LINE
INDICATES EXISTING SEWER LINE
INDICATES PROPOSED SEWER LINE
INDICATES WATER MAIN APPROX
ALIGNMENT, BUILDER TO CONFIRM
EXACT LOCATION PRIOR TO WORKS
INDICATES TELSTRA LINE APPROX
ALIGNMENT, BUILDER TO CONFIRM
EXACT LOCATION PRIOR TO WORKS
INDICATES STORMWATER DRAIN
PROPOSED AS NOTED MIN 1 IN
100 FALL UNLESS NOTED
OTHERWISE
INDICATES STORMWATER DRAIN
EXISTING AS NOTED MIN 1 IN 100
FALL UNLESS NOTED OTHERWISE
IK
GENERAL:
1, DO NOT SCALE FROM THIS DRAWN,
2. ALL DIMENSIONS IN MILLIMETRES
‘3. SETTING OUT DMENSIONS ARE TO BE OBTANED FROM THE
[ARCHITECTURAL DRAWINGS.
4, ANY DISCREPANCIES BETWEEN THESE DRAWING AND THE
ARCHITECTURAL ORAWINGS ARE TO BE REFERRED TO THE ENGINEER
IMMEDIATELY.
5. THE BUILDER IS RESPONSIBLE FOR LOCATING AL EXSTNG
SERVCES WITHIN AND ADJACENT THE ALLOTMENT AND SHALL ENSURE
THAT ALL NEW WORKS ARE IN ACCORDANCE WITH THE ATTACHED
CRITICAL DEPTH UNE DIAGRAM,
FOOTPATHS AND DRIVEWAYS:
|. EXISTING FOOTPATHS TO BE SAW CUT PRIOR TD REMOVAL
2. CROSSINGS ARE NOT DESIGNED FOR COMMERCIAL VEHICLES
‘3. CONCRETE DRIVEWAY TO BE 125mm THK. EXCLUDING ANY
FISHED TREATMENTS, EG. STANPING
4 CONCRETE SURFACE TOLERANCE +5.nm OVER 3.0m
5, CONCRETE N25 IN ACCORDANCE WITH AS 1379 AND AS 3600
6. REINFORCEMENT FABRIC TO AS 1304, PLACED CENTRAL SLAB
DEPTH,
7. EXPANSION JOINTS 10 BE 10mm WOE WET TOOLED WTH EVERY
2ND MESH WRE CUT ALONG JON,
1 ONE ACCESS PONT PERMITTED FOR EACH ALLOTMENT,
9. FOR CURVED DRIVEWAYS, MAMMUM GRADES APPLY TO INSIDE
EDGE OF CURVE
10. ALL SERVICES TO BE LOCATED AND PROTECTED AS REQUIRED
PRIOR TO WORK COMMENCING
HYDRAULICS
1, HYDRAULIC SERVICES SHOWN ARE DIAGRAMATIC ONLY, REFER TO
ARCHITECTURAL DRAWINGS FOR LOCATIONS OF FIXTURES.
2, ALL SANTARY HYDRAULICS AND WATER RETIOULATION WITHIN THE
ALLOTMENT BOUNDARY TO BE IN ACCORDANCE WTH AS3500.
3. ALL WORK SHALL COMPLY WTH THE RECUREMENTS OF AUTHORITIES
HAVING JURISDICTION, AFTER OBTAINNG ALL NECESSARY PERMITS AND
APPROVALS,
4, THE CONTRACTOR IS TO CONFIRN THE POSITON OF ALL ESTING
SERVICES AS NOICATED ON THESE AND ASSOGATED PLANS PRIOR TO
THE COMMENCING OF WORK.
5, STORMWATER DRANAGE PIPES SHALL BE CLASS SH UPVC OR CLASS
2. RCP RUBBER RING JONTED PIPE AS NOTED LAID AT A MINMUM
Page 5
BM: NAIL IN KERB
RL: 1.600
55 57
1. 47
57
1. .35
40
44
43
54
61
1. 1.
48
8
1.
1.
1.
1.
1.
1
1.
5
1.
PP PP
51
1. .59
56
1.
55
54
50
1
54
1.
1.
1.
1.
5
40
5
WM
1.
1.
WM
66
4
1.
5
03
1.
58
20.92 20.92
58
2.
1.
9
64
1.
5
1.
1.
COMMON PROPERTY
94
1.
66
1.
RP78252
17.10
2
2 STOREY
74
BRICK UNITS
1.
35.46
67 2 GTP395
59
1. 630m²
1.
6.09
77
72
3
66
1.
1.
1.
742m²
SHED
35.46
GTP156216
68
1.
18.36
DECK
IO
MH
LL: 1.53
CP
49
IL: 0.52
1.
65
50
47
1.
1.
1.
14.83 20.92
60
1.
2 STOREY 6 GTP671
SINGLE STOREY
4 RP72986 BLOCK & H'PLANK
BLOCK UNITS
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
LOTS 2 & 3 ON RP 78252
Level Datum AHD
7
Level Origin PM 56277, RL 1.635m
www.dialbeforeyoudig.com.au
———
DIAL1100
BEFORE YOU DIG
PROPOSED LOT 2 & 3 INSTALL DOMESTIC 25 Diam
BRANCH CONNECTION AND METERS FROM WATER MAIN
IN ACCORDANCE WITH UNITYWATER SPECIFICATIONS &
DETAILS. UNITYWATER APPROVAL TO BE OBTAINED
ALL WORKS BY UNITYWATER AT DEVELOPERS COST.
REFER TO HYDRAULIC CONSULTANTS DRAWINGS FOR
METER REQUIREMENTS.
NEW 259 DIAMETER
BRANCHES FROM WATER
MAIN
INTERNAL WATER SUPPLY,
RETICULATION BY HYDRAULICS
CONSULTANT. TYPICAL.
8252
6 ° . 4
_—e— aes fe E
a RP -BOUN oa
mi [s 2 v
| Pepe | POO
7 Le.
= |
3)
3 |
=! UNIT 1
& | FFL 2.70 | 2
| UNIT 2 as
| ie FFL 2.70 BR
\ 1s GTP395
8 & | | __ SIPS
F| —
SHED | jo
UNIT 4 |
FFL 2.70 ! =
( g
e | UNIT 3 3 GTP pt
© “| J FFL 2.70 8
~* ' a
me &
° 10
RP72986
SITE PLAN — WATER SUPPLY
Scale 1: 200
CONTRACTOR TO LOCATE ALL SERVICES PRIOR TO
COMMENCING WORKS ON SITE, ALL SERVICES ARE
TO BE PROTECTED IN ACCORDANCE WITH THE
AUTHORITY RESPONSIBLE FOR THE SERVICE
LEGEND.
48.0
a
wv
<
FALL
w
+
EXISTING PROPERTY
BRANCHES & METERS TO BE
CAPPED OFF & REMOVED.
TYPICAL, sw
w/e. —
Qa INDICATES EXISTING SURFACE
CONTOUR AND LEVEL 10 AHD.
EXISTING SURFACE SPOT LEVELS.
INDICATES PROPOSED FINISHED
SURFACE LEVELS
INDICATES DIRECTION OF FALL
TO FINISHED SURFACES.
