Attachment B - Engineering plans · MCU17/0004.01
Attached to the e-mail Change to Development Approvals - MCU17/0004.01 & OPW17/0005.01.
Attached to the e-mail FW Lodgement of Operational works application - 46- 48 Elizabeth Street Noosaville.msg.
Plans and drawings: the text below has words only, no drawings.
BM: NAIL IN KERB
RL: 1.600
55 57
1. 47
7
1. .35
0
44
43
54
61
5
1.
4
1.
48
8
1.
1.
1.
1.
1.
1
1.
5
1.
PP PP
51
1. .59
56
1.
55
54
50
1
4
1.
5
1.
1.
1.
55
40
WM
1.
1.
WM
66
54
1.
03
1.
58
20.92 20.92
58
2.
1.
59
64
1.
1.
1.
COMMON PROPERTY
94
1.
66
1.
RP78252
17.10 2
2 STOREY
74
BRICK UNITS
1.
35.46
67 2 GTP395
59
1. 630m²
1.
6.09
7
72
3
66
.7
1.
1
1.
742m²
SHED
35.46
GTP156216
68
1.
18.36
DECK
IO
MH
LL: 1.53
CP
49
IL: 0.52
1.
65
50
47
1.
1.
1.
14.83 20.92
60
1.
2 STOREY 6 GTP671
SINGLE STOREY
4 RP72986 BLOCK & H'PLANK
BLOCK UNITS
Issue:
Unit 1/11 Project Ave,
Noosa Heads
Ph (07) 5455 5604
DEBUILD T/A
email:[email protected]
web:www.scg-engineers.com
ABN 40 098 481 899
Title:
Project
Date: Drawn
Checked: Drg No. Rev.
Rev. - 10.06.16
[OCR of page images]
DRAWING SIZE — Al
| LOTS 2 & 3 ON RP 78252
‘ Level Datum AHD
N Level Origin PM 56277, RL 1.635m
|
\
www.dialbeforeyoudig.com.au
———
DIAL1100
BEFORE YOU DIG
80-120mm AGGREGATE
(NO FINES) HARD STAND
OVERLAY FOR DELIVERY'S. \
DURING CONSTRUCTION. \
CREATE BUNDING IN TEMPORARY
HARDSTAND FOR DIVERISION INTO
SILT FENCES.
|
{
le
i%
3
8
1283
yl 3
: a
' 2 ‘
fit =|
I |
id | |
‘| e |
lle EXISTING SEWER CONNECHION
io PONT TO BE RELOCATED! cLEAR |
[hes OF PROPOSED STRUCTURES 10
iL UNITY WATER STANDARDS AND Td.
% ia DEVELOPERS EXPENSE. |
a EX. SMH il 1
|
HBX. sop |
— Le H
bk [eee
re
EX. SCP
SINGLE STOREY 4 RP72986
SITE PLAN — SILT & SEDIMENT EROSION CONTROL
Scale 1: 200
CONTRACTOR TO LOCATE ALL SERVICES PRIOR TO
COMMENCING WORKS ON SITE, ALL SERVICES ARE
TO BE PROTECTED IN ACCORDANCE WITH THE
AUTHORITY RESPONSIBLE FOR THE SERVICE
‘SITE DRAINAGE — CONSTRUCTION
ENSURE GROUND PROFILE DURING CONSTRUCTION FALLS
TOWARDS THE CENTRE OF THE ALLOTNENT THEN TOWARDS
THE FRONT BOUNDARY NHERE RUNOFF WLL DRAIN THROUGH
THE SILT FENCES, IN NO INSTANCE SHALL THE ALLOTMENT
RAIN INTO NEIGHBOURING ALLOTMENTS,
SITE_ORAINAGE — CONSTRUCTION
CONSTRUCTED STORM WATER PITS WITHIN THE SITE ARE TO
BE COVERED UNTIL THE SITE IS CONPLETED OR TO BE
FITTED WTH SILT PROTECTION MEASURES TO THE APPROVAL
OF THE ENGINEER
FALL SITE TOWARDS
\'& SILT FENCES.
