Council archive · source document
stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete · MCU18/0165
Attached to the e-mail Multiple Housing Type 4 Conventional - 17 units (Proposal Plans & Stormwater Management Plan) - MCU18/0165.
25 Kauri St Cooroy Image 4-1 – Total Existing Site Design Runoff Hydrographs 4.2 Un-Mitigated Developed Case The development has been incorporated into the WBNM modelling by updating the fraction impervious values to reflect the proposed developed layout as shown in Appendix B. All proposed roof and road areas have been assigned a fraction impervious of 100% impervious and the remaining site ground level has been assigned a fraction impervious of 30% to account for pathways etc. The resulting overall fraction impervious for the developed site is 73% and this has been assigned to the developed case WBNM model. The adopted ensemble hydrograph for each AEP event is shown on Image 4-2. Peak flows and the associated critical storm duration are also labelled. These hydrographs represent the design storm runoff from the full un-mitigated developed site. J00300R1V1 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.