Development Application part 2 Planning Report MCU13/0051
Very large file (109 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Figure 5.5: Aerial Photograph illustrating photo locations
The site access is considered to be appropriate given the NBN Co facility will not be a
significant generator of traffic. Once operational, the facility will require maintenance visits
approximately once per year, but will remain unattended at all other times. As the facility
generates minimal vehicle trips, it is considered that traffic interference will be negligible.
During the construction phase, a truck will be used to deliver the equipment and a crane
will be used to lift the equipment into place. Any traffic impacts associated with
construction will be of a short-term duration and are not anticipated to adversely impact on
the surrounding road network. In the unlikely event that road closure will be required; NBN
Co will apply to the relevant authorities for permission.
5.1.4 Installation Details
A total construction period of approximately ten weeks (including Civil works and network
integration and equipment commissioning) is anticipated. Construction activities will
involve four basic stages:
. Stage 1 (Week 1) -
Site preparation works, including field testing, excavation and
construction of foundations;
NBN-4TNZ-4INN-5104 -
Cooran Page 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 Planning Report MCU13/0051Related documentApplication case desk ↗
About this file
- File size
- 109 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.