INDICATES OVERHEAD ELECTRICITY
SUPPLY LINE
INDICATES EXISTING SEWER LINE
INDICATES PROPOSED SEWER LINE
INDICATES WATER MAIN APPROX
ALIGNMENT, BUILDER TO CONFIRM
EXACT LOCATION PRIOR 10 WORKS
INDICATES TELSTRA LINE APPROX
ALIGNMENT, BUILDER TO CONFIRM
EXACT LOCATION PRIOR 10 WORKS
INDICATES STORMWATER DRAIN
PROPOSED AS NOTED MIN 1 IN
100 FALL UNLESS NOTED
OTHERWISE
INDICATES STORMWATER DRAIN
EXISTING AS NOTED MIN 1 IN 100
FALL UNLESS NOTED OTHERWISE
IK
GENERAL:
1, DO NOT SCALE FROM THIS DRAWN,
2. ALL DIMENSIONS IN MILLIMETRES
‘3. SETTING OUT DMENSIONS ARE TO BE OBTANED FROM THE
[ARCHITECTURAL DRAWINGS.
4, ANY DISCREPANCIES BETWEEN THESE DRAWING AND THE
ARCHITECTURAL ORAWINGS ARE TO BE REFERRED TO THE ENGINEER
IMMEDIATELY.
5. THE BUILDER IS RESPONSIBLE FOR LOCATING AL EXSTNG
SERVCES WITHIN AND ADJACENT THE ALLOTMENT AND SHALL ENSURE
THAT ALL NEW WORKS ARE IN ACCORDANCE WITH THE ATTACHED
CRITICAL DEPTH UNE DIAGRAM,
FOOTPATHS AND DRIVEWAYS:
|. EXISTING FOOTPATHS TO BE SAW CUT PRIOR TD REMOVAL
2. CROSSINGS ARE NOT DESIGNED FOR COMMERCIAL VEHICLES
‘3. CONCRETE DRIVEWAY TO BE 125mm THK. EXCLUDING ANY
FISHED TREATMENTS, EG. STANPING
4 CONCRETE SURFACE TOLERANCE +5.nm OVER 3.0m
5, CONCRETE N25 IN ACCORDANCE WITH AS 1379 AND AS 3600
6. REINFORCEMENT FABRIC TO AS 1304, PLACED CENTRAL SLAB
DEPTH,
7. EXPANSION JOINTS 10 BE 10mm WOE WET TOOLED WTH EVERY
2ND MESH WRE CUT ALONG JON,
1 ONE ACCESS PONT PERMITTED FOR EACH ALLOTMENT,
9. FOR CURVED DRIVEWAYS, MAMMUM GRADES APPLY TO INSIDE
EDGE OF CURVE
10. ALL SERVICES TO BE LOCATED AND PROTECTED AS REQUIRED
PRIOR TO WORK COMMENCING
HYDRAULICS
1, HYDRAULIC SERVICES SHOWN ARE DIAGRAMATIC ONLY, REFER TO
ARCHITECTURAL DRAWINGS FOR LOCATIONS OF FIXTURES.
2, ALL SANTARY HYDRAULICS AND WATER RETIOULATION WITHIN THE
ALLOTMENT BOUNDARY TO BE IN ACCORDANCE WTH AS3500.
3. ALL WORK SHALL COMPLY WTH THE RECUREMENTS OF AUTHORITIES
HAVING JURISDICTION, AFTER OBTAINNG ALL NECESSARY PERMITS AND
APPROVALS,
4, THE CONTRACTOR IS TO CONFIRN THE POSITON OF ALL ESTING
SERVICES AS NOICATED ON THESE AND ASSOGATED PLANS PRIOR TO
THE COMMENCING OF WORK.
5, STORMWATER DRANAGE PIPES SHALL BE CLASS SH UPVC OR CLASS
2. RCP RUBBER RING JONTED PIPE AS NOTED LAID AT A MINMUM
GRADE OF 1 IN 100 UN, JOINS ARE TO BE CONSTRUCTED IN
ACCORDANCE. WITHTHE MANUFACTURERS REQUIREMENTS,
6 SEWERS 100MM DIAM, UPVC UNO. AND LAD AT A MIMUM GRADE
oF 1 60,
7, WATER SUPPLY PIPEWORK BELOW GROUND 1S TO BE ;
53UM DIAM, OR LESS — HIGH DENSITY TYPE. 50,
CLASS 12 POLYETHYLENE
8. ALL ABOVE GROUND AND INTERNAL WATER SUPPLY PIPEWORK TO BE
TYPE B COPPER.
9, WATER SERVIOES ARE NOT PERMTTED IN GROUND SLABS AND ALL
OWNS AND CONNECTIONS SHALL BE MADE ABOVE THE SLAB
10. ARE HYDRANTS ARE TO BE INSTALLED ARE TO BE INSTALLED IN
ACOORDANOE WITH ASZ419.1. HOSE REELS ARE TO BE INSTALLED IN
ACOORDANGE WITH AS2441
11, CLEAN-OUTS, INSPECTION OPENINGS AND CLOSING CAPS SITUATED IN
VEHICULAR OR PEDESTRIAN PAVEMENTS ARE TO GE FITTED WT EITHER
BRASS OR CAST-IRON COVERS.
12. ALL IN-GROUND VALVES SHALL BE IN ACCORDANCE IN APPROVED
CONCRETE PATH BOXES.
13. ALL WASTE PIPES AND WATER SERVICES PENETRATING SLABS TO BE
WRAPPED IN AN APPROVED FLELE JOINT JOINT WRAPPING.
14, THE TERM SERVICE’ REFERS TO THE MNMUM INTERNAL PIPE
DIAMETER UNLESS NOTED OTHERWISE.
KE
EX. SWPT EXISTING STORMWATER MANHOLE /PIT
EX. SCP EXISTING SEWER CONNECTION POINT
RC. HW. REINFORCED CONCRETE HEADWALL
EX. SMH EXISTING SEWER MANHOLE
EX. SWMH EXISTING STORMWATER MANHOLE
EX. WM EXISTING WATER METER
E.0B. EXISTING EDGE OF BITUMEN
kK &C EXISTING KERB & CHANNEL
NSL NATURAL SURFACE LEVEL
FH. FIRE HYDRANT
TP TELSTRA PIT
EP. ELECTRICAL POWER POLE
KERB EXISTING KERBING
sv STOP VALVE
C__| AMENDED FOR NEW ARCHTEGTURALS | 09.04.17
B.__|_SEWER/BRANCH EASEMENT RELOCATED] 08.11.17.
‘A | UNITY WATER REVISIONS TO WATER. | 23.08.17.
Revision | Deseription Date
Ts
“FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
‘The design and ossucited deals contsned on this ond associated
tawings ere expyight ond re rot to be used or reprodiced wihaut
the wiles parmision of SCE Conslng Engineers
=~ Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
a senalacnni@sepergneascon
wena sogengineers.com
“OPERATIONAL WORKS:
| WATER SUPPLY
Lots 2 & 3 RP78252
Elizabeth St, NOOSAVILLE
Date: Drawn
Nov 16 SK
| Fass. t 26281-0W5| C.
Page 6
BM: NAIL IN KERB
RL: 1.600
55 57
1. 47
57
1. .35
40
44
43
54
61
1. 1.
48
8
1.
1.
1.
1.
1.
1
1.
5
1.
PP PP
51
1. .59
56
1.
55
54
50
1
54
1.
1.
1.
1.
5
40
5
WM
1.
1.
WM
66
4
1.
5
03
1.
58
20.92 20.92
58
2.
1.
9
64
1.
5
1.
1.
COMMON PROPERTY
94
1.
66
1.
RP78252
17.10
2
2 STOREY
74
BRICK UNITS
1.
35.46
67 2 GTP395
59
1. 630m²
1.
6.09
77
72
3
66
1.
1.
1.
742m²
SHED
35.46
GTP156216
68
1.
18.36
DECK
IO
MH
LL: 1.53
CP
49
IL: 0.52
1.