PROPOSED
GTP395
aye roges
R.P. BOUNDARY
= SLE- — SLE
DUST MOBILISATION FROM WIND ACTION
SITE CONTROL TO INCLUDE PROTECTION AGAINST THE
CARRIAGE OF SOIL SEDIMENT FROM WIND ACTIONS. SITE
FOREMAN TO COVER ALL STOCKPILES WITH HESION OR
SIMILIAR, PROVIDE SILT FENCING AROUND BASE OF
STOCKPILES
MAINTENANCE OF SILT PROTECTION
‘SITE FOREMAN TO MAINTAIN ALL SILT AND SEDIMENT
PROTECTION MEASURES THROUGHOUT THE DURATION OF
THE PROJECT. ANY BREACHING OF THE PROTECTION
MEASURES MUST BE REMEDIATED IMMEDIATELY AND
REPORTED TO THE ENGINEER FOR CORRECTION MEASURES.
SILT RUNOFF PROTECTION IS TO BE MAINTAINED UNTIL
‘SUCH POINT THAT LANDSCAPING IS COMPLETED AND NOT
SUSCEPTABLE TO STORMWATER SCOUR.
LEGEND CONSTRUCTION NOTES.
GENERAL:
‘ 1-00 NOT SCALE FROM THS ORAMNG
< 2. ALL DMENSONS I MLLWETRES
EXISTING SURFACE SPOT LEVELS. 3, SETTING OUT DIMENSIONS ARE TO BE OBTAINED FROM THE ARCHITECTURAL
ORAWNCS.
4. ANY OISREPANDES BETWEEN THESE DRAWNG AND THE ARCHTECTRAL
—sur—_ SILT RETENTION FENCE TO DETAIL ORAWNGS ARE TOBE REFERRED TO HE ENGREER MUEDATELY
Sr BADER RESPONSI 0% ICATG AL XSTNG SERVES
———— E ————_INDICATES OVERHEAD ELECTRICITY WITHIN AND ADJACENT THE ALLOTMENT AND SHALL ENSURE THAT ALL NEW
SUPPLY INE fe ATM Me TCD es OP
A
FOOTPATHS AND DRIVEWAYS:
INDICATES EXISTING SEWER LINE 1VERSING FOOTPATH CUT ROR 7 RENOVA
2 aso Ae HOT DESENED FOR COMEGAL VOLES
5: GONE OVEN TO 5m I ELON ANT NSD
———— \y —————__ INDICATES WATER MAIN APPROX TREATMENTS, e STAPH : Re CEN A INSH
ALIGNMENT, BUILDER TO CONFIRM POOR SAFCE TOLRINE 45cm MER 3.0m
ARON OGATION PROS 40 WORKS 5 COE 3 N-ACOOME WT HS TTe A BS 360
6. REINFORCEMENT FABRIC TO AS 1304, PLACED CENTRAL SLAB DEPTH
7, EXPANSION JONTS TO BE 10mm WDE WET TOOLED WTH EVERY 2ND MESH
WRE CUT ALONG JONT.
SW/EX INDICATES EXISTING STORMWATER 8. ONE ACCESS POINT PERMITTED FOR EACH ALLOTMENT.
DRAIN 8 FR CURVED ORVENAN, MAM RIDES APPLY TO MSDE EDGE OF
10, ALL SERWGES TO BE LOCATED AND PROTECTED AS REQUIRED PRIOR 10
WORK COMMENCING
FILLING NOTES:
THE STE I TO BE SCRAPED CLEAR OF ALL ORGANIC MATERIAL AND
DEBRIS.
— THE SUBGRADE 1S TO BE ROLLED WTH A WBRATING STEEL DRUM
ROLLER TO ACHEVE A WINMUM RELATIVE FELD DENSITY OF 95% THE
COMPACTION IS TO BE SUFFICIENT TO ACHIEVE A BLOW COUNT OF 7
BLOWS PER 300mm WITH AN APPROVED PERTH SAND PENETROMETER
FOR A DEPTH OF 1.0m BELOW EXCAVATED LEVEL. COPIES OF
‘COMPACTION TEST RESULTS SHALL BE PRESENTED TO SOG CONSULTING
ENGINEERS FOR APPROVAL.
THE FILL MATERIAL CLEAN GRANULAR MATERIAL (IE. SAND TO A
CLAYEY SAND IN ACCORDANCE WITH ASI726) BE FREE OF ANY
ORGANIC MATERIAL AND HAVE A CLAY CONTENT OF LESS THAN 12%
(PLASTICITY INDEX LESS THAN 25%, LINEAR SHRINKAGE OF 15%). THE
PROPOSED MATERIAL IS TO BE INSPECTED BY SCG CONSULTING
ENGINEERS PRIOR TO ITS REMOVAL TO ENSURE ITS COMPATABILITY.
