stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete · MCU18/0165
Attached to the e-mail Multiple Housing Type 4 Conventional - 17 units (Proposal Plans & Stormwater Management Plan) - MCU18/0165.
25 Kauri St Cooroy Image 4-2 – Total Site Un-Mitigated Design Runoff Hydrographs Table 4-4 shows a comparison of peak flow rates between the base case and un-mitigated developed case. It shows the impact of the proposed development is an increase in peak site runoff ranging from 27% to 57%. Table 4-4 Peak Flow Comparison - Base Case Vs Un-Mitigated Developed Case Un-Mitigated Existing Site Difference Difference Event Developed Case (m3/s) (m3/s) (%) (m3/s) 1% AEP 0.23 0.30 0.07 30% 10% AEP 0.15 0.19 0.04 27% 50% AEP 0.07 0.11 0.04 57% J00300R1V1 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.