65
50
47
1.
1.
1.
14.83 20.92
60
1.
2 STOREY 6 GTP671
SINGLE STOREY
4 RP72986 BLOCK & H'PLANK
BLOCK UNITS
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
LOTS 2 & 3 ON RP 78252
Level Datum AHD
I Level Origin PM 56277, RL 1.635m
DRIVEWAY SLAB
125mm THK WET TOOLED
SL82 MESH [CONTROL JOINT.
50mm TOP COVER f
LOWER SLAB MESH TO MAINTAIN
40mm TOP COVER CUT EVERY SECOND
WIRE 50mm CLEAR ALONG LINE OF
JOINT
TJ) TOOLED JOINT DETAIL
R16 DOWELS,
150(D) CONNOLLY 800 CTRS. (125 THICK
KEY JOINT PROFILE... [ SLAB.
‘STOP MESH 50mm.
FROM JOINT.
KJ) DANLEY KEY JOINT DETAIL
1/N12 TRIMMER,
‘50mm COVER,
PIT TRIMMER DETAIL FOR PITS
www.dialbeforeyoudig.com.au
———
DIAL1100
BEFORE YOU DIG
MAXIMUM CROSS-FALL OF 1 in 40 ON ALL
FOOT-PATHS AND INTERNAL PEDESTRIAN
PATHS AND RAMPS
EXISTING CROSSOVER. REINSTATE
KERB TO COUNCIL STADNARDS.
ENSURE SMOOTH TRANSITION FROM
NEW FOOTPATH TO NEW DRIVEWAY
EDGE, NO STEP. TYPICAL.
DRIVEWAY CROSSOVERS IN. ACCORDANCE WITH
IPWEA STD DRG R-0050 AND COUNCIL
REQUIREMENTS
KERB
NEW CONCRETE 125 FOOTPATH/PAVED
AREAS SHOWN SHADED TO COUNCIL
STANDARDS (IPWEA Drg SEQ R-065),
WAX TOOL JOINT SPACINGS AT 2.0m
CTRS, REFER LANDSCAPE ARCHITECTS
PLAN FOR SURFACE TREATMENTS.
WAX CROSSFALL GRADE OF 1 IN 40.
EXISTING CROSSOVER. REINSTATE
/ KERB TO COUNCIL STADNARDS.
os]
E
£——.#|
NEW Zin, (W) CONCRETE FOOTPATH
(ra)
|
|
2)
é |
2
2
SHE
EX. SMH
|r) | |
I
i
1
i
2
BO
rm
I
i
| st (Ta)
i POOL
UNIT 4
FFL 2.70
POOL
I
| |
3 H ca HATCHING INDICATES PROPOSED
~ ~~ 1.0m WIDE EASEMENT FOR
INTER-ALOTMENT DRAINAGE.
I
1
! 2
Li
UNIT 2 “A 2s
FFL 2.70 i BR
}
Io
[2 1.0m
Be
e 7P4
UNIT 3 | «Bs CTP
FFL 2.70 P
be
4 (i)
1.0m WIDE EASEMENT FOR EX. SOP
INTER-ALOTMENT DRAINAGE.
H.0m
SINGLE
SITE PLAN — DRIVEWAY & ACCESS
Scale 1 : 200
CONTRACTOR TO LOCATE ALL SERVICES PRIOR TO
COMMENCING WORKS ON SITE. ALL SERVICES ARE
TO BE PROTECTED IN ACCORDANCE WTH THE
AUTHORITY RESPONSIBLE FOR THE SERVICE
ALL LINE MARKING TO BE IN. ACCORDANCE
WITH THE QUEENSLAND MANUAL OF UNIFORM
TRAFFIC CONTROL DEVICES & AS 2890.1
PARKING FACLITIES PART 1: OFF-STREET CAR
PARKING
LANK
GENERAL NOTES
DEPTH
DETERMINED.
ON-SITE
PAVEMENT MATERIALS
—125mm N25 CONCRETE PAVEMENT, SL82 MESH MIDDLE
—100 THK COMPACTED BASE COURSE SAND OR CRUSHER DUST
—SUB-GRADE PREPERATION IN ACCORDANCE WITH
SPECIFICATIONS /NOTES
DRIVEWAY CARPARK PAVEMENT SECTION
~ SUBGRADE PREPERATION, REFER
LEGEND.
INDICATES EXISTING SURFACE
CONTOUR AND LEVEL 10 AHD.
EXISTING SURFACE SPOT LEVELS.
INDICATES PROPOSED FINISHED
SURFACE LEVELS
INDICATES DIRECTION OF FALL
TO FINISHED SURFACES.
125 THK. DRIVEWAY SLAB ON
COMPACTED MATERIAL, SL82 MESH,
TOP 50 COVER, FLEXIBLE JOINT
AGAINST MASONRY /CONCRETE.
100 THK. TERRACE SLAB ON
COMPACTED MATERIAL, SL72 MESH,
TOP 40 COVER, 200(W) x 200(0)
EDGE THICKENING AT UN-SUPPORTED
EDGES. FLEXIBLE JOINT AGAINST
MASONRY /CONCRETE.
DENOTES WET TOOLED JOINT 10
TERRACE SLAB, REFER TO DETAILS
DENOTES FORMED KEY JOINT TO
DRIVEWAY SLAB, DETAIL 10 DETAILS
INDICATES OVERHEAD ELECTRICITY
SUPPLY LINE
INDICATES EXISTING SEWER LINE
INDICATES WATER MAIN APPROX
ALIGNMENT, BUILDER TO CONFIRM
EXACT LOCATION PRIOR 10 WORKS
INDICATES TELSTRA LINE APPROX
ALIGNMENT, BUILDER TO CONFIRM
EXACT LOCATION PRIOR TO WORKS.
INDICATES STORMWATER DRAIN
PROPOSED AS NOTED MIN 1 IN
100 FALL UNLESS NOTED
OTHERWISE
INDICATES STORMWATER DRAIN
EXISTING AS NOTED MIN 1 IN 100
FALL UNLESS NOTED OTHERWISE
oo
pe
IK
GENERAL:
1, DO NOT SCALE FROM THIS DRAWN,
2. ALL DIMENSIONS IN MILLIMETRES
‘3. SETTING OUT DMENSIONS ARE TO BE OBTANED FROM THE
[ARCHITECTURAL DRAWINGS.
4, ANY DISCREPANCIES BETWEEN THESE DRAWING AND THE
ARCHITECTURAL ORAWINGS ARE TO BE REFERRED TO THE ENGINEER
IMMEDIATELY.
5. THE BUILDER IS RESPONSIBLE FOR LOCATING AL EXSTNG
SERVCES WITHIN AND ADJACENT THE ALLOTMENT AND SHALL ENSURE
THAT ALL NEW WORKS ARE IN ACCORDANCE WITH THE ATTACHED
CRITICAL DEPTH UNE DIAGRAM,
FOOTPATHS AND DRIVEWAYS:
|. EXISTING FOOTPATHS TO BE SAW CUT PRIOR TD REMOVAL
2. CROSSINGS ARE NOT DESIGNED FOR COMMERCIAL VEHICLES
‘3. CONCRETE DRIVEWAY TO BE 125mm THK. EXCLUDING ANY
FISHED TREATMENTS, EG. STANPING
4 CONCRETE SURFACE TOLERANCE +5.nm OVER 3.0m
5, CONCRETE N25 IN ACCORDANCE WITH AS 1379 AND AS 3600
6. REINFORCEMENT FABRIC TO AS 1304, PLACED CENTRAL SLAB
7. EXPANSION JOINTS 10 BE 10mm WOE WET TOOLED WTH EVERY
2ND MESH WRE CUT ALONG JON,
1 ONE ACCESS PONT PERMITTED FOR EACH ALLOTMENT,
9. FOR CURVED DRIVEWAYS, MAMMUM GRADES APPLY TO INSIDE
EDGE OF CURVE
10. ALL SERVICES TO BE LOCATED AND PROTECTED AS REQUIRED
PRIOR TO WORK COMMENCING
HYDRAULICS
1, HYDRAULIC SERVICES SHOWN ARE DIAGRAMATIC ONLY, REFER TO
ARCHITECTURAL DRAWINGS FOR LOCATIONS OF FIXTURES.
