Council archive · source document
stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete · MCU18/0165
Attached to the e-mail Multiple Housing Type 4 Conventional - 17 units (Proposal Plans & Stormwater Management Plan) - MCU18/0165.
25 Kauri St Cooroy Table 4-2 Pervious Area Initial Loss (mm) Duration 50% AEP 10% AEP 1% AEP 5 min 29.5 25.3 22.2 10 min 29.5 25.3 22.2 15 min 29.5 25.3 22.2 20 min 29.5 25.3 22.2 25 min 29.5 25.3 22.2 30 min 29.5 25.3 22.2 45 min 29.5 25.3 22.2 1 hour 29.5 25.3 22.2 1.50 hour 29.2 19.7 18.5 2 hours 23.8 13.9 11.8 3 hours 15 0.7 0 BoM’s ARR 2016 Rainfall IFD data has been used for this investigation. Design rainfall depths are shown on Table 4-3. Table 4-3 Design Rainfall Depths (mm) Duration 50% AEP 10% AEP 1% AEP 5 min 11.3 17.9 26.3 10 min 18.3 28.7 41.2 15 min 23.2 36.4 52 20 min 27 42.3 60.8 25 min 30.1 47.3 68.3 30 min 32.7 51.5 74.9 45 min 38.9 61.9 91.5 1 hour 43.8 70.2 105 1.5 hour 51.4 83.7 128 2 hour 57.6 94.8 147 3 hour 67.7 113 178 4.5 hour 79.8 136 217 6 hour 89.9 156 251 9 hour 106 188 306 12 hour 119 214 353 18 hour 140 256 428 24 hour 156 289 489 The adopted ensemble hydrograph for each AEP event is shown on Image 4-1. Peak flows and the associated critical storm duration are also labelled. These hydrographs represent the design storm runoff from the full existing site. Peak site runoff for the 1% AEP design event is predicted to be 0.23m3/s. J00300R1V1 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
stormwater mgJ00300R1V1_25_Kauri_St_Cooroy_Complete.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.