~ THE FIL 1S TO BE PLACED AND COMPACTED IN ACCORDANCE WITH
‘AS3798—1996 TO A LEVEL SUFFICIENT TO ACHEVE A LEVEL 1
CERTIFICATION WTH A MINMUM RELATIVE FELD DENSITY OF 95%
COPIES OF COMPACTION TEST RESULTS SHALL BE PRESENTED TO SCG
CONSULTING ENGINEERS FOR APPROVAL.
— FILLING AND COMPACTING ADJACENT ENSIMNG STRUCTURES IS TO BE
IN STRICT ACCORDANCE WTH THE ASSOCIATED DETALS AND
SPEOFCATIONS.
— AREAS WHERE EXISTING STRUCTURES OR TREES ARE REMOVED SHALL
BE BACKFILLED WTH THE APPROVED FILL MATERIAL COMPACTED IN
ACCORDANCE WTH AS2870-1996 TO ACHIEVE A MNMUM RELATE
FELD DENSITY OF 95%
~ ANY LOOSE OR SOFT MATERIAL UNCOVERED IN THE STE
PREPARATION SHALL BE REMOVED AND REPLACED WITH THE APPROVED
FILL MATERIAL COMPACTED IN ACCORDANCE WITH AS2870-1996 TO
ACHEVE A MINMUM RELATIVE FELD DENSITY OF 95%
— SITE DRANAGE AND SILT PROTECTION MEASURES MUST BE (STALLED
PRIOR TO CONSTRUCTION COMMENCING
900(W) GEO-FABRIC SILT
FENCE, FIXED TO SPIKES AND -—§
BURIED 300 INTO STABLE
GROUND.
SILT RETENTION
THE CONTRACTOR IS TO INSTALL APPROVED SILT
RETENTION FENCES PRIOR TO COMMENCING ANY
EARTHWORKS. THE FENCE IS TO BE CONSTRUCTED
ALONG THE LOWEST BOUNDARY AND RETURNED UP
SIDE BOUNDARIES TO ENSURE FULL STORMWATER
ENTRAPMENT. SURFACE RUNOFF FROM WITHIN THE
ALLLOTMENT MUST DRAIN TOWARDS THE FENCE AND
SHALL NOT ENTER NIEGHBOURING ALLOTMENTS
THROUGH THE USE OF SURFACE BUNDING OR
SCOUR PROTECTED DRAINS. THE FENCE MUST
\f wl re REMAIN IN PLACE UNTIL SUCH TIME THAT FINISHED
Fy LANDSCAPING AND DRAINAGE MEASURES ARE.
E] INSTALLED
SILT FENCE DETAIL
1200(L) 50 SQ. HOWD
SPIKES, 1800 CTRS DRIVE
600 INTO GROUND.
| AVENDED FOR NEW ARCHTEGTURATS [0B 047
Rsion | Deserition Date
Tssue:
FOR APPROVAL
DO NOT SCALE FROM THIS DRAWING
KEY “re desin ond osaited detlscetained on this ond asoitd
ovis cy endo foe ede eye iat
EX. SWPT EXISTING STORMWATER MANHOLE /PIT ‘the witten permission of SCG Consulting Engineers.
EX SOP EXISTING SEWER CONNECTION POINT -———
RC. HW. REINFORCED CONCRETE. HEADWALL es SCG Noosa Heads’
EX SMH EXISTING SEWER MANHOLE
EX. SWMH EXISTING STORMWATER MANHOLE 5 ) tolsengsegargrscon
‘SWMH NEW 1050 STORMWATER MANHOLE 2 Nee: web: ww sog-engineers.com
£08. EXISTING EDGE OF BITUMEN H
K&C EXISTING KERB & CHANNEL Tue
NISL NATURAL SURFACE LEVEL
FH FIRE HYDRANT OPERATIONAL WORKS:
TP TELSTRA PIT
EP. ELECTRICAL POWER POLE SILT & SEDIMENT CONTROL
KERB EXISTING KERBING oe
Project
Lots 2 & 3 RP78252
Elizabeth St, NOOSAVILLE
Pate Nov 16 | gk
| Fass. t 26281-0W2| A.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment B - Engineering plans.pdfRelated documentApplication case desk ↗
Attachment B - Engineering plans.pdfRelated documentApplication case desk ↗
Attachment A - Engineering plans.pdfRelated documentApplication case desk ↗
About this file
- File size
- 3.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.