2, ALL SANTARY HYDRAULICS AND WATER RETIOULATION WITHIN THE
ALLOTMENT BOUNDARY TO BE IN ACCORDANCE WTH AS3500.
3. ALL WORK SHALL COMPLY WTH THE RECUREMENTS OF AUTHORITIES
HAVING JURISDICTION, AFTER OBTAINNG ALL NECESSARY PERMITS AND
APPROVALS,
4, THE CONTRACTOR IS TO CONFIRN THE POSITON OF ALL ESTING
SERVICES AS NOICATED ON THESE AND ASSOGATED PLANS PRIOR TO
THE COMMENCING OF WORK.
5, STORMWATER DRANAGE PIPES SHALL BE CLASS SH UPVC OR CLASS
2. RCP RUBBER RING JONTED PIPE AS NOTED LAID AT A MINMUM
GRADE OF 1 IN 100 UN, JOINS ARE TO BE CONSTRUCTED IN
ACCORDANCE. WITHTHE MANUFACTURERS REQUIREMENTS,
6 SEWERS 100MM DIAM, UPVC UNO. AND LAD AT A MIMUM GRADE
oF 1 60,
7, WATER SUPPLY PIPEWORK BELOW GROUND 1S TO BE ;
53UM DIAM, OR LESS — HIGH DENSITY TYPE. 50,
CLASS 12 POLYETHYLENE
8. ALL ABOVE GROUND AND INTERNAL WATER SUPPLY PIPEWORK TO BE
TYPE B COPPER.
9, WATER SERVIOES ARE NOT PERMTTED IN GROUND SLABS AND ALL
OWNS AND CONNECTIONS SHALL BE MADE ABOVE THE SLAB
10. ARE HYDRANTS ARE TO BE INSTALLED ARE TO BE INSTALLED IN
ACOORDANOE WITH ASZ419.1. HOSE REELS ARE TO BE INSTALLED IN
ACOORDANGE WITH AS2441
11, CLEAN-OUTS, INSPECTION OPENINGS AND CLOSING CAPS SITUATED IN
VEHICULAR OR PEDESTRIAN PAVEMENTS ARE TO GE FITTED WT EITHER
BRASS OR CAST-IRON COVERS.
12. ALL IN-GROUND VALVES SHALL BE IN ACCORDANCE IN APPROVED
CONCRETE PATH BOXES.
13. ALL WASTE PIPES AND WATER SERVICES PENETRATING SLABS TO BE
WRAPPED IN AN APPROVED FLELE JOINT JOINT WRAPPING.
14, THE TERM SERVICE’ REFERS TO THE MNMUM INTERNAL PIPE
DIAMETER UNLESS NOTED OTHERWISE.
KE
EX. SWPT EXISTING STORMWATER MANHOLE /PIT
EX. SCP EXISTING SEWER CONNECTION POINT
RC. HW. REINFORCED CONCRETE HEADWALL
EX. SMH EXISTING SEWER MANHOLE
EX. SWMH EXISTING STORMWATER MANHOLE
SWMH NEW 1050 STORMWATER MANHOLE
E.0B. EXISTING EDGE OF BITUMEN
kK &C EXISTING KERB & CHANNEL
NSL NATURAL SURFACE LEVEL
FH. FIRE HYDRANT
TP TELSTRA PIT
EP. ELECTRICAL POWER POLE
KERB EXISTING KERBING
(C__ | ANENDED FOR NEW ARGHTECTURALS | 08.0417
| SW & DRIVEWAY LEVELS AMENDED, [19/09/17
FOOTPATH ADDED TO SATISFY COUNGIL
A _|inro'Reuest items. (wcuI7/0004) | 07/02/17
Revision | Description Date
Issue:
FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
Te din odode tao hk dete
tawings ere expyight ond re rot to be used or reprodiced wihaut
the wiles parmision of SCE Conslng Engineers
on Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
senalacnni@sepergneascon
wena sogengineers.com
“OPERATIONAL WORKS:
DRIVEWAY & ACCESS
Lots 2 & 3 RP78252
Elizabeth St, NOOSAVILLE
Date: Drawn
Nov 16 SK
| Fass. t 26281-0W6 | C.
Page 7
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn
Checked: Drg No. Rev.
Rev. - 10.06.16
Page 8
BM: NAIL IN KERB
RL: 1.600
55 57
1. 47
57
1. .35
40
44
43
54
61
1. 1.
48
8
1.
1.
1.
1.
1.
1
1.
5
1.
PP PP
51
1. .59
56
1.
55
54
50
1
54
1.
1.
1.
1.
5
40
5
WM
1.
1.
WM
66
4
1.
5
03
1.
58
20.92 20.92
58
2.
1.
9
64
1.
5
1.
1.
COMMON PROPERTY
94
1.
66
1.
RP78252
17.10
2
2 STOREY
74
BRICK UNITS
1.
35.46
67 2 GTP395
59
1. 630m²
1.
6.09
77
72
3
66
1.
1.
1.
742m²
SHED
35.46
GTP156216
68
1.
18.36
DECK
IO
MH
LL: 1.53
CP
49
IL: 0.52
1.
65
50
47
1.
1.
1.
14.83 20.92
60
1.
2 STOREY 6 GTP671
SINGLE STOREY
4 RP72986 BLOCK & H'PLANK
BLOCK UNITS
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
LOTS 2 & 3 ON RP 78252
Level Datum AHD
Level Origin PM 56277, RL 1.635m
7
DIST STRUCTURE/ONELING WELUOWNG
EGHBOURING ALLOTMENTS
1s rooms wiour pers 1s
| Faunce ABOVE TAL
DEPT UNE AND 1S UNSTABLE
PROPOSED RETAINING WALL
|
REFER DRG 26281-OW4 FOR
PIERING OVER SEWER DETAILS [ oo
NATURAL SURFACE.
lead
22PROVED BACKELL
MATERIAL, COMPACT
NERS
SEMR
SO ita
proven eepons
MATERIAL,
A]
SEWER BEDDING AND BACKFILLING.
ORG 26281-OW4 FOR SEWER
ABOVE THE CRITICAL DEPTH LNE. .
“is Foor s aun BELOW Be Se
CBITCAL DEP UNE AND IS STALE 1 = .
STABLE ‘ ! ee E E x85—F
N 1 » x
i af
I w w W w w w W W w W
RS 08 UNOEEINONG FOUNDED BELOW THE r Sou Pe mor BLOOK RETANING WALL REE "4 Poo ata
CRITAL OPT UNE WOULD BE NEEDED TO if .
