Request for Change to Development Approval 51975.3702.03 (TPC 545)
Very large file (23.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
.
.r .
The attached plans provide for calculations of existing and proposed site cover and GFA. The
proposed calculations shown, also includes the works proposed to Lot 1 (part of separate MCU
application) and which demonstrate compliance with current planning scheme provisions.
The proposed change will not change the approved use of the site; only marginally increases site
cover and floor area; does not trigger the need for any additional carparking; and will provide
substantial visual amenity improvements.
Sustainable Planning Act 2009
The Sustainable Planning Act 2009 stipulates circumstances under which a Change to a Development
Approval can be considered by the Assessment Manager.
A permissible change/ for a development approva~ is a change to the approval that would not-
(a)result in a substantially different development; or
(b)ifthe application for the approval were remade including the change-
(i)require referral to additional concurrence agencies; or
(ii)for an approval for assessable development thatpreviously did not require impact
assessment-require impact assessment; or
(c)for an approval for assessable development thatpreviously required impact assessment-be likely,
in the responsible entity’s opinion to cause a person to make a properly made submission
objecting to the proposed change/ ifthe circumstances allowed; or
(d)cause development to which the approval relates to include any prohibited development
The proposed change meets this criterion as follows:
. The change does not result in a substantially different development, as the change only provides
for refurbishments and minor extension works to the existing development and does not result in
any change or intensification of the use. The change will result in visual amenity improvements;
. There were no concurrence agencies with the original application and if remade would not require
referral to any additional concurrence agencies;
. The original Town Planning Consent application was subject to Impact Assessment;
. The change is unlikely to cause a person to make a properly made submission if the
circumstances allowed as the change provides for amenity improvements and refurbishments to
the existing built form; and
. Does not include any prohibited development.
In light of the above, it is considered that the proposed change which complies with the provisions of
the Sustainable Planning Act 2009, is minor in nature, does not change the approved use of the site,
does not offend the intent of the original approval and does not conflict with current planning scheme
provisions. Approval of the request to change the development approval is therefore warranted.
Should you have any questions with respect to the above, please do not hesitate to contact me direct.
Yours faithfully
KHA DEVELOPMENT MANAGERS
Scott Sobey
DIRECTOR
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Change to Development Approval 51975.3702.03 (TPC 545)Related documentApplication case desk ↗
About this file
- File size
- 23.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.