SUPPORT ANY FOOTNG THAT 5 FOANEED 1
I '
1
~ PROTECTION DETAILS
HORNA so oeceetsS
NOE
CRITICAL DEPTH LINE “HS OETA. ALSO APPLES TO BASING FOUNDATIONS ON
NEIGOOURNG PROFERTES, SHEET PLNG MUST BE
INSTALLED WHERE EOSTAG FOOTINGS WL BE FOUNDED
‘ABOVE ANY EXCAVATION CRIICAL DEPTH LNE
RP. BOUNDARY
PROPOSED NEW 'POO PIT’
MAINTAINANCE SHAFT
SL 2.55
8252 UNIT 1 1,02 (APPROX)
FFL 2.70
NEW SEWER (so) Ny i 2
BRANCH 28
ALIGNMENT BR
tena pir a, 7
| GTP395
\H a
| \\ NEW HCB's (UNITY WATER
NEW MANHOLE UNTY ~~ PROVIDE 3.0m \ APPROVED) TO BE INSTALLED
WATER ASSET. = se | EASEMENT OVER AND DEVELOPERS EXPENSE.
‘SEWER \
SL 1.59 |
LL. 0.87 (APPROX.) |
UNIT 4 eS | | GTP pt
FFL 2.70
le | | UNIT 3
je ' FFL 2.70
CIVIL CONTRACTOR TO POT HOLE AND ' \ |
EXPOSE EXISTING SEWER TO CONFIRM x | |
DEPTH PRIOR TO COMMENCING WORKS x bx own j 10 |
‘ 1 EXoSCP | |
OO SS ‘ “RP. BOUNDARY,
RP72986
SITE PLAN — PROPOSED SEWER BRANCH
Scale 1: 200
CONTRACTOR TO LOCATE ALL SERVICES PRIOR TO
COMMENCING WORKS ON SITE. ALL SERVICES ARE
TO BE PROTECTED IN ACCORDANCE WITH THE
AUTHORITY RESPONSIBLE FOR THE SERVICE
SERVICE PROVIDER & CONSTRUCTOR LIVE SEWER WORKS
-SEW_1100-1 DIA. NH [COVER] LOT DEPTH TO] warKer TARE
No. | DESCRIPTION (SOME WORKS LISTED ARE NOT SHOWN ON SEQ-SEW-1100-1 & 1100-2) | Pipe | MH No. Te [ae |e | PSE] ESL | LL | Oiveer WARNER EG TASE SHALL BC LAD ABOVE ALL
BURIED NON-NETALUC PIPES ALONG THE TOP OF THE
1 (A) | CONSTRUCTOR TO CONSTRUCT NEW SEWER MANHOLE "SMO1” OVER EXISTING BENCH AND | 150 | SMOT P2 2 | 1.590 0.870 | 0.720 EWBEDMENT ZONE OR AT 1m BELOW THE SURFACE
RENDER UP TO PIPE BUT OF PIPE. (WHICHEVER IS THE CLOSER TO GROUND SURFACE) FoR:
REFER SEQ-SEW-1200-2
CCTV SURVEY
THE CONTRACTOR IS TO ARRANGE A CCTV SURVEY OF THE
™ ” COMPLETED WORKS FOR THE APPROVAL OF UNITYWATER AND
2 (A) | CONSTRUCTOR TO CONSTRUCT NEW MAINTAINENCE SHAFT (POO PIT) "MSO1” ON LOT 3 | 150 | MSO1 Poo 3} 2550 ) 2550 | 1.010) 1.540 PRIOR TO PLACING WORKS ONTO MAINTENANCE
AND BENCH AND RENDER UP TO PIPE BUT NOT REMOVE CROWN OF PIPE. PIT AS CONSTRUCTED.
i H ‘THE CONTRACTOR IS TO PROMDE A SURVEY OF THE
www.dialbeforeyoudig.com.au 2 (B) | CONSTRUCTOR TO LAY NEW UNE "1509 uPVC" BETWEEN NEW SEWER MANHOLE “sMo" 150 2-3| 2550 | 2550 | 1.010 | 1.540 COMPLETED WORKS FOR THE APPROVAL OF UNITYNATER AND
En aR (ON LOT 2 & NEW MAINTAINENCE SHAFT (POO PIT) "SOI" ON LOT 3. 1.590 | 1.590 } 0870) 0.720 PRIOR TO PLACING WORKS ONTO MAINTENANCE
Di A L1100 2 (C) | CONSTRUCTOR TO TO INSTALL NEW HCB TO AGENCIES STANDARDS & APPROVAL, 150 2 | 2550 1010 | 1.540
BEFORE YOU DIG 2(D) | AGENCY TO COMPLETE BENCHNG FOR NEW BRANCH AFTER SUCCESSFUL “MAINTENANCE”
es INSPECTION,
RPL.
RELOCATED RP.B.
+
1
NEW POO PIT |
MAINTAIN. SHAFT
(Lo
MANHOLE!
&
Datum R.L. 1.000
‘NEW 1508 uPVC NEW 1506 HCB
LENGTH (mm) /GRADE 1 in 180 (OR 056%) MIN
FINISHED DEPTH (m) | g
INVERT LEVEL (m) | 2
SURFACE LEVEL ( z g
CHAINAGE (m) g g
SEWER CENTRE LINE PROFILE
(Scales H ~ 1:400 V ~ 1:100)
KEY
EX. SWPT EXISTING STORMWATER PIT
REINFORCED CONCRETE HEADWALL
EX. SMH EXISTING SEWER MANHOLE
E08. EXISTING EDGE OF BITUMEN
K &C EXISTING KERB & CHANNEL
NS.L NATURAL SURFACE LEVEL
FH, FIRE HYDRANT
TP TELSTRA PIT
EP. ELECTRICAL POWER POLE
KERB EXISTING KERBING
LEGEND.
INDICATES EXISTING SURFACE
yal CONTOUR AND LEVEL TO AHD.
oe EXISTING SURFACE SPOT LEVELS.
INDICATES EXISTING SEWER LINE
INDICATES NEW SEWER LINE
PROPOSED SIZE AND GRADE AS
NOTED.
(suo})— O INDICATES NEW SEWER
=a MAINTENANCE SHAFT/MANHOLE
— SW/Ex ———— __ INDICATES STORMWATER DRAIN
PROPOSED OR EXISTING AS NOTED
MIN 1 IN 100 FALL UNLESS NOTED
OTHERWISE
INDICATES OVERHEAD ELECTRICITY
SUPPLY LINE
INDICATES TELSTRA LINE APPROX
ALIGNMENT, BUILDER TO CONFIRM
EXACT LOCATION PRIOR TO WORKS
INDICATES WATER MAIN APPROX
ALIGNMENT, BUILDER TO CONFIRM
EXACT LOCATION PRIOR TO WORKS
CONSTRUCTION NOTES.
GENERAL:
1. 00 NOT SCALE FROM TH ORAWNG
2. ALL DMENSIONS IN MLUMETRES
5. SETING OUT DNENSIONS ARE TO GE OBTAINED FROW THE ARCHTECTURAL
DRAWINGS.
4, ANY OISCREPANGESS BETWEEN THESE DRAMNG AND "HE. ARCHTECTURAL
DRAWINGS ARE TO BE REFERRED TO THE ENGNEER IMMEDIATELY
5. THE BULDER IS RESPONSIBLE FOR LOCATING ALL ENSTING SERWCES
WIHIN AND ADJACENT THE ALLOTMENT AND SHALL ENSURE THAT ALL NEW
WORKS ARE IN’ ACCORDANCE WTH THE ATTACHED CRITCAL DEPTH LINE
CHAGRAN.
6. THE BULDER MUST PROTECT ALL ENISTNG NEIGHBOURING
STRUCTURES/BULONGS THROUGHOUT THE WORKS, PARTIOULARLY DURNG
EARTHWORKS. REFERENCE SHOULD BE MADE TO OUR CRITICAL OEPTH UNE.
CVAGRAM Of SEEK GUIDANCE ORECTLY FROM THIS OFFICE
FOOTPATHS AND DRIVEWAYS:
1. EXISTING FOOTPATHS TO BE SAW CUT PRIOR TO REMOVAL
2 CROSSINGS ARE NOT DESIGNED FOR COMMERCIAL VEHICLES
5. CONCRETE ORVEWAY TO BE 125mm THK. EXCLUDING ANY FINSHED
TREATMENTS, ES, STAVPING
4 CONCRETE SURFACE TOLERANCE +5.drm OVER 3.0m
5 CONCRETE N25 IN ACOORDANCE WIH AS 1379 AND AS 3600
6. REINFORCEMENT FABRIC TO AS 1304, PLACED CENTRAL SLAB DEPTH
7. EXPANSION JONTS TO BE 10mm WOE WET TOOLED WTH EVERY 2ND MESH
WRE CUT ALONG JON,
ONE ACOESS PONT PERMITTED FOR EACH ALLOTMENT.
4. FOR CURVED DRIVEWAYS, NANMUM GRADES APPLY TO INSIDE EDGE OF
ouRvE
10, ALL SERVCES 70 BE LOCATED AND PROTECTED AS REQURED PRIOR TO
WORK COMMENGING
FILLING NOTES:
THE SITE 1S TO BE SCRAPED CLEAR OF ALL ORGAN MATERIAL AND
ERR.
~ THE SUBGRADE IS TO BE PROOF ROLLED WI A WBRATING STEEL ORUM
ROLLER TO ACHEVE A MNIMUM RELATIVE FELD DENSITY OF 95%. THE
COMPACTION IS TO BE SUFACENT TO ACHEVE A BLOW COUNT OF 7 BLOWS
ER 300mm WITH AN APPROVED PERTH SAND PENETROMETER FOR A DEPTH
OF 1.0m BELOW EXCAVATED LEVEL. COPIES OF COMPACTION TEST RESULTS
SHALL BE PRESENTED TO SCG CONSULTING ENGNEERS FOR APPROVAL
= UPON THE WRITTEN APPROVAL OF THE SUBGRADE PREPERATIONS BY SCG
CONSULTING ENGNEERS THE ALLOTMENT IS TO BE FLED TO THE SPECIIED
LEVELS,
~ WE FIL MATERIAL CLEAN GRANULAR MATERAL (JE. SAND TO A CLAYEY
SAND IN ACCORDANCE WITH ASI726) BE FREE OF ANY ORGAN MATERIAL
‘NO HAVE A CLAY CONTENT OF LESS THAN 128 (PLASTIOTY INDEX LESS
THAN 25%, UNEAR SHRINKAGE OF 15%). THE PROPOSED MATERIAL 1S TO BE
INSPECTED. BY SCG CONSULTNG ENGNEERS PRIOR TO TTS REMOVAL 10
ENSURE ITS COMPATABILITY,
~ "HE FILLS TO BE PLACED AND COMPACTED IN| ACCORDANCE. WTH
‘8S3798-1996 10 A LEVEL SUFFICENT TO ACHEVE A LEVEL 2 CERTIACATION
\WTH A MINIMUM RELATIVE FIED DENSITY OF 85% COPIES OF COMPACTION
TEST RESULTS SHALL BE PRESENTED TO SCG CONSULTING ENGNEERS FOR
APPROVAL.
= FIUING AND COMPACTING ADJACENT EXISTING STRUCTURES IS TO BEN
STRICT ACCORDANGE WITH THE ASSOGATED DETALS AND SPEQFCATIONS.
~ AREAS WHERE ENSTING STRUCTURES OR TREES ARE REMOVED SHALL BE
BACKFLLED WITH THE APPROVED FILL MATERIAL COMPACTED IN ACCORDANCE
\WTH 4528701996 TO ACHEVE A MNMUM RELATIVE FELD DENSITY OF 95%
= ANY LOOSE OR SOFT MATERIAL UNCOVERED IN THE SITE PREPARATION
SHALL BE REMOVED AND REPLACED WITH THE APPROVED FLL MATERIAL
CCOMPACTED IN ACCORDANCE WTH AS2870-1895 TO ACHEVE A WINMUM
RELATIVE FILD DENSITY OF 95%
~ SITE_DRANAGE. AND SLT PROTECTION MEASURES MUST BE INSTALLED
PRIOR TO CONSTRUCTION COMMENCING
CONTRACTOR TO ARRANGE ALL APPROVALS & INSPECTIONS
REQUIRED BY THE LOCAL AUTHORITY & PAY ALL ASSOCIATED FEES
SEWER WORKS:
ALL WORK ASSOCIATED WTH LIVE SEWERS OR MANTENANCE.
HOLES SHALL BE CARRIED OUT BY UNITYWATER OR AN APPROVED
UNITWATER CONTRACTOR AT THE CONTRACTOR'S COST
UNLESS SHOWN OTHERWSE
ALL GRAVITY SEWERS SHALL BE 150mm DIAMETER uPVC CLASS SNB
IN 3.0m MAXIMUM LENGTHS. MINMUM PIPE GRADES SHALL BE:—
180 6 PIPE - 1 in 150, 225 @ PIPE — 1 in 290, 300 @ PIPE - 1 in 420
SENER MAINS AND MANHOLES SHALL BE CONSTRUCTED IN. ACCORDANCE
\WTH SEQ SEWERAGE COUE STD DWG SERES SEQ-1200 THROUGH 1500,
WERE SEWER MANS CONNECT INTO EXSTING SEVER MAINS, THE
CONTRACTOR MUST VERFY THE EXSTING LOCATION AND LEVELS OF THE
CONNECTION POINT PRIOR TO COMMENCEMENT OF ANY CONSTRUCT.
~ SEVER PIPE LINE BEDOING SHALL BE COMPACTED SAND COMPACTED TO
‘A MINMUM 65% DENSITY INDEX. AND SHALL BE PLACED IN. ACCORDANCE
\WIH SEQ SEWERAGE COOE STD DWG SERES SEQ-1200
PROVIDE DROPS IN MAINTENANCE SHAFTS AND MANHOLES AS PER SEO
SENERAGE CODE STD ORAWNGS
HOUSE CONNECTIONS BRANCHES (HOS) SHALL BE 100mm DIAMETER UPVC
‘AND INSTALLED IN. ACCORDANCE WH! SEQ SEWERAGE CODE STD DRAWINGS
HOB STUBS TO BE EXTENDED A WINMUM OF 0.5m INTO THE PROPERTY IT
SERVES. HOB LOCATION CONDUITS (ORANGE) 10 BE EXTENDED TO SURFACE
= MANHOLE OR MAINTENANCE SHAFT COVERS TO BE GAS TIGHT IN
ACCORDANCE WITH UNITYWATER'S REQUREMENTS & SEQ SEWERAGE CODE
STD DRAWINGS
= MINMUM COVER TO uPVC SNB COLLARS SHALL BE:—
ALLOTMENTS AND FOOTPATHS 0.5m
ROAD CROSSINGS 1.2m or 0.6m CLASS 18 uPVC FROM MH TO MH
(© __| AMENDED FOR NEW ARCHTEGTURALS | 09.04.17
B.__|_SEWER/BRANCH EASEMENT RELOCATED] 08.11.17.
‘A | UNITY WATER REVISIONS TO SEWER, | 23.08.17.
Revision | Deseription Date
Ts
“FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
‘The design and ossucited deals contsned on this ond associated
tawings ere expyight ond re rot to be used or reprodiced wihaut
the wiles parmision of SCE Conslng Engineers
=~ Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
a senalacnni@sepergneascon
wena sogengineers.com
“OPERATIONAL WORKS:
SEWER EXTENSION
Lots 2 & 3 RP78252
Elizabeth St, NOOSAVILLE
Date: Drawn
Nov 16 SK
| Fass. t 26281-0W8 | C.
Page 9
BM: NAIL IN KERB
RL: 1.600
57
7
7
1. .35
1. .40
61
55
44
3
4
5
1.
48
1.
54
4
8
1.
1.
1.
1.
1
1
1.
5
1.
PP PP
1
.5
59
1 5 6
1.
5
54
50
1. 5
54
1.
1.
1.
1.
55
4 0
WM
1.
1.
WM
66
54
1.
3
1.
58
0
20.92 20.92
58
2.
1.
59
4
1.
6
1.
1.
COMMON PROPERTY
94
1.
66
1.
RP78252
17.10
2
4 2 STOREY
7
1. BRICK UNITS
35.46
67 2 GTP395
59
1. 630m²
1.
6.09
7
72
3
66
.7
1.
1
1.
742m²
SHED
35.46
GTP156216
68
1.
18.36
DECK
IO
MH
LL: 1.53
IL: 0.52
1.
49 CP
50
47
65
1.
1.
1.
0 14.83 20.92
6
1.
2 STOREY 6 GTP671
SINGLE STOREY
4 RP72986 BLOCK & H'PLANK
BLOCK UNITS
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
Level Datum AHD
|
H LOTS 2 & 3 ON RP 78252
| Level Origin PM 56277, RL 1.635m
N
BOUNDARY
BLOCK BOUNDARY
WALL AS SPECIFIED.
FLLED ALLOTMENT
v a
FILLED ALLOTMENT
1809 ADJOINING DRAIN FROM
GRATE CONNECT TO 1508 UPVC ie
~ RECTANGULAR GRATE OVER,
PLAGE AT LOW PONTS
ALONG NEIGHBOURING BLOCK
y
SHEL» TYPICAL DETAIL
1509 uPVC 1 in 100 GRADE TO STORM WATER
PIT ON STREET. IL TO MATCH EXISTING GL IN
NEIGHBOURING PROPERTY.
SECTION X-X
LF RAINFALL,
ROOF RUNOFF
INFILTRATION PITS
TREAT FIRST FLUSH RUNOFF FROM ROOF'S
~STORAGE AND ONGOING INFILTRATION
REDUCES DEVELOPED SITE RUNOFF
COUNCIL STORMWATER
SYSTEM
WATER CYCLE DIAGRAMATIC
www.dialbeforeyoudig.com.au
DIAL1100
BEFORE YOU DIG
BLOCK RETANING
WALL
suing
2
2/125x75x4.0 RHS (GALV.)
LAID AT 1 in 100 MIN,
INSTALL TO NEW KERB
ADAPTORS AND MAKE
FOOTPATH GOOD.
EXISTING GROUND LEVEL IN
NEIGHBOURING PROPERTY.
AUSDRAIN ENVIROMODULE 2
INFILTRATION CELLS. REFER
DETAIL ON THIS SHEET.
CREATE FALL TOWARD
ROAD RESERVE IN FINISHED
GROUND PROFILE.
THIS SWP PROVIDED AS
DISCHARGE POINT FOR
NEIGHBOURING ALOTMENT
DRAINAGE.
EXISTING HCB's & NEW SW DRAINAGE
LINE 10 BE PROTECTED AS PER
SEWER/STORMWATER PROTECTION
DETAILS ON DRG 26281-OWt
2/125x75x4.0 RHS (GALV.)
LAID AT 1 in 100 MIN.
INSTALL TO NEW KERB
ADAPTORS AND MAKE
FOOTPATH GOOD.
EX. SCP
SW.
sw.
AS
3
HATCHING INDICATES PROPOSED 4
1.0m WIDE EASEMENT FOR
INTER-ALOTMENT DRAINAGE.
SITE PLAN — STORMWATER MANAGEMENT
Scale 1 : 200
CONTRACTOR TO LOCATE ALL SERVICES PRIOR TO
COMMENCING WORKS ON SITE. ALL SERVICES ARE
TO 8E PROTECTED IN ACCORDANCE WITH THE
AUTHORITY RESPONSIBLE FOR THE SERVICE
THIS DRAWING IS TO BE READ IN. CONJUNCTION
WITH THE STORMWATER MANAGEMENT REPORT BY
SCG CONSULTING ENGINEERS (No. 25231(SWM)
ALL PIPES TO BE LAID AT 1 IN 100 MIN
UNLESS NOTED
1.0m
STORMWATER
INFLOW t
\ FALL LANDSCAPED AREAS 10
\ FORMED FLOW PATHS TO DIVERT
RUNOFF TO SW PITS. 1 in 100
MIN FALL. TYPICAL.
AUSDRAIN ENVIROMODULE 2
INFILTRATION CELLS 10 IN LINE,
WRAPPED IN GEOFABRIC
LOS
0
LEGEND
INDICATES EXISTING SURFACE
4800
CONTOUR AND LEVEL TO AHD.
oe
* EXISTING SURFACE SPOT LEVELS.
INDICATES DIRECTION OF FALL
TO FINISHED SPOON DRAINS.
INDICATES PROPOSED FINISHED
SURFACE LEVELS
150(W) GRATED DRAIN WITH
HEAVY DUTY GRATE.
450Sq PIPE JUNCTION BOX WITH
BOLTED LID, PRE-CAST
CONCRETE.
450Sq FIELD INLET, PRE-CAST
CONCRETE WITH RAISED GRATE FOR
LANDSCAPED AREA DRAINAGE.
oP
300Sq FIELD INLET, PRE-CAST
ELIZABETH STREET FE) CONCRETE WTH RAISED GRATE FOR
FALL LANDSCAPED AREAS TO LANDSCAPED AREA DRAINAGE.
FORMED FLOW PATHS TO DIVERT &
[— RUNOFF TO GRATED DRAINS AND 2/125x75x4.0.RHS (CALY.) &S STORMWATER VERT. INLETS TO
SW PITS. 1 in 100 MIN FALL. LAID AT 1 in 100 MIN. [I ~—COLLECT PONDING FROM
TYPICAL. INSTALL TO NEW KERB NEIGHBORING PROPERTY.
ADAPTORS. AND MAKE REFER DETAIL
2 Ss 2 FOOTPATH 6000. ; INDICATES PROPOSED STORMWATER
— T g 2S sw DRAIN EXISTING MIN t in 100
—£—{_—T1r £3 nEep GRADE U.N.O
oF i
eT Yi i" Wan " OP DENOTES APPROXIMATE DOWNPIPE
_ =P -BOUNBARY —_ LOCATIONS TO BE CONFIRMED BY
i! See} — ARCHITECT AND HYDRAULIC
POOL =| DESIGNER
| POOL AUSDRAIN ENVIROMODULE 2
>! INFILTRATION CGELLS. REFER
S| 1508 uPVC @ 1:100 5 “ll, DETAIL ON THIS SHEET.
3
3| OP 1009 uPYe, @ 1:100
' ae HATCHING INDICATES PROPOSED
8252 S| \t s 1.0m WIDE EASEMENT FOR
oF UNIT 1 | INTER-ALOTMENT DRAINAGE,
| FFL 2.70 2
1 S
{oa
—_—_ = LOCATE STORMWATER PITS
sue] © Io — AT LOW POINT ON
g S NEIGHBOURING PROPERTY
& UNIT 4 [om REFER TYPICAL DETAIL.
3 FFL 2.70 V7 AP &
UNIT 3 2 ori
a FFL 270 ois
o ’
=
NN 4
PROVIDE INSPECTION OPENINGS
(|.0.S) FROM SLOTTED PIPE IN
BASE FOR FLUSH OUT or
OVERFLOW GRATE WHERE NO
STORMWATER OUTLET
-
V0.5 STORMWATER
OT OUTFLOW
[3
AK
a
PROVIDE DROPS AT EACH END
OF THE PIT FROM THE MAIN
PROVIDE SLOTTED PIPE
‘—— THROUGH BOTTOM OF
CELLS
AUSDRAIN_ INFILTRATION SOAKER PIT DETAIL
THROUGH DRAIN 10 THE
SLOTTED PIPE IN THE BASE
ALL PIPE PENETRATIONS THROUGH THE GEOFABRIC TO
BE FITTED WITH STAINLESS STEEL PIPE CLAMPS,
GEOFABRIC TO BE LAPPED AT JOINS WITH A ROOT
INHIBITOR PROVIDED ALONG THE JOIN LINES
CONSTRUCTION NOTES,
GENERAL:
1. DO NOT SCALE FROM THS DRANG,
2. ALL DIMENSIONS IN MILLMETRES
‘3. SETING OUT DMENSONS ARE TO BE OBTAINED FROM THE
"ARCHITECTURAL DRAWINGS.
4, ANY OISCREPANES BETWEEN THESE ORAWNG AND THE
ARCHITECTURAL ORAWINGS ARE TO BE REFERRED TO THE ENGINEER
IMMEDIATELY
5. THE BULDER IS RESPONSIBLE FOR LOCATING ALL EXSTNG
SERVICES WTHIN AND ADJACENT THE ALLOTMENT AND SHALL ENSURE
THAT ALL NEW WORKS ARE IN’ ACCORDANCE WTH THE ATTACHED
CRITICAL DEPTH LINE DIAGRAM.
FOOTPATHS AND DRIVEWAYS:
1. DISING FOOTPATHS TO BE SAW CUT PRIOR TO REMOVAL
2. CROSSINGS ARE_NOT DESIGNED FOR COMMERCIAL. VEHICLES
‘3. CONCRETE DRVEWAY TO BE 125mm THK. EXCLUDING ANY
FINSHED TREATMENTS, EC. STAMPING
4 CONCRETE SURFACE TOLERANCE +5.0mm OVER 3.0m
5. CONCRETE N25 IN. ACCORDANCE NTH AS 1379 AND AS 3600
6. REINFORCEMENT FABRIC TO AS 1304, PLACED CENTRAL SLAB
7, EXPANSION JOINTS TO BE 10mm WDE WET TOOLED WITH EVERY
2ND MESH WRE CUT ALONG JONT,
{8 ONE ACCESS PONT PERMITTED FOR EACH ALLOTMENT.
9, FOR CURVED DRIVEWAYS, MAKMUM GRADES APPLY TO INSIDE
EDCE OF CURVE
10, ALL SERVCES 10 BE LOCATED AND PROTECTED AS REQUIRED
PRIOR TO WORK COMMENGNS
HYDRAULICS
1. HYDRAUUC SERVICES SHOWN ARE DIAGRAMATIC ONLY. REFER TO
[ARCHITECTURAL DRAWINGS FOR LOCATIONS OF FXTURES.
2. ALL SANTARY HYDRAULICS AND WATER REGULATION THIN THE
'AILOTMENT BOUNDARY 70 BE IN ACCORDANCE. WITH AS3500.
‘3. ALL WORK SHAUL COMPLY WH THE REQUREMENTS OF AUTHORIMES
HAVING JURISDICTION, AFTER OBTANNG ALL NECESSARY PERMITS AND
APPROVALS,
4 THE CONTRACTOR IS TO CONFIRM THE POSTON OF ALL EXSTING
SERVICES AS INDICATED ON THESE AND ASSOCIATED PLANS PRIOR TO
THE COMMENCING OF WORK.
5, STORMWATER DRANAGE PIPES SHALL BE CLASS SH UPVC OR CLASS
‘2 RCP RUBBER RING JONTED PPE AS NOTED LAD AT A MINMUM
(GRADE OF 1 IN 100 UNO. JOINS ARE TO BE CONSTRUCTED IN
‘ACCORDANCE WTH THE MANUFACTURERS REQUIREMENTS.
6, SEWERS 100MM DIAM. UPVC UN.O. AND LAD AT A MAIMUM GRADE
OF 1 WN 60,
7. WATER SUPPLY PPEWORK BELOW GROUND 15 TO BE ;
63MM DIAM, OR LESS ~ HIGH DENSITY TYPE 50
CLASS 12 POLYETHYLENE
8. ALL ABOVE GROUND AND INTERNAL WATER SUPPLY PPEWORK TO BE
TYPE B COPFER,
9, WATER SERVICES ARE NOT PERMITTED IN GROUND SLABS AND ALL
ONS AND CONNECTIONS SHALL BE MADE ABOVE THE SLAB.
10, FIRE HYDRANTS ARE TO BE INSTAILED ARE TO BE STALLED IN
[ACCORDANCE WTH ASZ419.1. HOSE REELS ARE TO BE INSTALLED IN
‘ACCORDANCE WITH AS2441.
1, CLEAN-OUTS, INSPECTION OPENINGS AND CLOSING CAPS STUATED IN
VEHICULAR OR PEDESTRIAN PAVEMENTS ARE TO BE FITTED WTH EITHER
BRASS OR CAST-IRON COVERS.
12, ALL IN~GROUND VALVES SHALL BE IN ACCORDANCE IN| APPROVED
(CONCRETE PATH BOXES.
13, ALL WASTE PIPES AND WATER SERVICES PENETRATING SLABS TO BE
WRAPPED IN AN APPROVED FLEMELE ONT JOINT WRAPPING
14, THE TERM SERVICE” REFERS TO THE MINMUM INTERNAL PIPE
DIAMETER UNLESS NOTED OTHERWSE,
KEY.
EX. SWPT EXISTING STORMWATER MANHOLE/PIT
EX. SCP EXISTING SEWER CONNECTION POINT
RC. HW. — REINFORCED CONCRETE HEADWALL
EX. SMH EXISTING SEWER MANHOLE
EX. SWMH EXISTING STORMWATER MANHOLE
SWMH NEW 1050 STORMWATER MANHOLE
E.0.8. EXISTING EDGE OF BITUMEN
K &C EXISTING KERB & CHANNEL
NS.L NATURAL SURFACE LEVEL
FH, FIRE HYDRANT
TP TELSTRA PIT
EP. ELECTRICAL POWER POLE
KERB EXISTING KERBING
8 __| SW & DRIVEWAY LEVELS AMENDED, [19709717
'SWP's_ADDED TO SATISFY COUNCIL
A _|inro"eeauesr itew 1 (wcut7/o004) | 07/02/17
Revision
"FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
‘The design and ossucited deals contsned on this ond associated
tawings ere expyight ond re rot to be used or reprodiced wihaut
the wiles parmision of SCE Conslng Engineers
C) sce
OPERATIONAL WORKS:
STORMWATER MANAGEMENT
Lots 2 & 3 RP78252
Elizabeth St, NOOSAVILLE
Description Date
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
senalacnni@sepergneascon
wena sogengineers.com
a enorme
Pate! Nov 16 | csk
Checked DrgNo
| RSs, N |26281-Swi | B.
Used in these records
Attachment B - Engineering plans.pdfRelated documentApplication case desk ↗
Attachment B - Engineering plans.pdfRelated documentApplication case desk ↗
Attachment A - Engineering plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.